HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    W Philadelphia & Element Philadelphia Hotel in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Philadelphia Skyscraper Diagram

Map Location
Philadelphia Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #1141  
Old Posted Oct 13, 2015, 2:01 PM
boxbot's Avatar
boxbot boxbot is offline
Registered User
 
Join Date: Feb 2014
Location: Delco., Pa.
Posts: 842
Quote:
Originally Posted by thisisforreal View Post
Multiple dump trucks on site getting filled with dirt. Pics coming soon.
They're just taking the dirt on a ride around the block then dumping it back on the site.
     
     
  #1142  
Old Posted Oct 13, 2015, 2:07 PM
thisisforreal's Avatar
thisisforreal thisisforreal is offline
Registered User
 
Join Date: Jun 2014
Posts: 752
Oct 5th:


Oct 13th:


Is it time to do the Ron Paul GIF again?
     
     
  #1143  
Old Posted Oct 13, 2015, 2:19 PM
Knight Hospitaller's Avatar
Knight Hospitaller Knight Hospitaller is offline
Registered User
 
Join Date: Jul 2015
Location: Greater Philadelphia
Posts: 2,949
Good thing this wasn't an Olde City archaeological site on top of everything else. Pray that they don't find any Lenni Lenape arrowheads.
     
     
  #1144  
Old Posted Oct 13, 2015, 4:02 PM
PhilliesPhan's Avatar
PhilliesPhan PhilliesPhan is online now
Registered User
 
Join Date: Aug 2014
Location: Philadelphia
Posts: 1,351
Quote:
Originally Posted by thisisforreal View Post
Oct 5th:


Oct 13th:


Is it time to do the Ron Paul GIF again?
At least there is visibly more shoring installed at the site. Hopefully this excavation speeds up soon. I'm anxious!
     
     
  #1145  
Old Posted Oct 13, 2015, 4:54 PM
Knight Hospitaller's Avatar
Knight Hospitaller Knight Hospitaller is offline
Registered User
 
Join Date: Jul 2015
Location: Greater Philadelphia
Posts: 2,949
Quote:
Originally Posted by PhilliesPhan View Post
At least there is visibly more shoring installed at the site. Hopefully this excavation speeds up soon. I'm anxious!
This very much looks like the beginning of real excavation. "ThisIsForReal" is living up to his screen name today!
     
     
  #1146  
Old Posted Oct 13, 2015, 7:35 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
nice to see a truck being loaded with dirt for a change
     
     
  #1147  
Old Posted Oct 15, 2015, 1:30 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
Update from Brook

Quote:
I also had to reach an Agreement with the neighbors to take down the one story storage shed that holds trash cans and is between the Girard building and the Ritz hotel building and on the Residences at the Ritz site that also was trespassing on my site. The Agreement needed to be agreed to by four separate parties including Marriot. Now the city is stopping progress because they are taking 4 weeks +/- to issue the permit to take down the one story structure. Until it is down we can't finish the last soldier piles and really start hauling a lot of dirt. I'm hoping we have the permit to take down the one story trash can holding structure today.

You were right though when you said (at least I think you said) that there is a ton of stuff we didn't expect underground like all of the Morris building including basements and sub basements and internal and exterior walls as well as concrete and steel and railroad tracks and vaults and steel plates and all sorts of other stuff.
Quote:
Removing structure & foundations 28'-30' below grade at soldier pile #61.

Great picture showing the Morris building shared wall still in place. TPBC is currently 30' down and still hitting structure.


Quote:
Steel beams encased in concrete , 23-25' below grade, being removed for soldier drilling.
     
     
  #1148  
Old Posted Oct 15, 2015, 1:32 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
And an update I took myself today

     
     
  #1149  
Old Posted Oct 23, 2015, 2:40 AM
boxbot's Avatar
boxbot boxbot is offline
Registered User
 
Join Date: Feb 2014
Location: Delco., Pa.
Posts: 842
Update from Building Philly:







https://www.facebook.com/BuildingPhilly[/QUOTE]

Progress!!
     
     
  #1150  
Old Posted Oct 23, 2015, 12:58 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
They are least slightly below grade now. Good news!
     
     
  #1151  
Old Posted Oct 23, 2015, 6:45 PM
kraggman's Avatar
kraggman kraggman is offline
Always Lookin' Up
 
Join Date: Jan 2007
Location: Right Coast
Posts: 477
Let's get this thing rolling already !!
     
     
  #1152  
Old Posted Oct 24, 2015, 5:50 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,464
Update from Brook Lenfest himself

Basement foundations of Morris bldg. Still taking out the Morris building foundation, basement, sub basement.



     
     
  #1153  
Old Posted Oct 24, 2015, 7:17 PM
pay homage pay homage is offline
Registered User
 
Join Date: Oct 2015
Posts: 13
Impressive... Monumental excavation! Was the process similar for the Residences at the Ritz?
     
     
  #1154  
Old Posted Oct 25, 2015, 10:30 AM
Philly-Drew's Avatar
Philly-Drew Philly-Drew is offline
Φιλαδέλφεια
 
Join Date: Feb 2005
Location: NoLibs
Posts: 1,395
Wow! Talk about a closeup picture! Damn!
__________________
"Imagine all the people, living life in peace." :Lennon
     
     
  #1155  
Old Posted Oct 25, 2015, 12:21 PM
blenfest blenfest is offline
Registered User
 
Join Date: Oct 2013
Posts: 23
Quote:
Originally Posted by pay homage View Post
Impressive... Monumental excavation! Was the process similar for the Residences at the Ritz?
No. They built on top of the garage that was intact from the Meridian building.
     
     
  #1156  
Old Posted Oct 26, 2015, 12:17 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
This is crazy. I wonder how much of this was known in advance based on existing drawings of the old building. Only other project with this much underground work is 1601 Vine. And maybe East Market.
     
     
  #1157  
Old Posted Oct 26, 2015, 1:03 PM
blenfest blenfest is offline
Registered User
 
Join Date: Oct 2013
Posts: 23
Quote:
Originally Posted by 1487 View Post
This is crazy. I wonder how much of this was known in advance based on existing drawings of the old building. Only other project with this much underground work is 1601 Vine. And maybe East Market.
When the Morris building was demolished the contract called for the interior basement walls, basement floor, and sub floor, and maybe more to be demolished like the Western wall and nothing larger than 4" X 4" to be used as fill. We are just finding out that they didn't do what they were contracted to do.

The rest of the site West of the Morris building isn't much better which was also not expected. Steel plate, railroad tracks, vaults, I beams encased in concrete.
     
     
  #1158  
Old Posted Oct 26, 2015, 1:42 PM
Boku Boku is offline
Registered User
 
Join Date: Jul 2014
Posts: 770
Quote:
Originally Posted by blenfest View Post
When the Morris building was demolished the contract called for the interior basement walls, basement floor, and sub floor, and maybe more to be demolished like the Western wall and nothing larger than 4" X 4" to be used as fill. We are just finding out that they didn't do what they were contracted to do.

The rest of the site West of the Morris building isn't much better which was also not expected. Steel plate, railroad tracks, vaults, I beams encased in concrete.
Thanks for the updates. Will all of this unforeseen work/costs affect the design or specs of the building at all?
     
     
  #1159  
Old Posted Oct 26, 2015, 1:49 PM
Arch+Eng's Avatar
Arch+Eng Arch+Eng is offline
Arch. Engineer+Developer
 
Join Date: Jun 2015
Location: PHL
Posts: 432
Quote:
Originally Posted by Boku View Post
Thanks for the updates. Will all of this unforeseen work/costs affect the design or specs of the building at all?
The budget has to be BLOWN!

I wouldn't be surprised if we just get one McMansion here and no tower..
     
     
  #1160  
Old Posted Oct 26, 2015, 2:58 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by Arch+Eng View Post
The budget has to be BLOWN!

I wouldn't be surprised if we just get one McMansion here and no tower..
Yes, all of this has to be costing a lot of extra money and affecting the schedule. With this projects the entire scope is usually bid to a CM who is supposed to deliver the entire project within the budgeted amount. I'm not exactly sure how unforeseen conditions like this are handled, but I'm sure there are instances where the contractor can pass on these costs because there was no way to anticipate certain unforeseen conditions.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 7:42 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.