They did a ton of encapsulation work yesterday.

Top looks close to done:

n8LzCUk.jpg
 
Apologies if that has been answered, but does this mean the library itself won't have a traditional below-grade foundation? Or will they still go underground, but around the LRT line?
 
A tunnel has been born. Wow they must have had this prepared well, as the whole top of the enclosure was completed within two days.
 
Apologies if that has been answered, but does this mean the library itself won't have a traditional below-grade foundation? Or will they still go underground, but around the LRT line?

My understanding of it is there will be a limited mechanical basement, but nothing public. Pretty similar to how most of the recent institutional projects around the city (especially at UofC such as ICT, EEEL, TFDL, SSE) have been done.
 
My understanding of it is there will be a limited mechanical basement, but nothing public. Pretty similar to how most of the recent institutional projects around the city (especially at UofC such as ICT, EEEL, TFDL, SSE) have been done.

So not much excavation is to be expected then? That's good, this project will rise quicker than way :D
 
Another view courtesy of the Central Library construction camera:

qPfm0Kl.jpg

Great picture. This one, especially with the workers standing on the tunnel really gives perspective to the site. In my head I have always thought that it was much smaller. It's a pretty decent size!:tup:
 