Midwest Highrise Construction


^ for the purposes of this thread, let's say a "highrise" is anything 10 floors or higher.

13146737475_977808d841_b.jpg

nextstl.com

it's over 10 stories, but it's hospital expansion, but apparently it's still in demolition phase. i believe the cranes are for a 6 story medical research building, and a 6 story mixed use whole foods/apartment project, so no dice.
 
^ for the purposes of this thread, let's say a "highrise" is anything 10 floors or higher.

In that case, there are two additional 11-story buildings going up in Minneapolis:

- The Bridges (130' -10" from plans) will wrap up this summer
- WaHu will finish next year

In suburban Eden Prairie:

- Optum Health Tower - 15 floors, almost topped out, should finish next year

In Bloomington:

- JW Marriott Hotel at the Mall of America - 14 floors, just started a few weeks ago

In Edina:

- One Southdale Place - 10 floors (123'-7" from plans), topped out, should finish late this year
 
And 5 currently under construction in Madison:

Edgewater Hotel & Residences - 14 floors - 2014/15

Ovation 309 - 14 floors - 2015

The Hub - 13 floors - 2015

City View - 12 floors - 2014

Domain - 12 floors - 2015
 
Here is Iowa's contribution to buildings 10 stories or taller under construction or proposed:

Des Moines

Iowa Events Center Convention Hotel
17 floor, 450 room hotel
Proposed
Construction to start in 2016/2017

154783961.jpg


154783957.jpg



Cedar Rapids

CRST Headquarters
11 floor, office building
Proposed
Construction to start in 2014
crst1_zps689e1aaf.jpg




Iowa City

The Chauncey
20 floor condo, hotel, theater and bowling alley
Proposed
Construction to start in 2015
the_chauncey_420.jpg


Park@201
14 floor condo, office and retail building
Under Construction
To be completed in 2014
bildefc.jpg


002_zps8f8ea788.jpg


University of Iowa Children's Hospital
11 floor medical buildings, to be built in 3 phases
Under Construction
Phase I to be completed in 2015
buildingElevatedView.jpg


childrensHospitalBuidling.jpg


West Campus Residence Hall
10 floor dormitory
Under Construction
To be completed in 2014
grand-ave-eye-level-view-640.jpg


bu9e5u5u.jpg
 
Last edited:
And again in downtown Minneapolis, the 30-story 4Marq apartment building at 400 Marquette Avenue has started foundation work as of July.
 
Today's webcam showing the construction of the 30-story 4Marq apartments on the left, the 9-story Xcel Energy HQ expansion on the right, and the nearly-completed 27-story Nic Apartments in the back on the same block. (Penthouses of the Nic rent for a cool $9,000 per month):

 
Foggy night shot of the twin 20-story Wells Fargo buildings on the left and the new Viking's Stadium in the background.

Fog by relux., on Flickr
 
35-story apartment/condo tower proposed at the north end of the 3rd Avenue bridge across the river from downtown Minneapolis:

 
MORE New Caterpillar Headquarters Campus Renderings

Project is dead..... Caterpillar headquarters moving to Chicagoland.
 
Last edited:


Back
Top