HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Business, Politics & the Economy


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 10, 2015, 1:46 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
When Blair Station was built in the early 1990s, it's likely the Gloucester Centre management refused a direct connection. I don't know the story, though.

Direct connections between the Transitway and neighbouring buildings is quite rare. Train Station has an outdoor connection (albeit covered)--both currently and with the future LRT. Even the Desmarais building at U of O, despite being literally at Laurier Station, only has an entrance around the corner from the bus stop.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Business, Politics & the Economy
Forum Jump



Forum Jump


All times are GMT. The time now is 11:32 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.