I sent out an e-mail asking about the overhead walkway connecting to nothing and the missing path above the bus loop. It's been sent on - I don't expect to hear an answer until after the weekend.
The new station houses have single up / down escalators from the ground to the platform - there is no middle landing to join an overhead walkway to. People hated leaving the current walkway in place and having to walk down stairs and then over to the new entrance.
I finally got one of my questions answered: Re the elevators "Two will stop at mid-level to access the new central passerelle. The third will be express between platform and grade level."
I hope that they only remove half of the existing passarelle, and leave the portion between Metropolis and the stairs to the sidewalk.
Thanks.
So I guess two elevators run only between the mid-level mezzanine and the platform (behind a bank of faregates on the mezzanine),
and the third runs only between grade and the platform with its own ticket machine and faregate at grade.
Here are the latest renderings of Metrotown Station. I can't find the link online anymore, but they're from Translink at the December 2014 open house.
![]()
I assume all three would do the full run, with two out of the three also stopping at mid-level. I sent a follow up e-mail so hopefully I'll hear more soon.
I see, if the other 2 go to grade they could also be behind faregates at grade (and behind faregates on the mezzanine), but for someone boarding at grade, there's really no purpose to stop at the mezzanine, other than to pick up more passengers?
Here are the latest renderings of Metrotown Station. I can't find the link online anymore, but they're from Translink at the December 2014 open house.
![]()
Not gonna happen.
I assume all three would do the full run, with two out of the three also stopping at mid-level. I sent a follow up e-mail so hopefully I'll hear more soon.
Those specked square and rectangle on the roof sure look like the top of the elevator shafts.
As you note the side connecting into the existing East Stationhouse, does have to be demolished, and would happen in spring 2016. While the East Stationhouse is closed passengers will be re-directed to the new Centre Stationhouse or West Stationhouse once it is complete in summer 2016. The contractor will rebuild the existing East Stationhouse, extend the platform level at the east end to provide for the new escalators, and install the four new escalators and the new Bike Parkade.
I received a reply from Translink, where they said that Ivanhoe Cambridge plans to remove the entire old passarelle. They also say that there will be 4 escalators in the new east station house:
I mentioned that last monthfrom the open house.
I think, ultimately that they may relocate an entrance to the mall, seeing as how the door arrangement is actually causing the single door closest to the existing Passerelle to be used almost as the exclusive entrance, and all the rest of the doors beside it get ignored.
I know lol. There are such traffic jams at the 2 nearest doors. Also I have long thought these should all be automatic sliding doors just for accessibility's sake. But maybe now if the Zara cut-through happens there will no longer be a need.
In any case they'd better make the new passerelle much wider and the area where it diverges to the 2 malls very obvious to navigate (i.e. with lines and symbols separating station bound traffic from mall bound traffic).
It will be a "gong show" next summer with onyly 3 elevators servicing the entire station, as the East and West station will be closed!
It will be a "gong show" next summer with onyly 3 elevators servicing the entire station, as the East and West station will be closed!
Technically they've started work at New West station. The escalator from the bus loop up to the ticket / mall area is being taken apart now (first of four escalators to be replaced). Other than that nothing is happening at the station.