HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 2, 2015, 4:38 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Kitchissippi View Post
I think the question is if there will be interlining in the downtown portion. The answer is yes for the western legs of the Transitway, but there are no plans to convert the Southeast Transitway at all — if there were, they'd be building Hurdman station slightly to the west so outbound trains could turn into the Southeast ROW after they leave the station. The city of Ottawa has ways to make the practical impossible sometimes....
It is too bad that they would not pick another street downtown to tunnel under and run the next line under. Yes, there would be a higher cost, but, when the system becomes very busy they will not have to continue to work with 2 lines meeting.

They could put the second line under Laurier or Wellington.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:00 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.