Bad news, I had a restless night and lots of time to think.
While the planners and councillors pat themselves on the back and the railroaders gleefully think of the train moverments, I think of the complexity of the proposal.
How is this all going to work and is it going to be reliable?
In order to do what they are proposing, we have to set up a complex set of switches and signals. Trains have to routinely switch tracks and wait repeatedly along the line. Yes, this is pretty routine railway procedure, but we also have to tightly follow a schedule. I have said that any sort of delay anywhere will have a cascading affect on schedules. Somebody mentioned that we have more passing tracks, but at the same time, we also have more trains as well. Part of the benefit of trains is more fixed scheduling but if this single track gets out of whack, we have limited options for getting the trains back onto schedule. We already have problems with the existing O-Train and I just get concerned that this could get worse with more passing tracks and more trains on the line. To make this system reliable, transfers have to work and that means that trains have to be on time almost all the time. Just remember the comment that at times people from Riverside South will have to ride on 3 or 4 different transit vehicles to reach downtown. That is something that a resident in Barrie doesn't need to do to reach downtown Toronto.
We have already seen a delay in implementing the new trainsets and this is at least partially related to the complexity of signalling required. What will happen when we try to make this line even more complex with shuttle trains as well as through trains?
Has anybody considered how these trains will operate? Where they have to be to make it work?
In my restlessness, it can only work one way as follows: There will be 8 trains. When 1 is at Bayview, 2 will be at the bypass track at Carleton. This is where it gets difficult. In order to make it work, there will have to be 3 trains at South Keys. One through train going north, one through train going south and one shuttle train going south. The two remaining trains will be at the airport and Bowesville. The only way South Keys can operate with the shuttle model is to have the two southbound trains back to back on the passing siding. This will allow the southbound trains to leave in tandem. But it seemed to me that the South Keys station platform was not going to be extended long enough to allow for two trains back to back, or are we going to make this even more complicated by making the southbound through train wait until the shuttle leaves? But that doesn't make sense if we want to facilitate transfers onto the shuttle train. So, have the planners screwed up by saying that the South Keys station platform will located only south of the pedestrian walkway. I think so.
Also think about this. The report suggests 8 minute frequency but the planner admitted that this might extend to 10 minute frequency. Is that even doable? Our new service model starting in February runs 4 trains between Greenboro and Bayview. As mentioned previously, we will be adding stations and additional stops at Walkley and Gladstone as part of the new proposal and each stop adds travel time. But we are also effectively adding another station. Under the new proposal, 4 trains will be running between South Keys and Bayview instead of Greenboro and Bayview adding another stop and more distance. Inevitably, this will take even more time than what will happen starting next month. So what will be the real possible frequency? It seems to me that we are drifting back towards the same service frequency that we have today. Are we really creating that much extra capacity to allow for growth in the future? This is of course the limitations of using a single track line.