Metro Vancouver Transit Discussion


Status
Not open for further replies.
Tim Hortons does...

I thought we were talking about Telus Wifi on buses.

Isn't Tim Hortons Shaw wifi?

As far as buses go, I obviously don't want Translink to waste their money on providing wi-fi and havving it available for Telus customers is better than nothing, I just wish it was accessible to all. But I realise how impractical that is.
 
Not sure if you guys read up on sources but this wi-fi is available to all.

Well that's embarassing :P People just started talking about Telus trying to compete with Shaw in terms of wi-fi which I misinterpreted greatly it looks like. I'll be sure to actually read the articles next time hahah
 
Not bad, the new design looks much better than the current one. Also it seems like the new design will allow articulated buses into the loop. I remember when I rode a D60LF on the 130 last month, more than half the bus was sticking out from the bay and blocking the path of another bus. Maybe with this we could see articulated buses on the 239 ?

I guess I could add this too since I was talking about D60LF's and Phibbs Exch, second clip shows B8072 departing Phibbs Exch.

• Video Link

Can an articulated bus handle the incline on the Lonsdale and 3rd corner? At least it's two lanes for about 50 feet now.

Could also be a problem at the Quay.
 
Can an articulated bus handle the incline on the Lonsdale and 3rd corner? At least it's two lanes for about 50 feet now.

Could also be a problem at the Quay.

It doesn't look that bad, articulated buses are much more better turning than a 40ft bus. Instead of one section turning you got 2 smaller sections making that turn. But that turn does look a bit to tight for a artic, but I think it could make the turn though.

Also I read somewhere that Translink did do some articulated bus testing at the Quay in 2008 or 2009 ( not sure, forgot the dates ). I think the Quay could handle artics, just move the overload bays to bay 6, bay 9 and 10 to bay 7, and then you can have the 2 end bays for the artics ?
 
Good read by Kenneth Chan over at VanCity Buzz:
It is a good read. But I want to point out that some of the quoted figures are misleading. The article says that the current capacity is 6,100 people per hour per direction (pphpd) and that the actual measured usage is 5,500 pphpd. The conclusion is that the line is not yet at capacity. But this ignores the "partitioning problem" caused by the fork at Bridgeport.

If exactly 50% of the people going/coming from beyond Bridgeport were taking the airport leg and the others were taking the Richmond leg, then these numbers would be fair, because every other train uses either leg. But an exact split of ridership is very unlikely, particularly during rush hour when most riders would be commuters traveling to or from their homes.

As a result, Richmond-bound trains can be full and leave people behind on the platform while YVR-bound trains are less than full. If the 5,500 pphpd comes from the average of all trains, then it's fallacious to assume that there's extra capacity for passengers using the Richmond leg.

This can be tweaked by adjusting the ratio of YVR vs. Richmond trains, but that would probably require some negotiation between the parties involved.
 
If they had 30 trainsets & ran 25 during peak periods that would create a big jump in capacity.


Can the run on 90second headways?
 
If they had 30 trainsets & ran 25 during peak periods that would create a big jump in capacity.


Can the run on 90second headways?

Judging by a document that was posted on here the next headway increase will be to 2 minute headways, which will raise capacity from 6,100 pphpd to 10,100 pphpd. However, I still can't answer your question :P
 
Given the single tracking to Richmond-Brighouse, probably not.
Bear in mind that only every second train goes down that single-track segment, so you're really looking at a 3-minute turnaround time. They also have the option of short-turning every other train that goes down that leg, so that ultimately it's only every 4th train at 6-minute intervals that has to go all the way down the single track segment.
 
]Fall Service Changes

according to the new schedule Tje #7 Nanaimo stn. \Dunbar has its PM frequencies cut from every 11min to every 15min. a somewhats significant cut
 
Status
Not open for further replies.


Back
Top