Thanks. Park and Ride is a nice touch.
Seems like that will lock them into the current interchange design though? Aren't they about to upgrade it?
It says the park and ride will be a part of a latter project.
Thanks. Park and Ride is a nice touch.
Seems like that will lock them into the current interchange design though? Aren't they about to upgrade it?
So you want them to give away the service for free?Takes away the whole point of widespread public wifi if not everyone can use it.
So you want them to give away the service for free?
Lots of places do it. If Starbucks can provide free wi-fi, there's no reason Tim Horton's shouldn't either.
Tim Hortons does...
I thought we were talking about Telus Wifi on buses.
Not sure if you guys read up on sources but this wi-fi is available to all.
Not bad, the new design looks much better than the current one. Also it seems like the new design will allow articulated buses into the loop. I remember when I rode a D60LF on the 130 last month, more than half the bus was sticking out from the bay and blocking the path of another bus. Maybe with this we could see articulated buses on the 239 ?
I guess I could add this too since I was talking about D60LF's and Phibbs Exch, second clip shows B8072 departing Phibbs Exch.
• Video Link
Can an articulated bus handle the incline on the Lonsdale and 3rd corner? At least it's two lanes for about 50 feet now.
Could also be a problem at the Quay.
It is a good read. But I want to point out that some of the quoted figures are misleading. The article says that the current capacity is 6,100 people per hour per direction (pphpd) and that the actual measured usage is 5,500 pphpd. The conclusion is that the line is not yet at capacity. But this ignores the "partitioning problem" caused by the fork at Bridgeport.Good read by Kenneth Chan over at VanCity Buzz:
If they had 30 trainsets & ran 25 during peak periods that would create a big jump in capacity.
Can the run on 90second headways?
Can the run on 90second headways?
Bear in mind that only every second train goes down that single-track segment, so you're really looking at a 3-minute turnaround time. They also have the option of short-turning every other train that goes down that leg, so that ultimately it's only every 4th train at 6-minute intervals that has to go all the way down the single track segment.Given the single tracking to Richmond-Brighouse, probably not.
When will the next headway increase take place to 2 minutes?