The new roof is fine, no issues whatsoever with it. It shelters people from the rain, then it has more than served its purpose. Complaints are unjustified and absolutely no needed.
WRT video, I see what dpogue meant about the wooden forms being taken out. I guess its not super visible since its way up there, but they are looking good. I can't wait for the rest to be taken down. I'm guessing they should be by the time the gantry reaches Gatineau Place, which should be third week or end of July.
I also strongly suspect once the forms are taken out of the Lougheed steel guideways, all concerns about it being ugly due to it not being basketweave will go away.![]()
I don't think there was too many complaints abut the missing basketweave, but in my case, the 'ramp to nowhere' inbound track that was done during the original construction of the station (a remnant of the elevation change needed for the former basketweave) should have been removed and rebuilt at the same elevation as the 'outbound' track.
That would have allowed for a new crossover to be installed to let trains arriving from PoCo to use either the shuttle platform (the unfinshed 3rd platform) or the Vancouver-bound main platform.
That would also eliminate the need for 'wrong railing' between Lougheed and Burquitlam, and the need for every train arriving or departing Burquitlam to cross in front of another train.
I suspect the costs involved in the extra engineering needed to have each track on different curving elevations between Lougheed and North Road was more than having the new tracks properly engineered to be at the same elevation through the curve. Certainly a single beam holding two tracks (a la North Road) is cheaper than two beams with each holding a single track - even when using steel beam construction supporting a concrete trackbed.