I can confirm that it's designed to 80km/hr and not just for the intersections. Everything is built for 80km/hr - sight lines, shoulders, vertical and horizontal curves, acceleration lanes etc.
Very obvious. The sight lines, vertical and horizontal curves (tight curves and lack of super-elevation) are VERY obvious along the SFPR vis-a-vis Hwys 1, 91, and 99, which are freeway standard and have a design speed of 100 km/hr+.
The SFPR (40 km) is essentially a twin of the STS north of Horseshoe Bay in terms of the exact same RAD or "arterial standard" functional design with an 80 km/hr design speed. Basically a twin and the drive is quite obvious.
IMHO, BC MoTI should move away from both the RAD functional design (Cariboo Connector as an example) and any more 80 km hr design speeds (SKS and SFPR being the only two).
Driver expectation for long distance travel is for a 100 km/hr posted speed in the minimum. Simple as that.
OTOH, the Kicking Horse Canyon section of Hwy 1 will see ~$1 billion expended for just 25 km with really no property acquisition. (SFPR was also $1 billion for 40 km with ~$300 million in property acquisition). More importantly, the KHC section of Hwy 1 is designed as RED or "expressway standard" with a 100 km/hr design speed irrespective of the mountainous terrain.
IMHO, that's how all divided highways in BC should be designed, upgradable to freeway standard when warranted, along with a 30 m depressed grass median where terrain also warrants.