Shop owners say transit-only lane hurting their downtown businesses
(Hamilton Spectator, Steve Arnold, Nov 3 2013)
Two weeks after the opening of a new bus-only lane through Hamilton's core, downtown merchants say their worst fears have been realized.
Business operators have expressed a fear throughout the transit experiment that making it tougher for cars to navigate the core will keep people out of their stores — and that's what they fear is starting to happen.
Barry Sobel, whose Rainbow Bridal has been a King Street fixture for 36 years, said he is already hearing from longtime customers that traffic congestion resulting from the bus lane is keeping them out of the core, especially on weekdays.
"Saturday isn't so bad, traffic is moving well, but at 11 a.m. on a weekday cars will be backed up all the way to Wellington," Sobel said in an interview Saturday. "During weekdays, traffic is backed up as far as I can see."
Late in October the city launched a one-year pilot project to test the effect on traffic congestion in the core from converting one lane of King to transit-only. The far right lane of King between Mary and Dundurn streets is now buses-only except for cars trying to turn right.
The experiment is being viewed as a test of the impact of a proposed light rapid transit rail line through the area. Provincial transit agency Metrolinx has put $300,000 into the project.
Backers of the plan say it has the potential to increase business for core-area merchants by slowing traffic, giving drivers a chance to look around and maybe discover a downtown shop they didn't know existed.
"It gives people a chance to see that dress in the window or that guitar in the pawnshop," said downtown Councillor Jason Farr. "This plan was well thought out but it's also a pilot project and we know that means it will have to be tweaked a little."
how much is the LRT going to cost? Because it will require 18 years to fully implement the big move, and 18 years at 55 million annually is around 950 million. Once you include all day GO that will be in the plan for the new GO station, you are probably getting your monies worth.
Well maybe long term Hamilton will benefit more, Toronto's just more desperate right now.
Toronto will always be more desperate.
Even if everyone comes to some agreement about how to fund the Big Move, it will be interesting to see how future politicking plays with the plans.
That's the thing I'm afraid of. Toronto will always have some project that has to be done.
Hamilton won't lose out on the deal. If anything, toronto Is the one loosing out big time. $8.5 billion of the plan is going to be spent in toronto but probably 11-12 billion will be collected in the city.
Hamilton is going to get roughly 1 billion of the funds, which very closely reflects what it will be paying. (For the LRT and actual all day GO in Hamilton, 15 minute electrified service as a full extension of the lakeshore west line)
Remember that Hamilton also falls under Metrolinx's wing and therefor is seen as the same "place" as toronto anyway. It's included in the big move, and like it or not it is treated as part of the GTA. I wouldn't call it a toronto suburb per-say, but it's commuting patterns certainly indicate it isn't its own isolated city like Timmins. The discussion is that municipalities outside of the big move can get the funds as well to help their projects, which would allow places like Ottawa expand their LRT system or allow London to build an LRT.
It's just starting out. Toronto has an extreme transit deficit. Hamilton needs a bit of help, but it's more of a restructuring than desparation.
That's not a bad way to characterize it. Meeting existing demand with an eye to setting things up better for future growth.