Depending on how much power they carry, it's not a cheap job to bury those lines. I am assuming they may feed the Salt Palace, from the substation that is on the hotel block. While they aren't transmission lines like those on 13th S and 8th S, they are probably very high capacity distribution lines and the expense of that may be simply to much for the developer to absorb right now.
If those are the lines that feed the Salt Palace, if the RWP location is chosen for the CCH and more convention space, these lines will need to be upgraded with more capacity to serve the needs of the CCH and more convention space. I would assume that part of the construction costs that the TIF will allow for will include upgrading the lines and burying them. Maybe at that time the hotel owners will pitch in part of the cost to bury them along their frontage.
If RWP is one of the sites under consideration it wouldn't surprise me if Rocky Mountain power and the hotel developers decided, why shoulder the cost to bury these lines now because they may need an upgrade in the future, no need to pay for it now if someone else might be paying for the majority of it at a later date.
If those are the lines that feed the Salt Palace, if the RWP location is chosen for the CCH and more convention space, these lines will need to be upgraded with more capacity to serve the needs of the CCH and more convention space. I would assume that part of the construction costs that the TIF will allow for will include upgrading the lines and burying them. Maybe at that time the hotel owners will pitch in part of the cost to bury them along their frontage.
If RWP is one of the sites under consideration it wouldn't surprise me if Rocky Mountain power and the hotel developers decided, why shoulder the cost to bury these lines now because they may need an upgrade in the future, no need to pay for it now if someone else might be paying for the majority of it at a later date.