I would disagree. Calgary has a very, very, very concentrated core, very similar to New York in Midtown/Financial District. If we had a more disperse core and passengers were headed to various locations, transferring to a tram system would make sense. However, our downtown office core is a small area, and served pretty easily by a line going right through it.
The lessons to be learned from this - dumping passengers from large trains onto small ones is a bad idea, and more importantly - do things right the first time as it will be far more expensive to fix in the future.
Which is why I would support skipping a bus way and building LRT straight away, even if it takes longer. That said, IMO, grade separation of the existing lines should take priority however. Being in a train and waiting at lights for cars is just embarrassing.
Yes, I ride one everyday to work or university.
I believe you fail to understand the basic concept called economies of scale that if Calgary continued with its current Southwest Airlines like model we would see greater efficiencies because of increased purchasing power in terms of spare parts, LRT Fleet expansion orders by keeping one style of LRT. We would also see greater employee flexibility that operators, mechanics etc would not need to learn multiple systems and employees could be easily transferred to wherever the demand was. Also with your Low Floor LRT market increasing much faster than the High Floor LRT market would mean that Low Floor LRT would be more expensive than High Floor LRT based on simple supply/demand that manufacturers would be more inclined to discount High Floor LRTs inorder to keep the factory running compared to Low Floor LRTs where the orders have been accounted for years of production. Also we could receive the High Floor LRT in a more stately fashion.
Isn't it a case of transferring a large amount of passengers into smaller groups heading in different directions? While there is a fair amount of passengers trying to cross London, which is is currently difficult due to capacity issues, you'd imagine the bulk of the passengers are trying to get to destinations across Central London, which is better served by a feeder network of Underground and Tube lines. If this is the case, the mistake made in London was not providing enough crosstown capacity.
I can't really speak to the airline side of it, but when it comes to LRVs, I would wager that many of the components on a Siemens low floor LRV are the exact same on a high floor LRV - the systems are all basically the same, just in a different package. I don't think that operators and mechanics would really need to learn all new systems, as something like the S70 low-floor is probably near identical in every way to the new S200 high-floor, just lower.I believe you fail to understand the basic concept called economies of scale that if Calgary continued with its current Southwest Airlines like model we would see greater efficiencies because of increased purchasing power in terms of spare parts, LRT Fleet expansion orders by keeping one style of LRT. We would also see greater employee flexibility that operators, mechanics etc would not need to learn multiple systems and employees could be easily transferred to wherever the demand was. Also with your Low Floor LRT market increasing much faster than the High Floor LRT market would mean that Low Floor LRT would be more expensive than High Floor LRT based on simple supply/demand that manufacturers would be more inclined to discount High Floor LRTs inorder to keep the factory running compared to Low Floor LRTs where the orders have been accounted for years of production. Also we could receive the High Floor LRT in a more stately fashion.
I totally agree. Welcome to the forum Milo!
I wonder what the cost would be to fully separate the 201 line? Probably not that much when considering just the areas outside of downtown. In conjunction with the 8th Avenue subway($800 million) which we need anyways, the entire project would probably end up around $1 billion. It seems like a lot, but to achieve metro capacity and metro headways on our busiest and longest line(s), it's a pretty reasonable price, in my opinion.
I can't really speak to the airline side of it, but when it comes to LRVs, I would wager that many of the components on a Siemens low floor LRV are the exact same on a high floor LRV - the systems are all basically the same, just in a different package. I don't think that operators and mechanics would really need to learn all new systems, as something like the S70 low-floor is probably near identical in every way to the new S200 high-floor, just lower.
We just have high-floor now, and the differences between systems are probably more dramatic now than they would be if we went from current high-floor technology to current low-floor technology. Not a lot of parts and systems shared between U2s and SD160s.
In regards to what model we should get, what about the airport link that will likely be shared by both the NC and NE lines? That fact alone should be a major part in the decision making process, I see the benefits of the low floor design. However, for the sake of fluidity, I vote status quo.
The Canada Line goes down Cambie.
Not entirely sure as I have only visited London versus living there but I imagine travelling by train from say Cambridge to Brighton is a real pain.
Yeah, the negative wouldn't be incompatible trains, we have that already and it will only continue as technology changes, but incompatible systems. With a single system we can share reserve cars with every line, adjust for unforeseen capacity crunches on any line, and order only one model at a time. Each of those have their own benefits and further combine to promote bulk orders. An RFP for 200+ cars that will meet our specs draws interest, and bids, from every car maker on the planet. More frequent and much smaller orders for high floor, low floor, and whatever the fad is when it comes time for an International Ave line will damn us to always pay more for off the shelf designs that don't match out unique needs.
Personally I feel that the airport link will be, and should be, some other technology that terminates at the CTrain station but is not the CTrain itself. The NE LRT functional plan explores and I believe even recommends that option. Plus it could then be owned (and paid for) by CAA rather than CT