Tramway? Wouldn't extending the O-Train achieve similar goals?
Having a rail link (tram or otherwise) across the Chaudière seems like an important consideration. This could be Ottawa's only shot at a proper waterfront development and this kind of high profile area should get premium transit service. Furthermore, with Windmill at the helm, it seems fitting to have electric rail serving the area as opposed to more buses. And of course, this could be part of the solution to eliminate all STO buses from Downtown Ottawa.
It's the proposal here in Gatineau: at-grade LRT to the west of the city using the Nouveau-Tramway of several French cities (Montpellier, Le Mans, Paris, Lyon, etc.). There's no proper term for the kinda hybrid nature of these systems (LRT vehicles and ROW, but streetcar modest stations, at-grade operation and low cost), so the term "Tramway" is used as opposed to "Streetcar".
![]()
Well, actually, I was thinking of something more along these crudely drawn-up lines:
![]()
The biggest (and most developable) part of the Chaudière lands is the land just south of Laurier on the island of Hull, currently occupied by Domtar, if I'm not mistaken. LRT turning down Chaudière wouldn't serve much of Hull (which, according to the O-D Survey, is the destination for about as many trips as Ottawa for Aylmer and the Plateau).
Perhaps the route could be used by a circulator-style streetcar or bus as proposed by the NCC a while back as a way of connecting the destinations around the core (Parliament, Sparks St, the Market, Museum of Civ and eventually Montcalm and Chaudière.)
And the obsession with "eliminating" STO buses is getting unhealthy, IMO. I think a Bank Street Subway to Hull would go a long way to addressing traffic, but until that happens, we'll have to cope.
Fun with electrons. And other things. The lack of a physical barrier between the rail vehicles and the rest of the universe looks terrifying. Is this normal!?
First off, I wouldn't call my wanting to eliminate STO buses from downtown streets "unhealthily" or an "obsession". I don't think about it day and night, I only bring up the subject when we talk about interprovincial transit. Eliminating buses from downtown streets (or the vast majority) needs to be done eventually, just as they eliminated streetcars from city streets in 59'.
That said, crossing the Bank Subway across to Hull would be extremely expensive (tunneling under the River), not to mention security concerns of a tunnel running under the Parliamentary Precinct (which includes everything north of Wellington between the Portage and the Canal). Bank Street subway should turn east under Rideau to Vanier.
Sorry, it was a little harsh. I just don't like the idea that someone is less 'worthy' of being on a street because he or she's on a bus, in a car, on a bike or on foot. Though the idea that the streetcars had to be eliminated is debatable since I don't see how the buses are a significant improvement.
Expensive, yes, but it doesn't pass under anything of particular importance. I don't know how much of an issue that is.
I wish I could see some topographic maps of the Ottawa River around Downtown: I believe the Hill is on an escarpment, but I think the red of the river is relatively shallow, judging from the little, flat islands in the middle of the river.
But alas, even if it were easy, it won't be done in the next decade, if ever. Though I do believe it would be a total game-changer since the downtown cores would suddenly be closely linked in a way which they are most definitely aren't at the moment. Plus, there aren't many obvious options for a transit link between Ottawa and Hull (Portage Bridge? Alexandra? Gondolas? Slingshots?)
According to the Windmill Development Website July 15th press release, they indicated that "Until the sale of the land has been confirmed, Windmill will not be granting interviews to media". Does anyone know what the status of this project as of now?
With the city of Gatineau pondering rapid transit options for Aylmer, this would be an excellent time to consider integration of a tramway line into the new development, either just as the downtown Hull spur line to service Place du portages, with Ottawa bound line on the Prince of Wales bridge, or put the Ottawa bound line on the Eddy Bridge and soon to be newly constructed Booth street over the Confederation line. Then bring the line up Albert/Slater or Wellington as part of a downtown Ottawa/Gatineau loop.
The challenge I see with the tramway plan (www.planaylmer.wordpress.com) that fellow skyscraper Aylmer posted in another thread is combining trams and buses on promenade du portage, with a couple of tight turns at l'hôtel du ville and Laurier. A dedicated tramway line servicing the new development beside Laurier would resolve that, plus provide access to the museum of civilisation and proposed Destination Gatineau plans (which I'm not too crazy about in their current form).
A tramway will never see the day light in the Aylmer part of Gatineau. This is only a lot of hot air as Aylmer does not have the population to support.This idea comes from ACTION GATINEAU which is an unwanted political party at the municipal level which is now trying to take out the existing mayor.
Tells us how you really feel!![]()
Eliminating buses from downtown streets (or the vast majority) needs to be done eventually
That said, crossing the Bank Subway across to Hull would be extremely expensive (tunneling under the River), not to mention security concerns of a tunnel running under the Parliamentary Precinct