Ummm, speaking of stuff facing a setback to being built...
Ummm, speaking of stuff facing a setback to being built...
Tishman Speyer Properties LP’s approximately 650 luxury units in two towers south of the financial district, and the first phase of Lennar Corp. (LEN)’s Hunters Point project at a former naval shipyard with 480 studios and townhomes, are both scheduled to break ground today, according to the companies.
As part of the groundbreaking ceremony, the name for the Bernardo Fort-Brescia designed development will be announced.
There are two ceremonial groundbreakings scheduled today for large projects:
At its ceremony, 201 Folsom will get a name:
Surprised nobody has commented on the Socketsite link I posted a few things up where the Bay Commission appears to have shut down the Warriors arena proposal. I'm not sure what to make of it, but lots of comments on Socketsite.
http://www.socketsite.com/archives/...o_oppose_warriors_arena_bill_wi.html#comments
ummm, speaking of stuff facing a setback to being built...

A new pic of the ongoing work building tunnels for Caltrain and CAHSR at the Transbay site:
The tunnels for rail and high-speed rail are new. The old terminal was for the old key street car service and turned into a glorified bus barn and homeless hotel.Out of curiosity, what was the former infrastructure configuration/setup in this area? Or, is this all-new, an expansion?
Also important to note that all they're building right now as far as rail goes is the train box under the bus terminal. Caltrain (also the track alignment that would be used by high-speed rail) would have to be extended underground by 1.3 miles from its current terminus to get to the Transbay Terminal.
The project isn't funded and is reliant upon several other pieces falling into place. So for now the construction of the train box is simply to make it ready for the future. Originally the train extension was scheduled for completion in 2019, but it's been delayed due to the funding issues.
Others have beaten me to the punch here, but I'll add a little context.Out of curiosity, what was the former infrastructure configuration/setup in this area? Or, is this all-new, an expansion?