Evergrey
Eurosceptic
I like how the addition looks from the outside--it is well-integrated with the existing building, and to me gives the hotel a sort of nautical, sailboatish look from several angles.
Agreed. Well worth the wait.
I like how the addition looks from the outside--it is well-integrated with the existing building, and to me gives the hotel a sort of nautical, sailboatish look from several angles.
Agreed. Well worth the wait.
Forget Smithfield Street. Forget the Strip District. Forget the former Civic Arena site. James Scalo says he knows where the next skyscraper will be built Downtown -- right on his land.
For the past three years, Mr. Scalo, president and CEO of Burns & Scalo Real Estate Services, has been marketing the 29,000-square-foot parking lot on Fort Pitt Boulevard near Smithfield Street to potential office users.
So far, he has gotten no takers. But he believes that will change.
"This will be the next high-rise in Pittsburgh," he said boldly Thursday as he surveyed the parking lot. "Nobody's going [elsewhere Downtown] when you can come here. Location. Location. Location."
Mr. Scalo might get an argument from Oxford Development Co., which is marketing a site on Smithfield Street between Fifth and Forbes avenues for a new skyscraper, or the Pittsburgh Penguins, who are preparing to develop the 28-acre former arena property, or the Buncher Co., which has plans for offices and residences on a riverfront parcel in the Strip District.
But Mr. Scalo maintained that his site has greater visibility and better access to highways than the others do. The Scalo property is located a block or two from ramps to the parkways east and west and faces the Monongahela riverfront. A new building would be visible from Mount Washington and the Fort Pitt Bridge.
"It's a perimeter lot with river views. In commercial real estate, sight lines and views really dictate desire and value," he said.
Burns & Scalo bought the parking lot and the adjacent 132,500-square-foot One Smithfield Street building from Allegheny County for $11.4 million in late 2009. The county rents space in the building under a 20-year lease. A separate 20-year lease governs the parking lot, but Burns & Scalo has the ability to terminate that agreement with a year's notice, Mr. Scalo said.
For several years, the company has been marketing the parking lot for a 300,000-square-foot building with lower level parking. Burns & Scalo has the ability to go as high as 18 stories at the location, perhaps higher with a variance, Mr. Scalo said.
Both U.S. Steel and Chevron, he said, have considered the location for a potential headquarters, he said.
U.S. Steel is thinking about leaving its longtime home in U.S. Steel Tower for a new location when its lease expires in 2017. The Post-Gazette reported in September that the corporation is considering the 37-acre parcel in the Strip owned by Buncher and a 116-acre property off McClaren Road in Findlay. At the same time, it has not ruled out staying at its current location on Grant Street.
Mr. Scalo said U.S. Steel has told him that it is looking for more of a horizontal campus-like headquarters than a vertical office tower.
"If they were going to build new Downtown, this would have been it," he said. "Nobody knows what they're doing yet. Who knows? Maybe they'll come back."
The city and the county, Mr. Scalo said, would like to see U.S. Steel move to the Civic Arena site if it doesn't stay in U.S. Steel Tower.
County Executive Rich Fitzgerald said he has talked to the corporation about the arena site as well as the Buncher property in the Strip. "We would love to have a major presence like U.S. Steel be part of [the arena development]. Whether that fits into their overall plans remains to be seen," he said. "It certainly would be a good fit."
What's most important, he added, is that the steelmaker stay Downtown, he said.
U.S. Steel has been tight-lipped about its plans. In a statement Thursday, it said, "We're currently exploring several alternatives in order to arrive at the best long-term business solution for our company."
Mr. Scalo said Chevron also considered his property for a headquarters before settling on a potential location in Moon.
He noted that one of the drawbacks to building Downtown is that a developer has to charge $38 to $40 a square foot in rent to pay for the construction, much higher than a company would have to pay in the suburbs or even for the top class A space in the Golden Triangle.
Burns & Scalo has no plans to build without a tenant in hand. Banks typically won't lend for a high-rise office construction unless the developer has at least 40 to 50 percent of the building pre-leased.
While Mr. Scalo said he is "not actively talking to anyone" about building at the Fort Pitt Boulevard site, but he doesn't think it will be long before that changes.
With natural gas prices rising again, he believes more energy companies will be looking for space in Pittsburgh -- and Downtown, specifically.
"There are a lot of people looking to come here. It will happen," he said. "I would be surprised if in the next five years we don't have anyone."........
I actually found that article pretty depressing, since apparently no progress has been made on finding an anchor tenant.
US Steel is lame. They can go ahead and build their "horizontal campus" out in exurban Weirton for all I care.
Boo! I think a high-rise here, something in the 20-to-30 story range would do well here.Official Vegas Odds:
Civic Arena Site 100/100 (without skyscraper)
My thinking as wellBurns & Scalo 80/20
50/50I'm still pulling for the 33-story option here.
Buncher 25/75 (looking like the RR and the courts will kill it)
One Grandview 5/95
Yeah. I saw the article about that. Does not look good... Here, again, at least in the portion closest to downtown, I think a highrise really makes sense. I'd put a maximum at the other end, however, in the 12-16 story range...
I don't view the article as depressing, though I agree that I wish progress would be made on a tenant, but the fact that a couple groups are actively pursuing new towers is a nice change.
The problem is this project has been on hold since 2009, so in this location at least, that as-yet merely aspirational change has gotten a little stale.
In other words, I, at least, have officially gone from the "Cool, a new project!" stage to the "So is this thing ever going to actually happen?" stage. And when you are in that stage, this sort of article is just salt in the wound.
After six years, it's almost finally complete...
I agree that it's unlikely, but the hotel market is pretty good, so I'll give them 30/70 odds.Official Vegas Odds:
Civic Arena Site 100/100 (without skyscraper)
Yeah - don't expect anything over 15 stories. And (unless USS goes there) it will take 20 years to complete.
Burns & Scalo 80/20
Probably more like 40/60 - B&S is full of BS - they probably didnt even talk to USS because USS needs between 500-900,0000 sf, which cant fit on that site.
Oxford 50/50
I'm think more like 60-40 - they wouldn't be taking this long to decide if they weren't deep into negotiations. I hear they have two potential tenants.
Buncher 25/75 (looking like the RR and the courts will kill it)
I would put this at 70/30 - Buncher is going to develop that land eventually
One Grandview 5/95
One reader mentioned that the swimming pool didn't look very impressive in the video attached to the link about the renovations at the Wyndham, and after watching it myself, I think I have to agree. It seemed to be quite small.
I usually get frustrated by negativity and cynical comments at the bottom of an online article, especially after I was excited to read about the completion of this project. But, I did find it strange that the hotel's swimming pool looked so tiny.
I understand their desire for a more horizontal campus-like setting versus a highrise in terms of the amount of leasable space per floor, but I still don't find them all that attractive from an urban planning perspective.