I do not consider anything posted by Nancy Schepers more than four years ago, before the subprime crisis in the US as being relevant!
What are the numbers for now, 2012? and the projected numbers for the next 10 years?
If we do not know where we are, how can we know where we are going?
Keep on spreading Randall O'Toole's word and the gospel according to the CATO institute. Good man, you're dong a great job sowing the seeds of doubt!
A BRT tunnel will solve absolutely nothing.
The notion that a BRT tunnel would solve anything is based on a gross misinterpretation of what the actual causes of the problems downtown currently are.
The common belief is that it is cross streets with their traffic lights that are causing problems.
This is false. It's a case of seeing a correlation - lots of cross streets and bus jams - and coming to a conclusion on causation without analysis.
The cause of the queues is the fact that average bus dwell times downtown exceed average bus headways. Indeed, the traffic lights actually help rather than hinder matters by forcing a certain level of "discipline" in that they clump buses together in short platoons of 2-4 buses. These buses then arrive at a station together, allowing their combined average headways to be pooled, thus permitting dwell times to exceed the average headway. The fact the system doesn't break down even more than it does can be attributed to platooning and indirectly the role of traffic lights in forcing that platooning.
As it happens, bus queues also form up at Tunney's Pasture westbound in the afternoon. There are no traffic lights to blame there. It is grade separated. There is even a passing lane. And yet it fails. According to people who routinely advocate a bus tunnel like Andy Haydon and John Bonsall, this shouldn't be happening.
Tunney's Pasture fails because lots of passengers board here and they are trying to board buses that are already full, both of which increase dwell times. Every express bus also has to stop to check for passengers, and since the dwell times exceed the headways, arriving buses have no choice but to join the end of the queue. They can't make use of the passing lane since they can't be sure their part of the platform is clear and the drivers also don't want to get into a potentially risky game of leap-frogging and queue-jumping each other; they can only make use of the passing lane when they leave the platform. What is particularly pertinent is that Tunney's Pasture, despite being a relatively high-volume station, still fails at passenger volumes that are a lot lower than what we would get with a reduced number of downtown stations in a tunnel.
Instead of highly visible queues on the surface, we would get much more hidden bus queues underground.
From a passenger perspective, being in a bus tunnel would be like a worse version of St. Laurent Station. Besides the fumes and noise of the ventilation system and buses, it would also get pretty hot. Rail tunnels are not immune to getting hot, either, but buses are far worse since internal combustion engines dump far more heat than electric motors.
If we can't build a rail tunnel, we would be far better off building an exclusive surface light rail line (e.g. down Albert) than building a bus tunnel, since a surface light rail system would not suffer from the queuing problems of a bus tunnel. A surface light rail line would have more capacity than a bus tunnel.
Don't think we have a 2012 update, waterloowarrior has the most recent ones (2010).
But anyway, our point is that the numbers are still relevant today, ridership has gone up. Forget the "projected", just take what the ridership was at the time (08-10) and add a few hundred and you'll get a pretty damn good estimate of the current numbers.
The various studies have falsely claimed that a bus tunnel would not help us. That all depends on how we implement it. The general assumption is that all the buses now on the surface would be moved to tunnel. With this scenario, naturally, we would have capacity issues is a fairly short period of time. But, if congestion is the only problem we are trying to address, a bus tunnel will work by keeping any overflow of buses on the surface. We have effectively created at least double the capacity if we are willing to continue to use Albert and Slater. Surface overflow for rail is not easily possible without expensive additional infrastructure. The flexiblity of buses and a bus tunnel would allow us to continue to route some buses onto Albert and Slater Street. Whether that is desireable or not is a completely different issue.
I think there is no reason why it is not technically possible to properly vent a bus tunnel, and from what I have been reading, venting requirements for a bus or train tunnel are the same. The reason being, that you have to deal with a fire scenario regardless of whether you dealing with trains or buses.
The cost of a bus tunnel may be higher than a rail tunnel because the tunnel has to be bigger but this will be more than offset by the cost of building LRT well beyond the tunnel, ie Transitway conversion that would not be necessary with a bus tunnel.
Regarding issues at Tunney's Pasture, I think the comments address the problem as it stands. This is partly resolved by eliminating express buses particulary in the PM peak period. If buses are running overcrowded and therefore increasing dwell time, the solution for that is also obvious.
I am playing a devil's advocate on this but there is no sense for justifying a position based on information that not entirely true.
The various studies have falsely claimed that a bus tunnel would not help us. That all depends on how we implement it. The general assumption is that all the buses now on the surface would be moved to tunnel. With this scenario, naturally, we would have capacity issues is a fairly short period of time. But, if congestion is the only problem we are trying to address, a bus tunnel will work by keeping any overflow of buses on the surface. We have effectively created at least double the capacity if we are willing to continue to use Albert and Slater. Surface overflow for rail is not easily possible without expensive additional infrastructure. The flexiblity of buses and a bus tunnel would allow us to continue to route some buses onto Albert and Slater Street. Whether that is desireable or not is a completely different issue.
I think there is no reason why it is not technically possible to properly vent a bus tunnel, and from what I have been reading, venting requirements for a bus or train tunnel are the same. The reason being, that you have to deal with a fire scenario regardless of whether you dealing with trains or buses.
The cost of a bus tunnel may be higher than a rail tunnel because the tunnel has to be bigger but this will be more than offset by the cost of building LRT well beyond the tunnel, ie Transitway conversion that would not be necessary with a bus tunnel.
Regarding issues at Tunney's Pasture, I think the comments address the problem as it stands. This is partly resolved by eliminating express buses particulary in the PM peak period. If buses are running overcrowded and therefore increasing dwell time, the solution for that is also obvious.
I am playing a devil's advocate on this but there is no sense for justifying a position based on information that not entirely true.
KHOOL said:Montreal students held up the Metro subway for hours with smoke bombs. Buses would have simply avoided the underground route
Another problem is the express bus system. If we were to build a bus tunnel (again, I am a huge advocate of the lrt tunnel), we would have to change the system to hub and spoke, only running the 90 series in articulated buses on the Transitway, solving the problem of people trying to figure out which bus is theirs and better distributing commuters on all buses.
Montreal students held up the Metro subway for hours with smoke bombs. Buses would have simply avoided the underground route. :shrug:
Why they used buses to get people back home. Same when TO's subway flooded; used buses to get people back home. In the rare occurrence (how many times has it happened in the 46 years of the Montreal Metro? or the 58 years of TO subway?) where something shuts down the lrt, we can still use buses; we will have a lot of spares once the lrt opens.
If something unexpected happens (think train accident, criminal activity, suicides, derailment, Gloucester fault line, earthquake etc), buses would need to be rushed downtown to provide transportation services to the passengers.
If the bus fleet has been reduced in numbers, where will the necessary buses come from and how will that affect all the other transportation lines throughout the city?
A delay or repairs due to an unexpected geological problem or even an act of God would assumedly take more than a few hours as in the Montreal Metro smoke bombs scare or the Toronto Subway flooding. It could take days and weeks. Do we have a Plan B?
Um. We survived through a 7-week bus strike. In the winter. That was an act of the Devil.
Saw this article on the Citizen's Twitter feed not long ago; thought I would share it with everyone here. It basically says the NCC is saying NO to LRT on any portion of the parkway!
http://www.ottawacitizen.com/touch/news/story.html?id=6918948
Saw this article on the Citizen's Twitter feed not long ago; thought I would share it with everyone here. It basically says the NCC is saying NO to LRT on any portion of the parkway!
http://www.ottawacitizen.com/touch/news/story.html?id=6918948
Saw this article on the Citizen's Twitter feed not long ago; thought I would share it with everyone here. It basically says the NCC is saying NO to LRT on any portion of the parkway!
http://www.ottawacitizen.com/touch/news/story.html?id=6918948