Paradox Hotel (1151 W Georgia) | 188m | 67 Fl | Completed


Guys we don't need to rehash the same thing over and over in almost every thread. Move on.

Anyone have any new pics of work being done?
 
On Sunday, April 29, 2012 traffic on W. Georgia, between Thurlow and Bute, will be restricted to 1 lane westbound and 2 lanes eastbound to facilitate the lifting of excavators into a construction site.
Major traffic delays can be expected.

Looks like the digging is set to start in May.
 
When they rezoned for the additional floors and major increase in units they had to increase parking as well, think part of that will be via using some spaces in the Fortis building but perhaps they will still need another level as well.
 
OK, that makes sense

Fingers crossed that this tower, Burrard gateway and the Granville Street Bridge tower all get built before the bubble pops (or at the very least, is deflated)
 
seriously. one has the feeling that vancouver is in for a major correction soonish, though not clear from which quarter (my guess is ndp government's second year). 750k average home price is nuts, that's more than sf, where the economy is 3x the size. hopefully we get all these projects well underway and sold before reality hits your little burg up there.
 
The major correction was in late 2008 aka the last time this project halted. At the risk of being RACIST!!! the housing market won't crash until something goes wrong in asia, which of course will never happen.
 
As long as this thing doesn't turn into Vancouver's version of the 'Waterview Tower.'

Nice, twisty, 30-storey concrete shell (half-built)... blowing in the rain and wind for a while...
Crane sticking out the top, adorned with a torn flag and unlit christmas lights.

The existing concrete shell was there long enough.
 
As long as this thing doesn't turn into Vancouver's version of the 'Waterview Tower.'

Nice, twisty, 30-storey concrete shell (half-built)... blowing in the rain and wind for a while...
Crane sticking out the top, adorned with a torn flag and unlit christmas lights.

The existing concrete shell was there long enough.

I wouldn't be worried about them leaving the building unfinished. They have deep enough pockets and a reputation to protect. I would however, worry about them phasing the project based on market conditions. (ie. either capping it off after the parking, or even after the hotel and vertically phasing).

If the market takes a turn and sales on the res units are abysmal, this could very well happen...
 
I wouldn't be worried about them leaving the building unfinished. They have deep enough pockets and a reputation to protect. I would however, worry about them phasing the project based on market conditions. (ie. either capping it off after the parking, or even after the hotel and vertically phasing).

If the market takes a turn and sales on the res units are abysmal, this could very well happen...

Actually... I would think that would be a very logical thing to do, build the parkade and hotel + a couple of floors for significant sound insulation and then wait for the next boom... selling 290 condos at $1500/sq ft will not be easy.
 
Minor update - They blocked off a lane on Georgia Street today to crane in two big excavators and some other equipment into the pit of lost dreams. Work didn't start, but they had them fired up testing out the equipment.
 
IMG_1533.jpg

Photo credit: me

Two excavators working in there today. How much digging is left to complete?
 
Awesome, thanks for the update, nice to see some real work starting again.

This project is still on shaky ground, but seeing this is better than nothing.
 
From the Journal of Commerce:

Interesting that they still reference "Ritz-Carlton".

May 2, 2012

Ritz-Carlton restarts in Vancouver
RICHARD GILBERT

staff writer

Holborn Group is moving forward with the construction of the Ritz-Carlton luxury condominium and hotel project in downtown Vancouver, after the project was put on hold during the recession in late 2008.

“We have everything in place to start construction this month (April), including all the permits and the plans,” said Holborn Group president Joo Kim Tiah.

“We will be working with PCL as the primary contractor. We have a little more excavation, which will be used for additional parking.”

Site work on the 127-room Ritz-Carlton hotel was underway on West Georgia for about four months, when work was halted in October 2008.

The worldwide recession and the softening of the local housing market forced Holborn Group to develop a new strategy for the new $500 million twisting tower designed by Arthur Erickson.

“Over the last few years, we have had to maintain the site and ensure the hole was secure,” said Tiah.

“We had tilt metres to make sure there was no movement for structural safety. We also did other work to remove water and make sure the hole was properly drained.”

The original plan was to build a 58-storey building, which included 123 luxury condos on the top 38 floors and 127 hotel rooms on the first 20 floors.

The building is designed to give condo owners access to hotel amenities like 24-hour room service, a concierge, housekeeping service and staffing for special entertainment events. The condos were priced from $1.4 million to $13 million.

“The biggest challenge was also the biggest strength of the building, which was to keep the exterior architecture of an iconic and distinct building,” said Tiah.

“The new plan will go down another floor because we have more people living in the building. We have 80,000 square feet more of residential density and the building is only 16 feet higher than the original plan.”

The ceiling heights were lowered on the new plan to help squeeze in eight more floors, but the building’s overall height increased by just five metres.

The cost of the structure was reduced by replacing the 10 inch slabs with eight inch slabs, which is the industry standard.

Holborn’s new strategy is to maintain a luxury design for the building, but also appeal to a lower segment of the housing market.

“We also redesigned the whole interior of the building,” said Tiah.

“To get an efficient design that works, the floor plans were changed on each floor.”

The original building had 30 to 40 different floor plans and the plumbing wasn’t stacked.

The new plan has smaller floor plans and a lower price. They also eliminated columns in the rooms to provide more space and used a shear wall system.

As a result, the number of condos increased from 163 to 290 and hotel rooms increased from 127 to 187.

The commercial density of the project will remain the same.

In February 2009, Holborn Group sent out a letter to presale buyers to inform them their contract had been cancelled and they will get their money back.

Holborn sold about 62 of the 123 condos, but these contracts were cancelled as the vendor needed at least 75 contracts for the project to be feasible.

The developer had the legal right to cancel the contracts.

http://www.journalofcommerce.com/article/id49955/--ritz-carlton-restarts-in-vancouver
 
From the Journal of Commerce:

Interesting that they still reference "Ritz-Carlton".



As a result, the number of condos increased from 163 to 290 and hotel rooms increased from 127 to 187.

...

Holborn sold about 62 of the 123 condos, but these contracts were cancelled as the vendor needed at least 75 contracts for the project to be feasible.

http://www.journalofcommerce.com/article/id49955/--ritz-carlton-restarts-in-vancouver​



So which is it, did the tower originally have 163 condos or 123 condos?

Either way, to increase from 1 hundred-and-something condos to 290 sounds like a radical change in FSR. How did that get through zoning without a major fuss?​
 
The numbers are probably a typo - or a limited release for sales.

They made the units smaller to increase the number of units lower the unit prices.
 
FSR doesn't work that way, you could increase the number of units w/o increasing FSR, in fact you could increase the number of units and reduce FSR if you made the units small enough.
That said they did in fact increase the FSR when they reworked the plans as they managed to squeese in several more floors with only a slight increase in height.
The general consenus seems to be that the hotel will not be a Ritz-Carlton, but we'll know for sure shortly.
 