Chadillaccc
ARTchitecture
Wow the new stations of the Ottawa LRT look amazing!
Check it out here: http://www.ottawalightrail.ca/en/routes-stations
Check it out here: http://www.ottawalightrail.ca/en/routes-stations
The AMT has just crossed the last line for me. I go to De la Concorde to get some Zone 3 train tickets. The only machine able to dispense these is broken. I then go inside and the people at the booth tell me to go to Montmorency. I do exactly that. There, the two machines don't even have the option of train tickets. The counter closes at 8:00 and I showed up half an hour late. The help line is also closed.
I want one fare and one system I am fed up of this bullshit. Practically the same thing happens when you try to use the Metro in Laval. It's a gigantic pain in the ass and I have decided tomorrow will be the last time I take the train.
It's gotten to the point that public transit is almost discouraged. We, as citizens, must denounce this asininity and stop tolerating our poor service. The AMT better do something fast or their numbers will continue to decline. I'm fed up with this government.
Wow the new stations of the Ottawa LRT look amazing!
Check it out here: http://www.ottawalightrail.ca/en/routes-stations
It is retarded. May I suggest that you send them an angry, but respectful letter.
Give them a stern letter expressing disapproval. That always works for the UN!
Read more: http://www.montrealgazette.com/news...rain+shuttle/6563014/story.html#ixzz1trmuPXKIAirport considers elevated train shuttle
By Andy Riga,
Gazette Transportation Reporter
May 3, 2012 10:39 PM
MONTREAL - Montreal’s airport authority is going back to the drawing board on its long-discussed train shuttle between Trudeau Airport and downtown.
Its latest proposal: an elevated light-rapid transit system running along Highway 20 and the Ville Marie Expressway, perhaps arriving downtown in a new dedicated station, Aéroports de Montréal chief executive James Cherry said Thursday.
But the project is at a very preliminary stage, only a fraction of the required funding is in place and it’s unclear when or if it will be built.
The train would be modelled after Vancouver’s Canada Line, an automated driverless system that connects downtown to Vancouver International Airport and the city of Richmond. It opened in 2009. Cost: $2 billion.
[...]
[email protected]
twitter.com/andyriga
© Copyright (c) The Montreal Gazett
Wow I see ADM has been reading my posts in this thread and on this forum! It's a fantastic idea, it's an embarrassment this hadn't been done. Think of all the cool infrastructure projects cities get when hosting major international events. Montreal had the biggest expo fair in its day and a dummerbolympic and nobody ever bothered building a line then. Do it now!
Wow I see ADM has been reading my posts in this thread and on this forum! It's a fantastic idea, it's an embarrassment this hadn't been done. Think of all the cool infrastructure projects cities get when hosting major international events. Montreal had the biggest expo fair of its day and a summer Olympics and nobody ever bothered building a line then. Do it now, because we sure as shit ain't getting another Olympics!
http://blog.timesunion.com/business...ak-adirondack-customs-delays-at-border/53709/Agreements would end Amtrak Adirondack customs delays at border
May 10, 2012 at 12:21 pm by Eric Anderson
Albany Times-Union
U.S. Sen. Chuck Schumer announced this morning that a new customs and immigration facility at Montreal would allow for prescreening of U.S.-bound passengers on Amtrak’s Adirondack services, eliminating delays at the border that sometimes could stretch to two hours. An agreement that would give U.S. customs and immigration agents authority still needs to be worked out, but the screening facility itself and plans to eliminate the border stop are already in place, a spokesman said.
The agreement with Canadian authorities essentially would turn the screening facility into a piece of U.S. territory for southbound train departures, and Canadian territory for northbound arrivals.
For passengers, it would mean a smoother trip in both directions.
“This is another step forward in our quest to optimize border fluidity,” said Garry Douglas, president of the North Country Chamber of Commerce in Plattsburgh. “Senator Schumer and our other Washington partners, Senator Gillibrand and Congressman Owens, have championed this cause in Washington while we have worked with our Quebec and Montreal partners in Ottawa, and it appears a breakthrough is at hand.”
Similar arrangements are in place in other countries. At the St. Pancras station in London, for example, the platform area with its French customs and immigration officials is regarded as French territory. United Kingdom customs and immigration officials in the past have boarded the London-bound trains in Paris to process passsengers.
Quebec and New York officials have viewed the Adirondack line as a critical link between Montreal, the Capital Region and New York City. There was no word on how quickly the screening center would be completed, the agreements between U.S. and Canadian border agencies would be reached, and processing of passengers in Montreal would begin.
This is good news. Another article said that they would also get rid of the St. Lambert stop, which is more inconvenient for me, personally. But I prefer to take 20 min to head to Central Station and save a two hour border wait.
For those unaware, Montreal-New York City takes 11 hours by train for 613 km (381 miles). Saving 2 hours through pre-border security screening makes an enormous amount of sense.
Now if only they could speed up the rest of the trip somehow. Montreal-Toronto is 539km (335 miles) by train and they are able to do it in 5 hours.
http://blog.timesunion.com/business...ak-adirondack-customs-delays-at-border/53709/
Daimler shuts down Mississauga’s Orion bus plant after government belt-tightening
Nova and New Flyer will benefit from this.
http://www.thestar.com/business/article/1167811--daimler-shuts-down-mississauga-s-orion-bus-plant
A Mississauga bus plant which began its life in the 1970s as the centerpiece of a provincial government strategy to bolster Ontario’s manufacturing industry was shut down Wednesday, throwing up to 390 people out of work as German automotive giant Daimler announced it was pulling out of the transit bus business in North America.
Daimler blamed slumping demand for transit buses from regional and municipal governments across the continent for the closing of Orion Bus Industries, which caught the Canadian Auto Workers union off guard as it came just a few weeks after the two sides had signed a contract extension.
“This was a really difficult decision,” said Daimler spokeswoman Silke Walters. Last year, just 463 Orion buses were sold across the continent, down from 734 in 2010, according to Walters.
And with governments across the continent in deficit-fighting mode, the company saw no clear road back to strong sales.
[...]
Must be the oilsands' fault!
That, or they built shitty buses!
They did; I can actually attest to this. The Orion buses in Toronto have proven to be pretty unreliable (I see one broken down on my commute at least twice per week, and overheard a few TTC operator conversations), and they are full of loose-fitting parts. They shake quite audibly over even minor bumps. Meanwhile, London's New Flyer buses feel much more solid. They're quieter more comfortable, and from what I've heard they've been good to the city on the maintenance front.
...something's wrong... I'm agreeing with you.

