Any monkey could have balanced budgets on the back of record oil and gas royalties, and thats just what we got, a great politician, but a bad leader
U couldn't...not when oil was $15-20 a barrel in the early/mid 90's. Ralph Klein was one of the few politicians that had the balls to run a balanced budget. Most politicians give in to the demands of the people and rack up huge deficits, it's one of the flaws of democracy.
Don't get me wrong, i think democracy is the best system out there, but sometimes what the people want and what is good for the state can be two different things.
Oil prices started going up in 2004 and peaked in 07/08, don't believe me??? check this out.
http://www.inflationdata.com/inflation/inflation_rate/historical_oil_prices_table.asp
So do your research before u say something, or else u might look foolish to others.
Current Nose Creek alignment would probably run $700-800 million from memorial -> Aurora business park -> Harvest Hills Blvd -> Stoney Trail(15-16km), although Nenshi doesn't prefer this alignment.
I guess we can bring the 8 ave subway estimate to $2.3 billion dollars for 2.3km according to this article.
"However, the subway construction cost is very expensive, in accordance with international standards for the Mass Transit Railway Construction cost estimates into account, total cost per kilometer of subway is about 1 billion U.S. dollars"
http://eng.hi138.com/?i64176
If there was only a way we could bring the cost down...![]()
I hope you're right about the cost
Stupid question time:
The downtown functional subway study was comissioned by bronco in 07' and I heard it was suppose to come out in 09/10. Has it come out yet or is still in the works?? I can't seem to find any info online.
Can't really bore 8th Ave very easily with the tie in to existing tunnels at city hall, no good launch sites, and the depth it is notionally planned at (trains running on what would be the 'P2' level of most towers)
Even then, with the number of stations planned you are going to have multiple station boxes at almost full avenue width at least 130m long, plus likely two needed crossover boxes near each end. So you are going to have huge holes either way.
If you can convince city council to do only 3 stations with rough-ins at one for the connection to SE-LRT I think you could get it done sub $450 million.
Every station on top of that add $75 to $100 million.
Big engineering question still is can you get the LRT onto the bridge to sunnyside without needing major realignment of 4th Ave too far south to make it unreasonable since the Bow Trail connector that was to elevate 4th Ave was never built.
Can't really bore 8th Ave very easily with the tie in to existing tunnels at city hall, no good launch sites, and the depth it is notionally planned at (trains running on what would be the 'P2' level of most towers)
Even then, with the number of stations planned you are going to have multiple station boxes at almost full avenue width at least 130m long, plus likely two needed crossover boxes near each end. So you are going to have huge holes either way.
The connection at the end at the Louise Bridge is the big question. I think it might be possible, but its going to be close. Elevating 4th might be the only workable solution, and building it would be quite complicated as you wouldnt want to close too many lanes at a time, not to mention you'd also need to keep the Ctrain running at the same time. The only other option might be to look at bringing the train to grade between 4th and 5th and leaving the at grade crossing at 4th.
I would also guess that there are tons of sub-surface utilities that use the 8th Ave ROW that would need to be relocated - this would also require huge holes.
There seems to be busways sold all over as cheap to convert to LRT later. It didn't happen in Seattle, and it isn't happening in Ottawa. Unless you're going to O-Bahn the line, it is going to need a wider corridor, built to tolerances of human drivers. Who knows what vehicles we will want to run in the corridor 10 or 15 years from now, if we design to a requirement today we might find we don't want to build low floor lrt in the future for some reason. Or it might constrain us to one manufacturer, or one vehicle that wouldn't be optimal because we assume certain performance characteristics. Path dependence can in the end be very expensive.
To be honest, if we have a defined plan on what we want, why should the city wait past when the next batch of engineering studies are done? Tender the project, borrow the money either traditionally or as a P3, and raise taxes to pay for it. Put it to a referendum and it would pass.
The city has been protecting 8th ave since the Ctrain started. My understanding that most utilities have been rerouted over the years. I don't think there is as much do relocate.