HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 11, 2010, 6:27 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,746
Quote:
Originally Posted by Ottawan View Post
If it could be done for as little as you say, I'm also all for it. I also feel there's no need to wait for the LRT, we should build it as soon as the design study & agreements with the airport can be completed and connect to South Keys.
Hmmm, a peoplemover system designed to connect airport terminals being implemented in this way? Who would ride this train? The buses are empty now and they go downtown.

Sorry, I am not in favour in developing a patchwork quilt of different rail technologies in this city. It is shortsighted.

As I recall, the estimates for building an airport LRT spur was $50 Million so it is no bargain.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 11:02 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.