Summary
The applicant’s current proposal provides for developing the site with uses considered appropriate for a Mixed-Use Centre, however, as a result of the site’s current constraints, is not responsive to the policies and objectives of the City for development within mixed use centers to contribute to place-making and to provide for strong integration with the adjacent community and with transit. The intended focus of Mixed-Use Centres is to have these areas developed as compact areas with a high quality public realm so that these areas will be focal points for the communities wherein they are located, and designed to integrate with transit and support pedestrian connections to and from adjacent areas within a pedestrian focused environment. The significant constraint to achieving this form of development is the existing major infrastructure crossing the site. This infrastructure, as reflected by the development concept, is preventing the site from being developed in a way that will be much more responsive to the planning and policy directions set out in the Official Plan for Mixed-Use Centres. As such, the applicant has demonstrated that development can be technically achieved within the existing site constraints, but that such development cannot achieve the key directions of the OP as discussed related to Mixed-Use Centres becoming special and unique places.
As noted, as part of the CDP process underway, the potential exists to relocate some of the major infrastructure in the area to unencumber potential development sites, which would allow those sites to be developed in a way that can respond well to not only the objectives of the OP for Mixed-Use Centres, but also in a manner that contributes to having the area advance the place-making objectives and integration objectives of the OP. This examination is part of the Master Servicing Study that is part of the CDP work program. Staff therefore are of the view that the retention of the holding provisions is appropriate. Determinations for this site, as was acknowledged when the City was working with the applicant to examine the potential for an integrated development of the site with the North-South LRT and key adjacent areas, are considered best made in the context of the CDP process. The subject site, being at the terminus of the Mixed-Use Centre and being adjacent to a major transit facility (both existing and planned), is considered too important to be developed in isolation of finding the best approach for development through the CDP process.
In this regard, as noted, the OP requires that CDP’s be completed for all Mixed-Use Centres. While the OP allows development to proceed in advance of CDP’s being completed, there is clear direction that where development does proceed that it occur in a way that is consistent with advancing all the policy objectives set out in the OP. Staff are of the view that the development proposed does not meet this direction.