I bet if I were to randomly guess that they are building another Shoppers Drug Mart, there would be a 50% chance I'd be right :haha:
The development on Scott Street near Churchill is now above ground, with at least 1/3 of the ground floor erected (though it's made of wood and not concrete...very strange).
Most of the non-mixed use condos that are six storeys and under are bound to be wood frame construction (Stoneworks Lofts and 360). It's sort of the magic number. This is why I think allowing 8 storeys is a good thing as it ups the construction quality.
Planning committee shrinks zoning on 'intensification dream site' in Sandy Hill
Those city officials found out there had been an oversight in the comprehensive zoning bylaw that merged all the zoning bylaws from the area's pre-amalgamation municipalities. While the current zoning allowed a 10-storey building, another official planning document for Sandy Hill called for low-rise development — and on this site, only four storeys.
On E-MAPS it looks like the apartment building/parking lot is one lot... the 30 metre zoning applies over the whole site.
I think the limit for wood construction is 4 storeys in Ontario, but word is they are going to change it to 6 like BC did (it's one of the action plans from the recent proposed Northern Growth Plan)
http://communities.canada.com/ottaw...fiery-defence-of-wood-frame-construction.aspx
As much as I am a keener for intensification, I have to agree with council and ASH on this one. This site is hardly dreamy in its potential for sustainable living. Specifically, it's too far from Rideau retail to be very walkable and it's poorly serviced by transit. Furthermore, it's in the middle of an established urban community; I'd hate to see this part of Sandy Hill become more like "upper" Sandy Hill (or some Toronto neighbourhoods) where godawful apartment blocks are thrown down beside beautiful Victorian houses at seemingly random midblock locations.
This is clearly a case of a developer trying to cash in on a riverside property.
Note: on Street view, you can see an existent 10-story building at 85 Range Road. The building would likely be beside it on 87 or 89 Range (likely not 81-83 Range).
http://maps.google.ca/maps?f=q&sour...plAnLKkFP36OOo-FQj-kcg&cbp=12,98.66,,0,-27.69
Top Ottawa construction permits in October
Ottawa Business Journal
Thu, Nov 26, 2009 3:00 PM EST
The city issued 837 construction permits in October with a total value of $159.4 million. The top projects by value are:
Property
Contractor
Description
Value
Sq. ft.
Canadian Security Intelligence Service (1941 Ogilvie Rd.)
EllisDon Corp.
Construct a five-storey addition plus two basement levels to an existing office building
$22,412,000
124,370
University of Ottawa (136 Jean-Jacques Lussier Priv.)
To be let
Interior alterations to accommodate new faculty requirements in an existing institutional building
$10,000,000
13,785
Albion Executive Tower (25 Nicholas St.)
To be let
Fit-up on the ground floor, shipping and receiving and floors 10 to 22 in a 22-storey commercial building
$2,750,000
193,757
C.D. Howe Building, east tower (235 Queen St.)
To be let
Tenant fit-up on the fourth floor of an 11-storey commercial building
$2,500,000
3,668
Tommy and Lefebvre (464 Bank St.)
To be let
Reconstruction of a retail building damaged by fire
$2,250,000
13,886
Institute des services d'urgences (801 Aviation Parkway)
Daoust Construction
Footings and foundations for two basement storeys for a future four-storey institutional building
$1,900,000
45,425
Former Canadian Tire (1777 Tenth Line Rd.)
Minto Communities Inc.
Tenant fit-up to a one-storey commercial building
$1,700,000
84,995
Lexon Transport Inc. (1132 Old Innes Rd.)
To be let
Interior/exterior alterations to repair and reconstruct a one-storey industrial building damaged by fire
$1,600,000
2,986
Vincent Massey Park washrooms (701 Heron Rd.)
To be let
Construction of a one-storey facility building
$1,492,000
2,228
Shoppers Drug Mart (181 Greenbank Rd.)
To be let
Construct a one-storey apartment building
$1,400,000
198,310
Source: City of Ottawa
Shoppers Drug Mart is into housing? :haha: what the heck is a one storey apartment building and why would it cost 1.4 million?
Shoppers Drug Mart is into housing? :haha: what the heck is a one storey apartment building and why would it cost 1.4 million?
3) Presentation by David Spillenaar of Springcress Properties and architect Barry Hobin regarding potential development of the northeast corner of Wellington and Island Park (current location of Pro Shine). The proposed building is just to the west of Bella’s Restaurant. The lot on the east side of Bella’s is already approved for a development which Barry Hoban is also designing. Mr. Hoban presented preliminary drawings for the massing of the proposed project. He made the following points:
a. Two potential general designs are being considered
i. A six-floor version that comes closer to the rear property line
ii. A seven-floor version that leaves more room at rear between back of building and property line.
b. Both designs include “step-backs” at several levels of the building
c. This is a “Boutique” development meaning that there is not a lot of room for many units, a maximum of 40 to maintain 1:1 parking ratio.
d. The location is designated as a “Gateway” in CDP which allows it to go to 20 metres (6-7 stories)
e. The project is very much in the early stages. They are only looking at massing for the moment and seeking feedback from the community. The corner of the building is the only architectural element at this point. It creates a sort of gateway into Wellington Village.
f. The architect and the developer acknowledged that this will be a long process and that there will be opposition particularly from the residents directly to the north of the site.
g. The six-floor option would sit 25 metres from the property line, which is within the by-laws.
h. Both versions of the design have the same density of units. Because of the size of the lot there is very little play in that regard.
i. The development would include one level of underground parking and parking at grade
j. Both designs are smaller than the Piccadilly across the street.
k. Sun shadow is no different between two options
l. A big issue to be resolved will be off of which street access to the building will be established.
m. Maps of the area are available on-line from Bing Maps
n. As with all other recent developments in the area the proposal will include commercial space at ground level and residential units above.
o. When asked about LEED and other green features the developer replied that they haven’t gotten past the massing stage at this point. The architect mentioned that most of their developments are “green”.
p. At this point only the seven-floor option requires any variances and this only for height. The west side might need a variance because it goes right up to what is designated as a street though that street isn’t actually there as it dead-ends before the site.
q. They will not be looking for cash in lieu of parking at this point as the marketplace will demand adequate parking anyway.
r. The architect and the developer don’t believe retail will cause parking problems because there won’t be very much of it.
s. Units will not rentals but condos and won’t be particularly small or inexpensive.
t. Architect repeated that at this point they are just looking for honest feedback. They are trying to create a good process by putting their cards on the table which benefits them in the long run.
u. They can be reached through their website. http://www.hobinarc.com/index2.html
v. Jason also has David Spilenaar’s email address