jollyburger
Active member
Seems more orange than yellow personally.. I think the left panels are more close to the final colour than the right one.
Definitely a welcome change from the aggressively multicoloured/pixilated institutional facade design of the last 10-15 years.
Some newer (minus the facade gap) drone footage of the site from one of the building engineers
https://www.instagram.com/p/DbonXvlDgNO/
Some newer (minus the facade gap) drone footage of the site from one of the building engineers
https://www.instagram.com/p/DbonXvlDgNO/
That footage is a little old, looks to be from late May.Thanks.
The roads look to be done too.
Thanks.
I guess those bike paths will lead to/from Strathcona Park?
For now, they stop at the playing fields at Trillium Park. (It looks like there are other bike lanes around the perimeter of the site, including parallel with Prior)
Not sure if it was posted earlier in this thread but it seems like the move is happening in February
https://www.linkedin.com/posts/glyn...spital-will-activity-7498896947907420160-bp5p
CSRC is at the half way point and a specialized crane is being brought in for the lift of the walkway in September. The first exterior panel is going up on Level 2 as well
https://www.thenewstpauls.ca/en/new...csrc-reaches-midpoint-structural-construction
Not sure if it was posted earlier in this thread but it seems like the move is happening in February
There's a huge crawler crane that has been assembled on site in the past couple of days, so the lift of the skybridge is presumably happening in the next day or two.