The concept of rubbelization makes sense I guess. I just have no experience on the consistency of breaking the concrete down and the compacting it. And how consistent the outcomes are vs what would seem to be seem to be a difficult task. Ie: Breaking 8" or 10" of concrete down into small pieces similar to gravel, then compacting it to spec. Co-Pilot tells me (lol):
Concrete rubblization is a construction technique that breaks existing concrete into small fragments to create a base for new pavement or to decommission structures, saving time, cost, and materials.
What is Rubblization?
Rubblization involves fracturing existing concrete in place into small pieces, typically ranging from sand-sized particles to 4–8 inches in width, using specialized equipment such as hydraulic breakers or resonant beam machines. This process destroys the concrete slab’s structural integrity, turning it into a flexible, interlocked base material suitable for overlaying with asphalt or other pavement types. The technique eliminates reflective cracking, which occurs when asphalt overlays crack above concrete joints due to temperature and load stresses.
Applications
Road Rehabilitation: Rubblization is widely used to rehabilitate deteriorated Portland cement concrete roads. The fractured concrete serves as a base for a new asphalt overlay, providing a smoother surface and extending pavement life . It is particularly effective for roads with severe material durability issues, such as alkali-silica reactivity, D-cracking, or freeze-thaw damage.