In the SouthEast Corner of Winnipeg, I feel like the road layout should be done similar to this. I remember looking at the plans for replacing the overpass for Fermor Ave with options to realign Fermor to bypass the Business Park, or just simply replace the overpass. I am for the idea of realigning the TCH to bypass the business park because it would connect to the future Abinoji Mikanah Expansion.
One flaw is that they've been planning to connect to expropriate through the Navin Acreage. I feel like it would be better for them to expand AM south of Navin Road to expropriate less properties. And another flaw is that if they bypass Fermor, there won't be very good access to Plessis Road/ Edward Schreyer Parkway.
These designs I decided to have Abinoji Mikanah connect seamlessly with Highway 1. The current Plessis Overpass would be knocked down and either have ESP go halfway between Plessis Road and Symington Road, or just a bit West of Symington Road. The segment of Fermor Ave between ESP and AM (North of the Tracks) would be downgraded to a Business Park arterial analagous to Scurfield Blvd.
As for the local roads, most of them would be severed except for wherever there are residential properties. Plessis between St Josephs Road to Abinoji would be closed, along with Navin between Plessis and West of Symington Road.
Overall, I think these designs would be more futureproof for future development. I always thought it would make sense if TCH 1 would connect with Abinoji Mikanah. And AM at ESP Intersection has more room for future Interchange flexibility. Above all, Abinoji Mikanah (TCH 1) East of ESP would be able to maintain its 100 km/h speed limit. Plus, this design would be great for drivers who are willing to go to the Airport as it connects directly to Route 90.
The flaw with this idea is that it would be harder for drivers who want to head to downtown. Going EB on AM, you'd go slightly North on ESP and turn left to go to Fermor Ave. OR maybe for simplicity, maybe AM between Perimeter and St Annes Road could carry the TCH 1 designation. St Annes Road would be marked as TCH 1 North of AM all the way to St Mary's.
There’s a pre existing turnoff on fermor that cuts through Dawson crossing and ties into Dawson just east of the Southland development. Dawson road will be widened quite a bit because the berms we built last fall were set back about 20 meters from the edge of the road.
Also if you look at Sage Creek there’s a future extension of Warde avenue that heads east across Dawson road into the field.
Edit - I have no idea how to upload photos or I’d draw it out. I also have a full set of plans for Dawson Crossing in pdf form.
City seeking consultant to find St. Mary’s Road traffic solutions
Scott Billeck
Wednesday, May. 20, 2026
![]()
MIKAELA MACKENZIE / FREE PRESS
The four-lane section of St. Mary’s Road between Morier and Tache avenues creates a major bottleneck.
The City of Winnipeg is looking for ways to ease congestion and improve safety along one of the busiest routes into and out of downtown.
A newly issued request for proposals seeks a consultant to study a 1.5-kilometre stretch of St. Mary’s Road between Morierand Tache avenues, where more than 40,000 vehicles travel each day.
“It’s been a long path to get to here, so pleased we’ve arrived here and glad we’re at least starting in on this,” said St. Vital Coun. Brian Mayes, who has pushed for changes over the last 14 years, since being first elected in 2012. Discussions to look at possible changes to the stretch of road date back to 2005.
The city’s 2011 Transportation Master Plan had originally projected St. Mary’s Road would be widened between St. Anne’s Road and Tache Avenue by 2021, but St. Boniface Coun. Matt Allard opposes any widening efforts.
Allard, whose ward covers the majority of the 1.5-kilometre stretch, said Wednesday that he wants the RFP process to play out and see what the public service comes back with, reserving further comment until then.
According to the city, the four-lane section creates a major bottleneck because it narrows between wider six-lane portions of St. Mary’s to the north and south. The result is frequent congestion and “extreme” travel times, even during minor traffic disruptions.
The city wants the consultant to identify lower-cost improvements that could be made in the short- to medium-term without major reconstruction or widening of the roadway, which is mostly lined with residential homes and apartments along much of the stretch of road.
More significant upgrades — including road-widening and possible rapid transit and cycling infrastructure — are expected to be examined later as part of a broader future study of the St. Mary’s corridor.
The route has already been identified in the Winnipeg Transit Master Plan as part of a future rapid transit network, though it is not currently considered a top priority.
The city recently approved parking restriction changes along parts of St. Mary’s Road between Marion Street and Vivian Avenue, extending no-stopping rules during peak southbound rush-hour periods by a half-hour, from 3 p.m. to 6 p.m.
Mayes said he already has a few ideas that could help ease congestion along the corridor, including the possibility of reversible lanes that would add capacity in the direction of peak traffic flow.
Under that concept, a third northbound lane could open during the morning commute — possibly even one for transit — and switch to a third southbound lane during afternoon rush hour.
Mayes acknowledged the idea would be difficult to implement along the undivided stretch of St. Mary’s Road without widening the street, but said it may still be worth exploring if it means temporarily reducing traffic to a single lane in the opposite direction during peak periods.
He also suggested the city examine changes to the F7 transit route, which currently merges left as northbound traffic narrows from three lanes to two before turning right onto Carriere Avenue — a manoeuvre that frequently contributes to rush-hour backups.
“Could we extend that third lane as far north as Carriere?” Mayes said. “That would realign things a bit.”
The corridor has also been the site of several serious crashes in recent years.
In 2022, a 17-year-old passenger was killed and an 18-year-old driver injured after a vehicle slammed into a hydro pole near the bottleneck.
In October 2024, a vehicle travelling 213 km/h in a 60 km/h zone smashed into Midland Appliance World just north of Vivian Avenue.
Video footage showed the vehicle missing a curve before hitting a guardrail, hydro pole and the building, eventually coming to rest upside-down near Minute Muffler Auto Service Centre and a nearby bus stop. No one was injured.
At the time, Minute Muffler owner Max Traa said crashes are common along the northbound stretch of St. Mary’s near his shop, adding a stop sign at Morier Avenue had already been replaced multiple times following collisions since the 2024 crash.
Mayor launches defence, aerospace, aviation sector investment task force
By: Free Press staff
Posted: 2:41 PM CDT Thursday, May. 28, 2026
Mayor Scott Gillingham has created a task force to support his goal to expand Winnipeg’s “sky economy.”
Its members will determine infrastructure needs near Winnipeg Richardson International Airport over the next 10 to 25 years, aiming to boost the defence, aerospace and aviation sectors.
The Sky Economy Employment Zone Task Force will lay out needs related to the Royal Canadian Air Force, City of Winnipeg, Winnipeg Airports Authority, CentrePort Canada, the training sector and civilian partners.
The mayor said that information will help advocate for new investments.
“Winnipeg’s future economy is going to depend upon the growth of that area … (we need) the infrastructure in place to accommodate and enable that growth,” said Gillingham.
The task force will consist of Catherine Kloepfer, the city’s former chief financial officer, Matthew Dryburgh, the city’s acting deputy chief administrative officer, and Brian Kelcey, who works in the mayor’s office.
The task force is expected to report back to the mayor by July 15.
So what is the reserve depth of spare transformers for Hydro? If we get another storm like Tuesday's are we just hooped? I know the big ones are at substations are bespoke with long lead times, but are the small pole-top ones a commodity item?
Nope. Not in the cities budget forecast. Which goes to 2031. It can always be added.
Nice. The City crews will do work like that which is not listed in the budget forecast. It falls under some kind of maintenance budget. They do these mill and fills on bad streets that aren't in the budget.
I'm still not over how they completely did a full concrete pavement rebuild on eastbound Inkster for most of the stretch between Airlies and Main in 2024, and then the following year, did the westbound stretch in asphalt instead continuing the full rebuild.
I'm still not over how they completely did a full concrete pavement rebuild on eastbound Inkster for most of the stretch between Airlies and Main in 2024, and then the following year, did the westbound stretch in asphalt instead continuing the full rebuild.
Smooth, albeit still a bit abrasive concrete eastbound Inkster, while smooth yet ondulating bumps on westbound Inkster paved in asphalt. :koko:
I'm still not over how they completely did a full concrete pavement rebuild on eastbound Inkster for most of the stretch between Airlies and Main in 2024, and then the following year, did the westbound stretch in asphalt instead continuing the full rebuild.
Smooth, albeit still a bit abrasive concrete eastbound Inkster, while smooth yet ondulating bumps on westbound Inkster paved in asphalt. :koko: