Are the lakes a deficiency that is going to be corrected by the Contractor/negotiated with the Contractor/whoopsie-daisy by the City, and thus work is stopped?
They still haven't fixed any of the drainage issues on Queen Street.
Are the lakes a deficiency that is going to be corrected by the Contractor/negotiated with the Contractor/whoopsie-daisy by the City, and thus work is stopped?
An east-bound on-ramp would also be good from Bronson, but that's just daydreaming
There are like 4 EB off ramps from after Parkdale before the next onramp
I think the issue is lack of space under the 417 bridge for a southbound left-turn lane.
There used to be one there - up until the 70s maybe? I think that the issue is space. With the massive two-lane off-ramp for Kent, there would be no room for an on-ramp at Bronson. I think you would basically need to recreate the basket-weave you see at the WB on-ramp at Lyon, which doesn't meet MTO standards, and you would be weaving across two lanes of exiting traffic.
I was at the intersection of Richmond and Golden yesterday, right at the foot of Byron Linear Park (Where the farmers market is on the weekends).
Aside from partially complete reconstruction of the intersection that's been sitting, unfinished, and no work occurring for the last two months (a mess of unfinished gravel/bike lanes/upturned signage/ unfinished curb mess...
It was raining quite heavily, and ALL of the pedestrian crosswalks were lakes. The roads were un-puddled, however there was 4-5" of water on EVERY crosswalk of that intersection. Like, perfectly aligned rectangles of water at each crosswalk. A brand new intersection.
WTF.
Are the lakes a deficiency that is going to be corrected by the Contractor/negotiated with the Contractor/whoopsie-daisy by the City, and thus work is stopped?
What I would like to see happen now:
Pipe-Jack Tunneling should be used to create pedestrian/cycling passes under the 417 on each side of the Bronson overpass. Then the sidewalks along the section of Bronson under the overpass can be removed, and that space allocated to the missing south-bound left-turn lane.
Regardless, putting pedestrians in a box culvert is a CPTED nightmare, especially near Centretown.
Highway 417 work could wrap up by late June, city says
Lane closures have caused headaches for commuters west of downtown
CBC News
Posted: Jun 13, 2026 2:59 PM EDT | Last Updated: 1 hour ago
Drivers frustrated by Highway 417 lane closures that have caused big bottlenecks west of downtown could now see relief by late June, the city says.
In a memo to city councillors Saturday, rail construction program director Richard Holder said the lanes near between the Woodroffe Avenue and Pinecrest Road exits could reopen as early as June 22, more than five weeks ahead of the original schedule.
The closures, caused by work on the western expansion of Ottawa's light rail network, have been wreaking havoc on commutes since they began in May.
They were initially expected to last until late July. The reopening had previously been pushed up to July 6.
To meet the new June 22 date, crews will need to work through the night in the area next weekend, Holder wrote. Drivers should expect:
- Westbound lane and ramp closures from 9 p.m. on June 20 until 8 a.m. on June 21.
- Eastbound lane and ramp closures from 9 p.m. on June 21 until 5 a.m. on June 22.
That work depends on the weather co-operating, Holder added.
https://www.cbc.ca/news/canada/ottawa/highway-417-construction-work-finish-date-june-9.7234618
Notionally, or data-backed?
CPTED is not exactly a strict science, but the difference between walking along a sidewalk that is open to the road and an enclosed box culvert is not particularly subjective. One is going to make people a lot less comfortable than the other.
But from a three-D spacial point of view, a box culvert is generally going to be a transport solution only where a surface sidewalk isn't an option.
In that image, the (assumed) MTO employee is working hard to clear a catch basin to drain the flooded area – which is shown in this photo from the same CTV NEWS article.
I think the extra-tall wall there is throwing off the depth perception, but it's clearer in the wide shot that he's cleared the correct location - next to the handle of his tool you can see the depression in the water where it's flowing into the catch basin.![]()
Unfortunately, the man is not where the catch basins are. In this annotated Google satellite view, I have marked the catch basins in black. Where the worker is desperately toiling is marked with a red arrow. I doubt that he was able to clear the water.
![]()
However, that second CTV NEWS image also shows that additional maintenance work is needed to keep catch basins, and their culverts, clear. You can see that there is a build up of stormwater on both sides of the west-bound lanes of the highway. There are multiple catch basin grates on each side of the road, since this is a low point where water is expected to collect. That the stormwater is pooling and not flowing away tells me that a) the culvert does not allow enough flow; or b) the catch basin grates are clogged. The second is what the fellow is trying to clear.
However, as mentioned, there are two grates per side of the road, based on the above annotated Google satellite view. This would indicate that the culvert should be of a large diameter. That said, it is probably that there is debris within that culvert, restricting the flow. Certainly, there is debris on top of many of the catch basin grates – shown in this Google Street View image of the catch basin just west of the Richmond Road overpass:
![]()
Perhaps the MTO needs to run a street-sweeper along the shoulders every now and again. And clear out their culverts every couple of years.
The debris in the picture is nowhere near blocking the catch basin