I didn't want to pad the main thread with too much, but there are some further recreational items, excluding the 2026 items, that have been discussed before.
2027 is very light.
2028
- Reversing Falls Trail - Phase 2 ($1.25M)
- Dog Park at Market Place West ($50K)
- Tucker Park Kayak Launch ($50K) - This sounds awesome
2029
- Fort Howe refurbishment ($300K) - Fencing/Gates/Asphalt/Flag Pole
- East Side Splashbad - ($1M)
- Rockwood Park Washroom Building Renewal ($500K)
2030
- The A-Frame replacement is described as phase 1 and 2 ($2.27M) - Demolition, new building + septic tank
- The ball hockey/basketball at Market Place West has $1M put aside for it.
- Seaside Park Phase 1 has $750K, and there is a Phase 2 with another $750K in a future, unspecified year.
- Memorial Park artificial turf ($750K)
- Loch Lomond Reservoir ($1M) - washrooms/changerooms/life guard space
- Dominion Park Trail Network ($100K)
Unspecified Year
- Shoreline Trail access to Bayshore Beach ($600K)
- St Peter's Ballfield ($500K)
- Basketball Court at Shamrock Park ($1M)
As for the ball hockey space, it's definitely ball hockey and not an ice surface. I know you are very passionate about this, but I think this could complement the new facility in the industrial park and be a good way to continue improvement to the lower west side. There will be more recreational facilities down there than almost anywhere in the city at this rate.
Speaking of outdoor ice spaces, why isn't the skating surface uptown open yet? It's been plenty cold for weeks, and I know the one in Fredericton is already open. They don't even have the excuse of it being their first year anymore. It would have been awesome to have it open for Uptown Sparkles. I am sure the kids would have enjoyed that.