Regina | New Geothermal Indoor Aquatics Facility


They put up a zoning change application AFTER the ground breaking. So I think there was a snafu when they applied for a permit causing it to be rejected due to the height delaying the start. The process didn't wrap up until 19 November. The delay probably messed up contractor scheduling, which probably required more work to be initiated after the official approval.

I found the decision document. https://www.regina.ca/export/sites/...elopment/PL202500305-Record-of-Decision-2.pdf

One would think they would be smarter than that I’m not the process would’ve been speeded up in two days if they had any brains
 
They had a sod turning ceremony in August a half a year ago Construction was supposed to start, but the mayor had said the longer they wait the more it’s gonna cost. The cost is probably got up another $30 million. Why have you not said why haven’t you not started Construction?
Not a peep, not a word be honest with the people Regina collects tens of millions of dollars in tax money or is that money? Where is it going? He says nothing about it or about anything. He really is not the right man to be the mayor of the city of Regina, the city deserves better.
 
Definitely underway now. Was a sign up from the Albert Street side saying the road on the left of the first image is closed. Not sure if that will be a long term closure for construction.

55145980571_2511ec243d_c.jpg


55145980421_f7cc88cfe0_c.jpg
 
Someone from the city told me the current work is just removal of contaminated soil. Spring / Summer before major construction work begins.
 
No equipment at all on site when I was past there this morning. Could indicate the contamination cleanup is done.
 
This site hasn’t really changed that much in the last 2 1/2 years
Other than the big hole and all the piles. Starting to do piles on the water park side close to the field house now. In the lower part they excavated around the cluster of piles leaving them as a raised mound. With the two tiered pile layout on the left side maybe the left pool will have the diving section on the bottom side of the image and the right pool will be a single depth lane swimming pool.

55655483496_1b9548df5a_b.jpg
 
Starting to put forms around the outside of the piles. You can see that the pool on the left slopes. I wonder how far along the pools will get before they get a building over them.

55663820802_fa25f304bc_b.jpg
 