CHICAGO: Transit Developments


There are more details in the tweet replies, I pasted them over in the General Developments thread. With regards to transportation, the Sox lots would be turned into railyards for Amtrak if the team decides to move north. I imagine a lot of Bridgeport folks will be pissed

HGItqTVXgAAwlv0

Aahhh got it. Thanks.
This is far worse than what Reinsdorf was originally proposing with moving the Park to the 78, back in 2024. Oh boy.
 
Do the Sox ownership think that they will get more fans if they move 3 miles north? How about investing in the team so the Sox aren't always in the bottom half of the AL rankings? And all this is hinging on somehow getting air rights to the Metra yards immediately to the west, because the 14th St Yard is not nearly large enough to hold an MLB stadium. At its widest (along Roosevelt Rd), the yard is roughly 550 ft, whereas the current Comiskey is 700+ feet when only counting the field and seating bowl. Including stairs, ramps and gates, it's over 850 feet.

No, it's possible to fit a ballpark on the yards. They would just need to extend the grandstands over the mainline tracks at the center. This is how Target Field was built in Minneapolis; you could drop a carbon copy of Target Field onto the 14th St yard in Chicago and it would fit.

Since Amtrak is the owner of all the tracks in this area (except the Metra yard which is BNSF-owned), I assume air rights are also part of the deal. Ishbia clearly prefers a ballpark on the east bank/78, probably for better CTA access and synergy with the Fire stadium, but he will surely retain the ability to put a ballpark on the yards site if Related doesn't want to play ball (heh).

FFm1-ZAc-XMAI98gb.jpg


Additionally, the South Branch bridge, which regularly gets stuck when being raised and unraised, is going to be a huge chokepoint in getting trains to and from Union compared to the much better located 14th St. Yard. Replacing the landmarked 113 year old bridge to a fixed span that still allows shipping underneath it may not even be possible, since the the bridge approaches are cut short by the at grade HC Metra tracks and elevated Orange line tracks to the south, and 18th Street viaduct to the north.

Amtrak is in final design on upgrades to the Canal St lift bridge that should reduce the sticking problem; that buys them maybe 5-10 years. They are also underway on a study for a high-level bridge (maybe a fixed span, or just a higher movable bridge). It's true that the 18th St and Orange Line viaducts make this difficult, but maybe they could get around on a different alignment.

Also, just pragmatically, if Amtrak is abandoning their 14th St yard site then they could do a land swap with the two boatyards at Canal St that account for 90% of the bridge raisings.
 
Amtrak is in final design on upgrades to the Canal St lift bridge that should reduce the sticking problem; that buys them maybe 5-10 years. They are also underway on a study for a high-level bridge (maybe a fixed span, or just a higher movable bridge). It's true that the 18th St and Orange Line viaducts make this difficult, but maybe they could get around on a different alignment.

Also, just pragmatically, if Amtrak is abandoning their 14th St yard site then they could do a land swap with the two boatyards at Canal St that account for 90% of the bridge raisings.

Has there been any comment on HSRA's concern? Does it seem reasonable or could it be mitigated somehow?

High Speed Rail Alliance opposes the sale, because it could disrupt efforts to make improvements to the city's rail network.

"We don't know what's needed on the south side of Union Station yet because no expansion plan has been put together. So we need to preserve that land for future use," said High Speed Rail Alliance executive director Rick Harnish.

https://www.msn.com/en-us/news/us/s...u?cvid=69e7f4db629b427babcd2f92a325a50d&ei=28
 
I think their concern is well-intentioned but a little naive. Amtrak is not DB or SNCF, there is no long-term stable funding source to make big rail investments around the Chicago terminal regardless of what kind of planning work takes place.

Amtrak did formulate the CHIP plan that was pretty good, but it was a fragile plan with a lot of moving parts and veto points from city, state governments, transit agencies, freight RRs, communities, etc. Then the Biden administration decided it was a low priority for grant funding and then Trump utterly killed the programs that could have funded it. Trump is not an outlier, pretty much every time a Republican is president they kill Amtrak funding and then Democrats have to fight for scraps to keep the system limping along.

If you are Amtrak and a private billionaire developer comes along offering to build you a whole new state-of-the-art railyard in exchange for the land under your current railyard, I think it is irresponsible to turn down the deal. Amtrak may have meager funding sources but they do have big value that can be unlocked in their land footprint. For what it's worth, if it can clear the hurdle of getting past angry Bridgeport residents, the new railyard should have a much larger capacity than the existing one. It is a big upgrade, not a downgrade. Supposedly Amtrak would be able to service six trains at once in a massive shed building (example), compared to just one train in the current yard. So it will support Amtrak and state DOT's plans to ramp up rail service over time.
 
Last edited:
Surprised no one posted about this yet. The RLE broke ground today. Can’t believe it but they really did. Here’s to hoping something good will come out of it somehow. http://https://blockclubchicago.org/2026/04/24/cta-breaks-ground-on-red-line-extension-six-decades-after-it-was-first-promised/

I'm surprised this isn't getting more local press actually..... It's kinda a big deal, regardless of how you feel about the RLE.

It is the first extension of a CTA line since...... The Orange Line in 1993? That's 33 years ago.......
 
I think their concern is well-intentioned but a little naive. Amtrak is not DB or SNCF, there is no long-term stable funding source to make big rail investments around the Chicago terminal regardless of what kind of planning work takes place.

Amtrak did formulate the CHIP plan that was pretty good, but it was a fragile plan with a lot of moving parts and veto points from city, state governments, transit agencies, freight RRs, communities, etc. Then the Biden administration decided it was a low priority for grant funding and then Trump utterly killed the programs that could have funded it. Trump is not an outlier, pretty much every time a Republican is president they kill Amtrak funding and then Democrats have to fight for scraps to keep the system limping along.

If you are Amtrak and a private billionaire developer comes along offering to build you a whole new state-of-the-art railyard in exchange for the land under your current railyard, I think it is irresponsible to turn down the deal. Amtrak may have meager funding sources but they do have big value that can be unlocked in their land footprint. For what it's worth, if it can clear the hurdle of getting past angry Bridgeport residents, the new railyard should have a much larger capacity than the existing one. It is a big upgrade, not a downgrade. Supposedly Amtrak would be able to service six trains at once in a massive shed building (example), compared to just one train in the current yard. So it will support Amtrak and state DOT's plans to ramp up rail service over time.

New yard at least does sound like an overall win. Not sure where Union Station upgrade funding stands or if it is only home favoritism, but Penn Station and the NE corridor getting $4.7 billion suggests there is money to be had.
 
Mod escalator enclosures, State/Lake, 1967

s-l1600.webp

____

s-l1600.webp

____

s-l1600.webp

____


The space age escalators were okay. I know beauty is in the eye of the beholder, but I've always thought those old State Street fluorescent lights are fantastic.
 
New yard at least does sound like an overall win. Not sure where Union Station upgrade funding stands or if it is only home favoritism, but Penn Station and the NE corridor getting $4.7 billion suggests there is money to be had.

Not favoritism exactly. In a way I don't blame them, it's hard to argue against more funding for the NEC as Amtrak's busiest and most successful corridor. Then the Biden administration chose to spend the rest of the money on some moonshot HSR projects - Brightline West is the biggest one, and it could genuinely be a gateway drug for Americans to experience real domestic HSR. But this left nothing for the Midwest.

Those grant program(s) in IIJA were annual grants, so it was possible for CHIP and other Midwest projects to win in future years, but then Trump and DOGE happened so those grant programs went away. Hell, they tried to claw back grants that were already awarded (see CTA Red Line Extension). Notably the Trumpsters did not try to clawback Brightline West, because it's a private project run by some of Trump's fat cat neighbors in West Palm Beach.
 
Mod escalator enclosures, State/Lake, 1967

s-l1600.webp
[/URL]


The space age escalators were okay. I know beauty is in the eye of the beholder, but I've always thought those old State Street fluorescent lights are fantastic.

WOW - Just look at how filthy the State Lake building was. Now
 
Among the list of transit service improvements for the CTA as part of the first round of NITA funding is the 57: Laramie bus.

The extension will take the route all the way from Grand/Latrobe to Jeff Park, practically doubling the route length.

Question I have is: When is the last time a CTA bus route was extended this significantly?
 
Huh, unexpected that Pritzker wants to see a Yellow Line extension

Skokie mayor floats ‘preliminary talks’ of CTA Yellow Line extension
“I’m happy to tell you we’ve begun very preliminary conversations with the governor’s office and community partners about the possibility of extending the CTA Yellow Line, the ‘Skokie Swift,’ to the Old Orchard corridor,” Tennes said to the nearly 150 event attendees.
....
“To be clear, these conversations are preliminary, and truth be told, one of them was held in the storage room at Soul Good Coffee when the governor (J.B. Pritzker) was about to give them a $100,000 check.”
https://www.chicagotribune.com/2026/05/12/skokie-preliminary-cta-yellow-line-extension/
 
Absolutely makes sense. Old Orchard is a huge commercial magnet for the near north suburbs. Should have been seriously persued back in 2003 when the last serious talks of an extension were had.
 
Old Orchard is going mixed use and adding like 500 apartments. The mood on an extension might be different this time.
 
Any worthwhile alignment will need to cross or skirt around Niles North property, because NNHS is a huge parcel between the powerline corridor and the mall. They're not gonna bore a subway out here so the line would have to be at-grade or elevated, or maybe with short trenched sections. If the mayor is saying NNHS must not be impacted, then this line is not worth pursuing.
 
Last edited:
I can't help but think the CTA should stop thinking about extensions and be more focused on interconnectivity and integration (i.e. Brown/blue connection or some form of circle line, or West Loop N/S line)
 
If the mayor is saying NNHS must not be impacted, then this line is not worth pursuing.

I interpreted the mayor's line as really being "NNHS' parking must not be impacted". A big reason for the previous extension being cancelled was cause the station would have terminated at NNHS parking lot and people complained they'd have no where to park, even though the line would have been single-track elevated :rolleyes:

I think if the line now terminates at Old Orchard instead of the NNHS parking lot, there'll be less pushback.

RRgthRZ.png

https://www.transitchicago.com/assets/1/28/Yellow_Line_Extension_LPA.pdf
 


Back
Top