Posted Apr 26, 2026, 9:19 PM
|
 |
Closeted Normie
|
|
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 12,871
|
|
Like I said.
Quote:
Originally Posted by Busy Bee
The Portal's(DTX) "portal" should be moved south to before Mission Bay Dr or ideally before 16th St so the entire alignment is below grade from the Pennsylvania Ave tunnel to Transbay. I don't understand why they're designing it like this having a couple thousand feet of at grade running instead of a trench or tunnel. Plus the DTX ramp wastes a bunch of space with this development.
|
Quote:
Originally Posted by Busy Bee
^ The bigger point I was trying to convey was that the phasing and masterplan of this railyard development should anticipate for that and not build the westermost element of this project the way it's depicted in the image. That phase should sit directly over the r.o.w. and not waste all that land by building around an open ramp and following its shape. That tower built at an angle like that is poor planning. Not only that but it totally precludes the ability to eventually extend King to 7th with or without the "boulevardation" of 280.
|
__________________
Everything new is old again
Sic semper tyrannis
|