HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #26  
Old Posted Apr 17, 2026, 7:08 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,543
Quote:
Originally Posted by ponyboycurtis View Post
I'm firmly in the thought that the hospital building and garage should have been flipped. Both for the train station and just as importantly not having a multi story car park abutting Dows Lake. Building to tall! crickets on the car park.

The irony of having to walk through/past a parking garage after leaving the station is great.

The station being across the street would be a non issue with the layout of the Hospital done another way. Moving the station across the street and under the garage is a sideways improvement at best.
I imagine building the hospital over Line 2 presented challenges that were insurmountable. Other configurations would have been possible, like the research towers around Line 2, the hospital on the west part of the site on Carling and the parking at the back, though it's possible the hill presented its own challenge for such an option.

As long as I can get from the station to the hospital without stepping outside, I'm fine with it. It's still far more transit accessible than the current location or worse the General campus.

And although the hospital is a bit further, the research towers will be well located closer to the station.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 12:36 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.