Winnipeg Construction XI


Rainbow Stage - Renovation & Courtyard Addition
Location: 100 Rainbow Dr
Developer: Rainbow Stage (1993) Inc.
Architect: 1x1 architecture inc.
Status: U/C
Documents: Rainbow Stage's Post
Media: Community centres, theatres among 545 Manitoba arts, culture, sport organizations sharing $50M in funding
Description: Rainbow Stage, Canada's longest-running outdoor theatre in Kildonan Park is undergoing a major renovation that honours its architectural legacy while modernizing the facility for the future. The project respects the building’s original Brutalist style by removing the 2011 outdoor and indoor murals—commissioned by local artists Mandy vanLeeuwen and Michel Saint Hilaire—to restore the exposed concrete, while unveiling a long-hidden rainbow-shaped relief in the lobby and adding vibrant powder-coated aluminum pickets for colour and improved security. Key upgrades focus on enhanced accessibility and life safety, including new gender-neutral washrooms, a Universal Toilet Room, additional water closets, handrails, guardrails, better lighting, and detectable warning surfaces. The 2300 seat venue will get a new exterior courtyard that will expand capacity as a gathering space for patrons before, during, and after performances, featuring new concessions and a smaller performance stage. The front-of-house is being reimagined with a clearer entry sequence, reoriented pathways, regrading to fix flooding issues, and new landscaping that better connects the venue to the park. The City of Winnipeg has committed $3 million dollars overall—starting with $1.5 million in the 2023 budget—while the province chipped in $1.4 million back in 2023 to support the campaign along with contributions of $250,000 from The Winnipeg Foundation and federal sources. As Rainbow Stage approaches its 75th anniversary, the City of Winnipeg and partners are ensuring this cultural icon remains viable for another 75 years.
Permits: 25-230906 RE-2025-11-05, Interior and Exterior Alterations. Optional Professional Certification Program Permit. Rainbow Stage - Interior and exterior alterations for an existing tenant in an existing multi-storey, single-tenant building (located within Kildonan Park at 2015 Main Street) to include partial demolition; repaving at the main entrance, interior renovations to washrooms and other spaces including the diamond lounge, accessibility upgrades throughout, and the creation of an exterior plaza featuring a new open-air stage and a new concession stand. Structural, mechanical, and electrical work are being done.
55185885835_44db63af88_b.jpg


55184601482_7d2279942b_b.jpg


55185885840_73c26bffa0_b.jpg


55185648618_8af8697629_b.jpg


55185748869_ab9beea6d6_b.jpg


55185748874_07c0f8a7d0_o.png
 
Last edited:
The development on that part of Scotia looks appropriate for the area. i can't see too much opposition to it.

The update to Rainbow Stage is welcome, though I liked the murals they are removing.
 
^ THAT'S an interesting challenge. There's nothing that comes immediately to mind as a "natural" redevelopment for that site.

Residential? Tough to get people to live there, surrounded by a lot of light industrial shops.

Commercial? it would have to be subdivided into a number of units, and who would use it other than another light industrial use?

Mixed residential/ commercial? Maybe, but it could take years or decades to get enough people living there without adjacent developments from the city to make the area more attractive.

Housing for homeless people? Maybe, but a ton of up-front money, and in all honesty, that would probably be seen an an impediment to rehabilitation of the area.

Medical? An addictions treatment/long term care facility? A new medical clinic/treatment centre for the people in the area is probably much needed, but it's so tough to staff and equip the facilities we already have, I don't know where the money would come from.

1x1 architecture explored an adaptive reuse opportunity of the site for GRENS. There's potential here, especially with the new Point Douglas Neighbourhood Plan and the possibility of a new urban National Park in the area.

53 Higgins
1x1 was engaged to reimagine a historic building in Winnipeg’s Point Douglas, which was originally part of the Ogilvie Flour Mill. The existing six-storey building and horn-shaped one-story structure are being transformed to accommodate new office space, tenant spaces and shipping areas which will complement a new state of the art manufacturing facility.
The project preserves the original heavy timber and masonry in the six-storey building while integrating modern design elements and connecting the main and second floors to foster collaboration. Existing building upgrades include amenities such as new exit stairs, elevators, and HVAC systems which will enhance safety, accessibility and comfort. New openings in the exterior masonry highlight the company’s business operations and bring daylight into the office spaces while offering views to the nearby river.
The new manufacturing facility, designed with cross-laminated timber, nail-laminated timber and glulam beams and columns mimics the structure of the existing building, while contrasting its solidity with the introduction of silicone glazed triple-pane glazing along the street facade. This glazing is supported by an angled CLT structure which creates a lenticular effect, allowing visibility and light into the manufacturing floor while providing much needed solar shading late in the day.

Client: Undisclosed
Type: Commercial, Industrial
Construction Value: Undisclosed
Date of Completion: 2024 Design Complete, Unbuilt
Area: 6,400 s.m renovation / 3,380 s.m. new.

Consultant Team:
Architecture: 1x1 architecture inc.
Civil: Sison Blackburn Consulting
Structural Engineer: Wolfrom Engineering
Mechanical/Electrical: Epp Seipman Engineering


23024-GRENS-1-1250.jpg


23024-GRENS-2-1250.jpg


23024-GRENS-3_1250.jpg


23024-GRENS-4_1250.jpg


23024-GRENS-5-1250.jpg


23024-GRENS-6_1250.jpg


23024-GRENS-7-1250.jpg


23024-GRENS-8-1250.jpg


23024-GRENS-9-1250.jpg


23024-GRENS-10_1250.jpg


23024-GRENS-12_1250.jpg


23024-GRENS-13_1250.jpg


23024-GRENS-14_1250.jpg
 
^ THAT'S an interesting challenge. There's nothing that comes immediately to mind as a "natural" redevelopment for that site.

Residential? Tough to get people to live there, surrounded by a lot of light industrial shops.

Commercial? it would have to be subdivided into a number of units, and who would use it other than another light industrial use?

Mixed residential/ commercial? Maybe, but it could take years or decades to get enough people living there without adjacent developments from the city to make the area more attractive.

Housing for homeless people? Maybe, but a ton of up-front money, and in all honesty, that would probably be seen an an impediment to rehabilitation of the area.

Medical? An addictions treatment/long term care facility? A new medical clinic/treatment centre for the people in the area is probably much needed, but it's so tough to staff and equip the facilities we already have, I don't know where the money would come from.
the owners tride to redevelop the land for housing the city refused to allow it
 
1x1 architecture explored an adaptive reuse opportunity of the site for GRENS. There's potential here, especially with the new Point Douglas Neighbourhood Plan and the possibility of a new urban National Park in the area.

Well that would be resources well spent to develop the site. I am uncertain as to sanitary and storm capacity along Higgins.

The linear federal parkland proposed down Higgins to the point would help to move developments along as well.
 
Last edited:
The development on that part of Scotia looks appropriate for the area. i can't see too much opposition to it.

The update to Rainbow Stage is welcome, though I liked the murals they are removing.

Yeah, that lot on Scotia has been empty for ages and have made that development look incomplete. glad to see something plugging this lot.
 
Well that would be resources well spent to develop the site. I am uncertain as to sanitary and storm capacity along Higgins.

The linear federal parkland proposed down Higgins to the point would help to move developments along as well.

It's a 36in brick lined line under the tracks with cement bottom. That fallows point Douglas Avenue. Not sure what size the feeders are prolly 8in?. But did the city ever fix the collapsed line by gateway?
 
It's a 36in brick lined line under the tracks with cement bottom. That fallows point Douglas Avenue. Not sure what size the feeders are prolly 8in?. But did the city ever fix the collapsed line by gateway?

If that's the sub interceptor sewer pipe the owner of the Gateway land was blocking access to in 2024, I believe the work was done after the city disallowed Gateways holding company's appeal of letting the city access their easement for the pipes
 
If that's the sub interceptor sewer pipe the owner of the Gateway land was blocking access to in 2024, I believe the work was done after the city disallowed Gateways holding company's appeal of letting the city access their easement for the pipes

gateway got fined over that sewer mess in 2000? or somthing and then the city got egg on their face and fine instead if i remember and part of why that became such a mess back there
 
Feds, city, province partner with Shoal Lake 40 to build 150 apartments
Scott Billeck
By: Scott Billeck
Tuesday, Apr. 7, 2026

The federal government has announced more than $51 million in combined funding to build 150 apartment units in Winnipeg’s St. James neighbourhood.

The development, located at 2675 Portage Ave., will include one-, two-, and three-bedroom units and is led by Shoal Lake 40 First Nation, marking its first housing project in the city.

Shoal Lake 40 Chief Herb Greene said 61 of the units will be considered affordable, while the remaining 89 will be offered at fair market value.

“This development is about three things: history, teamwork, and the future,” Greene said during a sod turning ceremony on Tuesday. He noted for more than 100 years, Winnipeg was in dire need of a reliable source of clean drinking water.

“In fact, 106 years ago, in 1919, clean drinking water started flowing to Winnipeg from Shoal Lake, through the aqueduct, built on part of the Shoal Lake land. While it led to isolation of our community, many hardships, Winnipeg was able to flourish and grow as a modern city. We are now coming to the city’s aid again.”

The initiative is being highlighted as an example of economic reconciliation, with Indigenous leadership playing a key role in urban housing development.

Housing, Addictions and Homelessness Minister Bernadette Smith said the project will be bring together people from different walks of life.

“Mixed income (housing) is going to see people that are doing well, but people who are also struggling,” she said. “They can see someone that is making good income. They can say to them, ‘Hey, you’re driving a nice car. You’re wearing nice clothes. You’re carrying around a beautiful purse. Maybe they’re an architect, maybe they’re a lawyer. Maybe that’s the spark for them to go back to school to become that.

“It’s going to be transformative, it’s going to bring change. That’s the kind of housing you’re building.”

The project is being delivered through a partnership involving the federal government, Manitoba Housing, and the City of Winnipeg.

Ottawa is contributing $43.5 million through the Affordable Housing Fund, while the City of Winnipeg is providing $2 million via its Housing Accelerator Fund Capital Grant Incentive program, which is designed to boost housing supply and reduce barriers to development. The city is also providing $4.4 million in tax increment financing.

The housing accelerator fund supports municipalities that streamline planning processes and promote faster construction. As part of this initiative, Winnipeg has secured more than $30.6 million in housing accelerator funding tied to its housing action plan, which focuses on expanding multi-family housing and increasing overall supply.

Meanwhile, the province is contributing $1.5 million through a grant from Manitoba Housing, and Shoal Lake 40 is adding $1.6 million in cash equity.

Federal officials say the project aligns with the newly launched Build Canada Homes initiative, designed to accelerate affordable housing construction, reduce homelessness, and expand options for low- and middle-income Canadians.

Leaders from all levels of government, alongside Shoal Lake 40 First Nation, say the project will help ease housing shortages while supporting economic growth and job creation.

Free Press
 
As an FYI for people, this is the Paragon project next to the Dairy Queen.

Yes, that's correct, it received HAF from the round 1 of awarded projects.

2675 Portage Ave
Location: 2675 Portage Ave
Developer: Shoal Lake 40 First Nation | Paragon Design Build
Architect: Affinity Architecture Inc.
Status: Partial Permit-Foundation
Documents: Media: RNR Restaurant (Formerly Perkins) on Portage Avenue Closes to Become Apartments-Access Winnipeg
Description: A proposed seven-storey mixed-use development led by Shoal Lake 40 First Nation at 2675 Portage Avenue in Winnipeg's St. James neighbourhood—on the former site of a long-standing restaurant—will deliver approximately 150 residential units, with around 40% designated as affordable to support community members and broader residents. The project includes one ground-level commercial unit, transforming a prominent Portage Avenue corner into a vibrant hub that enhances housing options, promotes affordability, and contributes to sustainable urban growth along this key corridor.
This development is a recipient of the Housing Accelerator Fund Capital Grant Incentive & this development is a recipient of the Affordable Housing Now program.
Permits: 25-208023 MU 2025-11-21, Construct New. "Affordable Housing Support", Construct a 7 storey + basement, 144209 sqft mixed use multi-family dwelling building, with 150 residential units & 1 CRU on the main floor.
54520562916_de5fd6a075_c.jpg
 
Seems like projects greater than 6-floors (i.e. not wood framed construction) require some degree of government incentive to get off the ground.
 
How we’re tunnelling under the Red River for a critical sewer pipe repair
A Microtunnelling machine is working around the clock near the Fort Garry Bridge

April 7, 2026

IMG-WW-Tunnel-Machine-808x454.jpg

The Microtunnel Boring Machine being set up along the Red River near the Fort Garry Bridge.

Thousands of people cross over the Red River on the Fort Garry Bridge every day. Right now, we’re doing the opposite. We’re going underneath it. A tunnelling machine is working around the clock, carefully drilling deep below the river. It’s all so we can make critical sewer pipe repairs.

Why we’re going under the river

Under our streets and rivers are a series of sewer pipes. They take wastewater from our homes and businesses to our treatment plants.

Unfortunately, the sewer pipe crossing under the Red River near the Fort Garry Bridge failed in 2023. We put in place a temporary above ground bypass. This allowed us to keep the wastewater flowing to the treatment plants while we developed plans for permanent repairs.

A challenging repair job

This work requires highly specialized equipment and incredibly skilled equipment operators. Installing pipes on a vertical curve that moves through various ground conditions is also very complicated.

“This type of tunneling is very complex,” said Ryan Lucky, Design and Specification Engineer with Water and Waste. “It’s tricky to enter the bedrock through mixed soils and you need a contractor who knows what they are doing. Only a handful of them can do this type of work in North America.”

Another challenge we faced was it took a while for us to get some of the materials needed for this job. This is part of the reason why this critical repair has taken this long.

How we’re able to make a tunnel

To do this work, we’re using a special drill called a Microtunnel Boring Machine (MTBM). It was lowered 17 metres down into the earth. Last week, it started drilling a roughly 2.4 metre wide tunnel underneath the river.

IMG-WW-Tunnel-Setup-808x454.jpg


IMG-WW-Tunnel-808x454.jpg


“Microtunneling is ideal for installing large sewer pipes over long distances, under both existing infrastructure and environmentally sensitive areas like waterways,” said Lucky. “It allows us to install the pipes without disturbing the Red River.

The machine digs a tunnel with a rotating cutter head that grinds soil and rock, turning it into a slurry. That slurry is then carried through the pipes back to the surface where the debris gets filtered out. We're then able to reuse it.

A slow and cautious process

The MTBM is working 24 hours a day, in two 12-hour shifts, for a total of 18 days. Hydraulic jacks will push it through a path underneath the water. Eventually it will make its way upward toward the sewer connection on the other side.

It’s a process you can’t rush. The machine travels about 1.25 metres per hour and is operated remotely by employees on the ground. The only time anyone will go down to the machine is if it needs to be repaired.

Installing the new pipe

The MTBM isn’t just making the tunnel, it's also pushing the new casing pipe forward through it. Then, the two wastewater carrier pipes will be pulled into that casing pipe. That will carry sewage across the river.

This allows for an under-the-riverbed trenchless pipe installation without having to divert water or dig into the riverbed.

We expect the new crossing to be in service this summer. We’ll then be able to remove the bypass pipe we installed in early 2024.

Once it’s removed, we’ll lift the traffic restrictions near the bridge on Abinojii Mikanah.
City of Winnipeg
 
Seems like projects greater than 6-floors (i.e. not wood framed construction) require some degree of government incentive to get off the ground.

88% of all multi-family rental housing development in Canada is supported by CMHC. Either loans or grants.
 
That tunnel is preeeeeety fancy to put some sewer pipes in. The tunnel itself will hold smaller sewer pipes inside.

Elsewhere as part of the combined sewer relief program, these same size and type of tunnels hold the actual water flows from the storm sewers. TBM bored micro fancy tunnels.

Also elsewhere in the city, such as under Munroe Ave by where I live, there are old combined sewer tunnels that are of similar size. The one below Munroe is a 2m by 3m egg shape for example.
 
The District At Bridgwater - Residences
Location: 375 Centre Street
Neighbourhood: Bridgwater Centre - Waverley West Ward (Assiniboia Community Committee)
Developer: Private Pension Partners
Architect: MMP Architects
Status: In development
Documents: Subdivision and Rezoning, Variance – April 14, 2026 | Plan Approval – & Submitted Plans November 16, 2026
Media:
Renderings
Description:
The developer plans to divide the site into two lots and rezone one of them to Commercial Mixed Use. On that 2.65-acre lot, they intend to build a six-storey, 70-foot-tall apartment building with 132 residential units and 16,240 square feet of retail on the ground floor. The project includes 209 parking stalls—more than the bylaw requires—and 30 bicycle parking spaces. Access will be via the existing driveway off Centre Street, shared with the second lot through a cross-access agreement, with no new driveways proposed.
Permits:
55195340978_101b57d038_c.jpg


55195446414_4f9a0a2e2e_c.jpg


55432493341_0c863e83ca_b.jpg


55657394306_684e3845a8_b.jpg


55657779690_e70eb72019_b.jpg


55656376032_2998f58900_b.jpg


55656377097_936232588d_b.jpg


55657494448_7aaa6a5a84_b.jpg


55657786655_8844bb6880_b.jpg


55657496748_98deeb80b3_o.jpg


55657362281_42204e7caf_b.jpg


55656383927_6af44e03b6_b.jpg


55657530163_21f3d24b06_b.jpg


55656417882_2aa76252cf_b.jpg
 
Last edited:


Back
Top