Stormer
Active member
Maybe a new tower
Yup... in 20 years
Maybe a new tower
Official start to road construction season. Took a video while I was over there. https://www.youtube.com/watch?v=2Od5p1hu_as
https://www.flickr.com/photos/reginaconstruction/
![]()
![]()
I thought population growth has slowed down so many apartments being builtTwo pile drillers at the Costco site now. If I had to guess April 1st seems like a nice round date for start of construction. The number of permits for the new apartment area on the south side of Westerra is up to 41. Continuing to insulate the new Harbour Landing school. The part of the building on the north end is being heated, so they might be pouring the concrete floors.
I just noticed the "Now open" sign on the new building on Pinkie Road, which explains why there were no cars at the old Omagakii location when I took off from there. A few weeks ago the person who filled my propane tank at the Coop gas station said there is a Walmart going in at the old Omagakii site.
Harbour Landing School video: https://www.youtube.com/watch?v=NpRdah1UTnA
https://www.flickr.com/photos/reginaconstruction/
![]()
![]()
![]()
![]()
![]()
![]()
Yup... in 20 years
It is notable that the new bridges and the Winnipeg street bridge all allow for six lanes underneath. That is the next project on the Ring Road, along with improvements to the Ross Ave interchange.
I think it has been 10-15 years since we had a summer without Ring Road construction.
Stranger things have happened
Nearly $1 million in federal grants alone for the Skuare event space beside there, so nothing is getting built there anytime soon.
It's some sort of design build project where they are allowed to design it as they go. The Government just gave them minimum specs and the DB team gets a lot of leeway. I recall the original budget seemed extremely cheap to me.
EDIT: I looked into this further. The Province allocated $20 million in 2024, but that was not for the whole project. Site prep and foundation was a separate contract and was done before the full design was completed. I recall thinking that $20 million for 240 beds seemed really cheap. It turns out the full cost is $56 million or $244,000/bed. Seems expensive, but that is what things cost around here these days.
Cost is way higher - somewhere in the range of $200M. It's progressive design-build project, but at this stage they should have a pretty good idea of what the final cost will be. Would be nice for the government to share that with the people paying for it.
They should of built it years ago , the prices of construction are insane
Well the other problem is that Regina is going to need ten more of these buildings ten years from now. There's going to be a crisis with elder care.
https://www.facebook.com/share/p/18S3qHPfq2/?mibextid=wwXIfr
That empty Staples building in Regina’s east end? It might not stay empty for long.
The city has received a zoning request to convert it into a car dealership (Olympic).
Which leads to the obvious question m
� Does Regina need another car dealership?
Or would you rather see something else go in there?
Coffee shop? Grocery? Gym? Something totally different?� What would you put there if it was up to you?
Well the other problem is that Regina is going to need ten more of these buildings ten years from now. There's going to be a crisis with elder care.
...and once the new LTC facility is built they are shutting down Pioneer Village which means 93 beds lost.
The future of these places is going to be humanoid robots. I would bet that in 10-15 years 80% of the workers will be robots.
I'm not as bullish on the performance of humanoid robots in real-world applicatiions.
https://flic.kr/p/2s4KThP
This Costco does anybody have any idea how much it cost to build this thing?
It won’t be long till this whole area is all filled up