DENVER | Main Development Thread #7


I'm thinking that Carmel moved forward with construction of 3300 Blake partly because they were 'registered' before the new affordable unit requirements went into effect. Good guess the same is the case for 4003 Walnut.

Likely a part of the decision.

The guy I talked to on site last week made some mention of, "it's probably not the best time to start this project..."

But keep in mind that they paid $27.5M for the site and it has been fully cleared for about two years now.

Could it also be a little bit of FOMO? As I mentioned earlier, there is a ton of projects in various stages of the pipeline in the RiNo area - Formativ at 38th/Blake, 3900 Blake, 4003 and 4000 Walnut, Denargo Market, Wynkoop North, NWSS Complex, Denver Rock Drill, the Pepsi Bottling site, etc. Does the early(ish) bird get the worms?
 
Could it also be a little bit of FOMO? As I mentioned earlier, there is a ton of projects in various stages of the pipeline in the RiNo area - Formativ at 38th/Blake, 3900 Blake, 4003 and 4000 Walnut, Denargo Market, Wynkoop North, NWSS Complex, Denver Rock Drill, the Pepsi Bottling site, etc. Does the early(ish) bird get the worms?
I really like the location for 3300 Blake.

It was interesting to read how OZ Architects totally redesigned the 4003 Walnut project to make it more economic to build. It also benefits from being in an Opportunity Zone. Building more affordable 'market rate' apartments sounds like a smart strategy.

I don't see FOMO being relevant. But it's fair to say that developers make money by building things.

But it's much harder now for various reasons. It's likely that the best construction loan they can get would cover only maybe 60% of the estimated project cost. Also, developers have their reputations on the line. If they want to be able to continue to raise money they don't want the finished product to be a bad investment.
 
My biggest concern is that too many people seem content to let Denver stagnate

I'm thinking mostly of the Denver City Council (and certain outside interests). I would not include Mayor Mike.
This was hilarious:

Denver mayor’s ‘Trumpian’ comment sparks pushback from councilmembers, safety advocates
Mar 3, 2026 By Hanna Powers -- KDVR

--------------------------------------

TODAY'S HEADLINE:

Downtown Denver office losses top a billion, with more to come
March 9, 2026 By Thomas Gounley -- BusinessDen
A billion dollars has vanished in downtown Denver. That's how much money office building owners and their lenders have lost so far in the wake of the pandemic, according to a BusinessDen review of transactions. And more losses are coming. “In some ways, it's an existential issue for the office market.
You previously mentioned the Pepsi Bottling site. Swire could not get an answer for when they could get electrical service to the property. Apparently the problem was mostly with the City and not the utility. So Swire canceled and happily found help in Colorado Springs.

Speaking of Colorado Springs they are aggressively pursuing Aerospace and Defense R&D as well as advanced manufacturing. They're not too proud to grow with industrial business.

Can you think of one way -- not counting the DDDA -- that Denver is trying to grow?
 
You previously mentioned the Pepsi Bottling site. Swire could not get an answer for when they could get electrical service to the property. Apparently the problem was mostly with the City and not the utility. So Swire canceled and happily found help in Colorado Springs.
I think you mean Coca-Cola (Swire). Pepsi did successfully relocate.

And the delay is 100% on Xcel. they are having a very difficult time in expanding the transmission and distribution headroom around the airport area due to supply bottlenecks and constraints to their engineering capacity. This issue recently let to DEN to begin exploring not just providing their own power (more long-term), but self-fund local distribution upgrades to provide

Speaking of Colorado Springs they are aggressively pursuing Aerospace and Defense R&D as well as advanced manufacturing. They're not too proud to grow with industrial business.

Can you think of one way -- not counting the DDDA -- that Denver is trying to grow?


COS has their own issues with trying to meet growing demand- especially for power. Their dumbass utility failed to forward plan, by not selecting projects are part of their RFP, to meet the state's decarbonization requirements and is now trying to push through legislation to specifically allow COS to push back their compliance by 10 years and to keep their remaining coal plant open. This initiative will likely fail as it doesn't provide a similar offramp for the state's investor owned utilities and the large electric cooperatives in the state have already procured resources so there's not much support outside of El Paso County.
 
I think you mean Coca-Cola (Swire). Pepsi did successfully relocate.

And the delay is 100% on Xcel. they are having a very difficult time in expanding the transmission and distribution headroom around the airport area due to supply bottlenecks and constraints to their engineering capacity. This issue recently let to DEN to begin exploring not just providing their own power (more long-term), but self-fund local distribution upgrades to provide

COS has their own issues with trying to meet growing demand- especially for power. Their dumbass utility failed to forward plan, by not selecting projects are part of their RFP, to meet the state's decarbonization requirements and is now trying to push through legislation to specifically allow COS to push back their compliance by 10 years and to keep their remaining coal plant open. This initiative will likely fail as it doesn't provide a similar offramp for the state's investor owned utilities and the large electric cooperatives in the state have already procured resources so there's not much support outside of El Paso County.
Thanks for the correction and Great clarification. I did do a quick search for the Springs utility buy didn't go any further.
 
I hereby nominate "Blucifer" to be the next Governor

This state needs help; maybe "Blucifer" knows the secret sauce.

Colorado on the way to record job losses for 2025 as data finalized
Mar. 10, 2026 By Sarah Mulholland -- CPR News
Colorado’s job market shrank in the middle of 2025, according to new data from the U.S. Bureau of Labor Statistics.

The state’s labor market contracted by 0.6 percent during the third quarter compared to the prior year, according to updated data from the federal agency. The overall U.S. job market grew by 0.1 percent during that timeframe, the data show.
How did this happen?
Wonhof noted employment weakness evident in a separate data set in sectors that are heavily concentrated in Colorado, such as professional and business services, mining and logging, and construction. “These sectors make up nearly a quarter of Colorado jobs,” he said.

Even so, Colorado’s job growth has been mostly lagging the U.S. rate for about two years. The precise reasons behind the slide aren’t clear.

What about Denver?
Job prospects in Denver, the state’s largest population center and economic hub, look particularly grim compared to the same time the prior year in the new federal data.
I'm nominating the Denver City Council for this achievement.
Denver’s job market shrank by 1.4 percent in the third quarter. That ranks the county 328th out of the 373 counties tracked by the BLS across the U.S.
No wonder there's so much apartment vacancy.

Is this data reliable?
The data set released Tuesday is based on information from unemployment insurance reports that companies across the U.S. are legally required to submit. That makes it a far more reliable data set than the initial monthly jobs reports.

The updated data suggest that Colorado’s employment numbers will be revised down when numbers are finalized in the coming months, CU economist Brian Lewandowski said.
Take me back to 2010?
The last time the state recorded job losses before the COVID-19 pandemic was in 2010, according to Lewandowski. The losses aren’t steep ... he said. But the downward trend matters.

"Blucifer" should tell somebody down at the state legislature that.... Businesses are in the business of CREATING JOBS. Who woudathunk that?

Meanwhile the legislature is looking to eliminate any business incentive they can find -- because they want even fewer jobs in Colorado? :koko:
 
By Golly -- Another Groundbreaking

Century Living Acquires Site for Luxury Apartments in Denver’s LoHi
March 11, 2026 -- Mile High CRE
Century Communities, Inc., a top national homebuilder, announced that Century Living, the company’s multifamily arm, has acquired a shovel-ready development site at 33rd Avenue and Mariposa Street in Denver’s sought-after LoHi neighborhood from Denver-based development firm Elevation Development Group.

Going forward, Century Living will serve as the developer and general contractor on the project—named The Stevie—with a groundbreaking this week and units expected to deliver for leasing in 2028. The Stevie is a five-story, 116-unit luxury boutique apartment community (including select loft units).

The Stevie

Century_Communities_The_Stevie_Apartment.jpg

Courtesy Century Living

The initial reporting was confusing. I'm still not sure whether Elevation Development Group was 'in title' or whether they had a contract to purchase. In any case there's this:
Elevation began the permitting process for the luxury apartment community in 2021, which enabled the deal with Century Living to come complete with land, architectural and engineering plans, and all entitlements and permits.
.
 
In the News

3850 Blake Street Topping Out Marks Major Milestone in RiNo
March 9, 2026 -- Mile High CRE
The Weitz Company, a subsidiary of Orascom Construction PLC, reached another major milestone on the 3850 Blake Street multifamily, commercial project in Denver, celebrating its structural concrete topping-out ceremony on March 6, 2026. ... the event brought together the project developer, Formativ, and project partners to celebrate the placement of the final concrete pillar.

Boulder Lands Largest Lab Lease Since 2022 As VC Fuels Optimism
March 11, 2026 By McKenna Harford -- Denver Bisnow
A small surge in life sciences leasing nationwide came to the Denver lab market at the end of 2025, with a 64K SF lease signed by CordenPharma Colorado becoming the largest lab lease in the market since 2022.

CordenPharma’s lease at BioMed’s Flatiron Park property in Boulder was one of four that made up 147K SF of leasing activity in the fourth quarter, according to CBRE. It is a positive sign after years of sluggish leasing activity in Colorado and across the country.
Metro Denver has always had an active Bio-Science sector but it pales in comparison to the size of many markets. That probably worked to Boulder's advantage as they had less vacancy to contend with. But the article also points out that even with new leases there was no "net" absorption.

Denver Marriott Tech Center Named Official Hotel Partner of Denver Summit FC
March 11, 2026 -- Mile High CRE

I had forgotten how large this hotel is with 605 guest rooms. But what the heck does this even mean?
Fans of Denver Summit FC can enjoy 20% off all stays at the Denver Marriott Tech Center when booked directly through the team website.

Construction Update: Phase One Underway at Cherry Creek West
March 12, 2026 -- Mile High CRE
Demolition work began this week for Phase One of Cherry Creek West. After years of planning and preparation, developer East West Partners and private equity firm Ascentris recently announced on the project’s website that construction is moving from vision to reality, starting with the demolition of the building where Elway’s, Brio, and the Container Store used to be, and the building formerly housing Macy’s furniture and Boulder Running Company. The former Bed Bath & Beyond building at 2500 E. 1st Ave. will remain and serve as a temporary construction office for Phase One.
As a demolition freak perhaps I should fly in and check it out? (NVM)
 
What’s the address for this? It definitely isn’t Mariposa and 33rd.

I had seen an address but now I can't find it as once I posted I deleted my bookmarks. The stupid internet quickly gets littered with sites that just regurgitate the original piece.

The DBJ said this: "Located at the unusual intersection of 33rd Avenue, Mariposa Street and Kalamath Street next to Interstate 25."

You can see the site here:
 
This isn't happening this year

Colorado Gears Up To Leverage Federal Affordable Housing Bump
March 10, 2026 By McKenna Harford, Denver Bisnow
Colorado affordable housing advocates hope to capitalize on the federal expansion of low-income housing tax credits by leveraging the state's own investments in funding.

Good looking group of developers

fit

Otten Johnson Robinson Neff & Ragonetti’s Andrew Peters, Archway Communities’ Laura Brudzynski, Housing Options Unlimited’s Susan Connelly, Carvell Architects’ Christopher Carvell, Kentro Group’s Chris Viscardi, Denver Housing Authority’s Joaquín Cintrón Vega and MGL Partners’ Dani Vachon Bell
Photo Courtesy of Josh Miles

With all the available funding, competition in the affordable housing market is growing, Dani Vachon Bell, development director at MGL Partners, said at
Bisnow’s Affordable Housing Summit on March 4, held at the Westin Denver Downtown.

But Vachon Bell said the threshold reduction for private activity bonds also allows MGL to get more creative with its projects.

“We’re looking at existing buildings that are maybe Class-C that we can convert to housing, and we’re looking at extended-stay hotels and how those could be
converted to affordable or even workforce housing, so we’re really trying to shake all of the trees,” she said.
NOTE: Legislation has now passed both chambers of Congress but the Senate made a few significant change to the House Bill so they'll need to try to work out their
differences in Conference.
 
Last edited:
One downtown office building -- the whole thing has been spoken for

AI Overview
Campos EPC, a Denver-based engineering firm, purchased a 11,365-square-foot, vacant two-story office building at 1509 Blake St. in LoDo for $1.48 million ($130/sq ft) on March 16, 2026. The firm, located nearby, plans to use the space to accommodate company growth, according to BusinessDen.

1509 Blake Street

1507-1509-Blake-St-Denver-CO-Building-Photo-1-Large.jpg

Courtesy LoopNet

-------------------------------------------------

Denver7 Ghost Lot on Speer Hits the Market as PMG Backs Off Build
March 13, 2026 By Leah Fraser -- Hoodline Denver
The vacant corner where Denver7 once broadcast to the city is officially up for grabs. Miami-based Property Markets Group (PMG) has begun marketing the 2.3-acre parcel at Speer Boulevard and Lincoln Street, saying it no longer plans to build there itself and is instead looking for partners or an outright buyer. With demolition finished and entitlements already in place, the block at 123 Speer Blvd. is one of the rare shovel-ready infill sites sitting just outside downtown.

Developer Puts Entitlements and Demolition on the Table

In an email to BusinessDen, PMG said it is "exploring options for new partners" now that the heavy lifting on paperwork and demolition is done. PMG bought the block in 2021 for about $35 million and took down the old station building last year, the outlet reported. For any incoming buyer, a cleared site plus entitlements can significantly shorten the timeline from closing to construction.

--------------------------------------------------

ICYMI

Total Effective Tax Rate by State (Federal + State) - Individuals
March 16, 2026 By Daniel de Visé, USA TODAY
As a percentage of median annual income in each state. Data covers the 2025 tax year (filing in 2026).
Sources: U.S. Census Bureau, TurboTax, Individual State Tax and Revenue Department Sites -- FINANCE BUZZ

NOTE: The article is interesting but the Interactive Map is waay cool.
 
Naked Denver posted new renderings for AVE - the new project at 40th/Blake & Walnut. I just refer to it that way as the article lists the property address as 1485 40th Street and it had been shown as 4003 Walnut.

bcb6e082-b365-4501-8544-2518769ab555.png


Here's a link to the article with additional images. You'll also see how much work has quickly taken place at the site. Installation of the shoring walls began this week, so that is a fresh update!

https://www.nakeddenver.com/post/new-renderings-revealed-for-ave-station-house-in-rino
 
Last edited:
New Address and New Name
Naked Denver posted new renderings for AVE - the new project at 40th/Blake & Walnut. I just refer to it that way as the article lists the property address as 1485 40th Street and it had been shown as 4003 Walnut.

Here's a link to the article with additional images. You'll also see how much work has quickly taken place at the site. Installation of the shoring walls began this week, so that is a fresh update!

https://www.nakeddenver.com/post/new-renderings-revealed-for-ave-station-house-in-rino
I rather like the name "AVE Station House." Also interesting neighbors with upscale One River North across the street from what will be a 'downscale' project. I see where they'll only have 82 parking spaces.

This is also nice:
At ground level, retail space is concentrated along Walnut Street, designed to activate the primary frontage alongside the residential lobby and leasing areas. The layout prioritizes pedestrian engagement in one of Denver’s most active development districts.

------------------------------------------

Here's an update on 3300 Blake from Naked Denver.

They started drilling the caissons this week, but it is a very different process than what I've seen on other projects in the area. The equipment has Geopier branding on it. You can read more about how they are different here: https://www.geopier.com/
Thanks for the Link; Geopier is quite interesting. I see where Geopier has their HQ in Davidson, NC.
 
BLOCK 162 -- In The Beginning

Block 162 Closes on Ground Lease, Marks Major Milestone in Downtown Denver Development
February 6, 2017 -- Mile High CRE
Denver, CO – Block 162, a parcel of land in downtown Denver, has been a long-time in the making. With several design iterations dating back to 2013, Block 162 finally marks a major project milestone with the closing on the ground lease, with a joint partnership consisting of Patrinely Group and USAA Real Estate Co., who joined forces to develop the land.

The project team consists of Patrinely Group, who will develop the office building, Gensler as the architect, and Cushman & Wakefield will represent the landlord as broker. The land lessor is Ephraim LLC represented by Evan Makovsky, NAI Shames Makovsky Realty.

AI Overview
Development Timeline and Features

Initial Concept (2016): The project was introduced as a potential development in early 2016.
Development Stage (2018–2020): Officially in development, the project moved forward with plans for 20 floors of office space, 13 levels of parking, and a sky terrace
Completion (2021): The Class-A office tower was completed and delivered.
Size: 30 stories, 595,000 rentable square feet.

BLOCK 162 -- The lease-up Updated

AI Overview
Block 162, the 30-story trophy office tower in downtown Denver, recently secured major leases, including Bank of America (approx. 29,000 sq ft) and local restaurant Leven Deli Co. (6,600 sq ft).

Engineering Firm HDR Leases 74K SF In Denver's Block 162 Office Tower
January 16, 2026 By McKenna Harford, Denver Bisnow
Engineering and architecture firm HDR will relocate its Denver offices downtown toward the end of the year, leasing space on three floors of the Block 162 office tower.

HDR is leasing 74K SF on floors 13, 14 and 15 for around 500 employees at Block 162, located at 675 15th St., according to the Denver Business Journal. HDR’s current lease at 1670 Broadway, where the company has been since 2013, expires in October.

With the HDR lease, DBJ estimates the building’s vacancy is below 13%. Around 72K SF is still available to lease.
 
BLOCK 162 -- The Next Chapter

675 15th Street

project-block-162-03-2000x1125_1681519289_1024x576.jpg


project-block-162-01-2000x1125_1681519178_1024x576.jpg

Images courtesy Gensler

JLL Investor Center -- Investment Opportunity
With zero new CBD office construction planned for the next decade, Block 162 is a generational asset that offers investors the rare combination of immediate cash flow stability, substantial mark-to-market upside, and the scarcity premium that defines trophy real estate investments.

Block 162, completed in 2021, is Denver’s premier trophy asset. The 30-story, 596,295 square foot world-class property features 20-floors of office space starting on Level 11, 12-floors of parking, breathtaking views, and extensive amenities, including a unique indoor/outdoor Sky Terrace.

Demonstrating its market leading position in the post-pandemic environment, Block 162 has achieved 501,675 SF of leasing since delivering in 2021, and is currently 70% leased, increasing to 87% leased in October 2026. The Building features a premier roster of tenants who will call Block 162 home for the next decade....
 
Mighty Interesting Development

3600 South Yosemite St

3600-S-Yosemite-St-Denver-CO-Primary-Photo-1-Large.png

Courtesy LoopNet

Only $12.00 sf and 3 Free Months Rent opex Includes Electic Amazing Building Amazing views Once in a Life Time Building to Lease Set up a showing now
What about parking?
Move-in ready office space with 197 surface parking spaces as well as underground, covered spaces.

oops.gif


https://www.denver7.com/news/local-...-collapse-at-southeast-denver-office-building
DENVER — A portion of a parking garage at a southeast Denver office building collapsed Monday, crushing two vehicles but leaving everyone unharmed.

It happened at a 10-story office tower at 3600 S. Yosemite Street.
 
Mighty Interesting Development

3600 South Yosemite St

3600-S-Yosemite-St-Denver-CO-Primary-Photo-1-Large.png

Courtesy LoopNet


What about parking?


oops.gif


https://www.denver7.com/news/local-...-collapse-at-southeast-denver-office-building

I recall that there have been other parking garage collapses across the country lately.

What nobody seems to talk about is how much heavier cars are these days (I worked for a major automaker for 25 years), particularly with the expansion of HEV/PHEV and BEV lineups. There is also the shift in the fleet from a 50/50 car/truck & SUV mix in 2000 to about 20/80 split today.

Just throwing it out there, but this isn't likely to be the last one.

Anecdotally, I was living in the DFW area when a tower crane collapsed onto an adjacent parking structure/apartment complex. It took several months before owners were able to retrieve their vehicles, which needed to be removed by crane.
 