General Vancouver Development Updates II


730 Raymur



That site is really just a few blocks from the rejected Westbank projects on Hastings
- so it'll be interesting to see how these go.

The site also backs onto the busy Burrard rail line (would that be double tracked?)

The proposed density is quite a bit lower than the Westbank towers. The site is opposite the seniors 'tower' and a big social housing site. There's been policy in the DTES to allow residential to replace the Kiwassa strip of warehouses that back onto the railway for many years, and Onni submitted a strata rezoning for a site a couple of buildings to the north, where they've had their concrete pumping business for years - but they haven't followed through with that yet. It's likely to face less problems in Council (although maybe not from the Strathcona Residents Association).

The DTES Plan requires the design to mitigate the noise likely to come from the rail line, and shunting. The plans to double track the line (and the grade seperation of Prior Street) were dropped. The Onni scheme had a 5m high concrete crash wall along the eastern property line, with the building set back an additional 10m from the eastern property line.
 
730 Raymur



That site is really just a few blocks from the rejected Westbank projects on Hastings
- so it'll be interesting to see how these go.

The site also backs onto the busy Burrard rail line (would that be double tracked?)

It's single track in that stretch.

I think Onni vacated the property the last time I walked by. That project was with the Clark/East Hastings redevelopment near the Chevron.

https://www.shapeyourcity.ca/1220-1298-e-hastings-st
 
1220-1298 E Hastings, & 560 Raymur St - Applications Delisted


https://council.vancouver.ca/20220705/documents/r7.pdf


https://www.shapeyourcity.ca/560-raymur-ave


https://www.shapeyourcity.ca/1220-1298-e-hastings-st

City Duo @City_Duo
It’s no wonder that after 7 years of review these 266 homes have been removed from Vancouver’s permit system. Not only are the 2 proposals mere blocks from the E Hastings St towers city council recently shot down, they underwent the same “policy enquiry process” too.
4:22 PM · Mar 20, 2026

https://x.com/City_Duo/status/2035134903973749242?s=20
 
More mini storage :rolleyes:

Building Grades BG-2025-00117 Completed
Application Date: Dec, 08, 2025
Issue Date:
Completed Date: Mar 09, 2026

Details
Related Information
Length of Property: 113 (m)
Work Description: This site(s) is currently zoned IC-2. Mini storage is listed as a conditional use. We plan to achieve 7 stories for storage.

Parcels
Parcel ID Address Folio Number
004-305-370 1677 W 2ND AVENUE, Vancouver, BC V6J 1H3 636-122-31-0000
015-278-565 1687 W 2ND AVENUE, Vancouver, BC V6J 1H3 636-122-27-0000
015-278-646 1695 W 2ND AVENUE, Vancouver, BC V6J 1H3 636-122-07-0000

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=283139896
 
Fire Department seems to believe it was an electric blanket that started it, though that's not been confirmed.

Osteria Otto on the ground floor had to close due to water damage, which is too bad because I think those kissa style bars that are popping up are really cool.
 
City lead redevelopment of the former Ramada Hotel site at 3475 E Hastings. It's currently being used for supportive housing as Skeena House.


https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=286296565

3475 E Hastings St rezoning application

3afdd522d6366bf845eea96fa925012e_Render.png


The City of Vancouver has received an application to rezone the subject site from C-2 (Commercial) District to CD-1 (Comprehensive Development) District. The proposal is to allow for the development of a 19-storey mixed-use building and includes:

176 social housing units;
Commercial and retail space on the ground floor;
A floor space ratio (FSR) of 6.01; and
A building height of 61.6 m (202 ft.).

https://www.shapeyourcity.ca/3475-e-hastings
 
They have a lot to do before construction, rezoning is still in progress.

The city is performing upgrades for the Thornton Pump Station, perhaps related to that.
 


Back
Top