MIAMI | E11even Hotel & Residences/Residences Beyond | 699 + 699 FT | 65 + 65 FLOORS


July 12, 2024

CyRZyDl.jpg
 
Another from July 12, 2024 with Signature Bridge project in foreground and a heck of a lot of cranes.

6 Tower cranes.
2 Crawler cranes.
2 Boom cranes.

10 cranes.

As an aside, I was coming west on the Veneition causeway recently and the E11even towers are going to look amazing from that perspective.

7RNZ2WI.jpg
 
Last edited:
https://www.thenextmiami.com/foundation-pour-completed-for-65-story-park-west-tower/

A foundation pour was completed over the weekend at the E11EVEN Residences Beyond tower in Park West, according to the developer’s social media.

A total of 760 concrete trucks were pouring 6,800 cubic yards of concrete, the post said.

It is the second E11EVEN tower to begin construction on the same block. Both towers are planned to top off at the same height of 699 feet above ground, or 709 feet above sea level, and will be connected by a skybridge.
 
Nice, except the cantilever part. I'm not a fan of that. Makes buildings look top-heavy. I like buildings that taper into a smaller crown, not the other way around.
 
The second Eleven tower is almost finished with its construction. Now that the construction is almost about to end, it’s time to place the windows, plus the fixtures and furnishings, and this project will be another great addition for Miami’s skyline!
 
The second Eleven tower is almost finished with its construction. Now that the construction is almost about to end, it’s time to place the windows, plus the fixtures and furnishings, and this project will be another great addition for Miami’s skyline!

The topping of the tower is almost finished, not the tower itself. The tower will take another year to be completed.
 
The first tower is now complete. The second is still under construction, and they blocked off the sidewalks and expect you to walk into oncoming traffic (which is agro Miami drivers) so thats always a positive
 