Coopertown expansion beyond current phase. It looks like they are planning to set aside space for an interchange at Fairway Road, though it will likely just be traffic lights. All the 9th Ave N intersections from Pasqua westward have space allocated for interchanges. I hope they twin 9th Ave N and put lights at Fairway sooner than later. I've seen many close calls there (people driving in the oncoming traffic lane to pass someone turning right) and it can be difficult to turn left onto 9th N when a lot of traffic is coming off the bypass.

https://www.regina.ca/export/sites/...pment/Public-Notice-500-N-Courtney-Street.pdf

Looks like a lot more Medium Density, which is what we are seeing everywhere. Also, the Neighbourhood Hub is looking a lot more like Major Arterial Commercial.
 
Last edited:
A large number of units in a single building will always be apartments.

An apartment is a type of dwelling, not ownership (a condo is a type of ownership).

Neville Drive will be rentals. Not many condos being built these days.
 
Mostly shots near downtown. I took a few videos that I still need to edit and upload. All the dirt that was used to temporarily fill in the creek in AE Wilson Park last summer was moved over to the McCarthy pumping station. They cleaned up part of the contaminated area while running new pipes to the pumping station and need to spread new top soil. There is still more contamination that needs to be cleaned up if the city plans to revive the dog park plan (its funding was diverted to the aquatic center).

New drone takes much better videos: https://www.youtube.com/watch?v=D-XhJ0IgpuI https://www.youtube.com/watch?v=C7-9wEC70dA

https://www.flickr.com/photos/reginaconstruction/

55080395249_6ae764111a_z.jpg
55080495925_9f7647bcbe_z.jpg


55080334928_57aa820927_z.jpg
55080335248_334f7d1200_z.jpg


55080139921_e59866fa71_z.jpg
55079241322_cd721d87ca_z.jpg
 
Last edited:
It’s been like six or seven months since they said the aquatic centre is gonna be starting construction still nothing on site
 
Total permits for the Riffel Highschool expansion are up to about 2.5 million between this year and last December. I noticed it last week when I was driving along McCarthy. 2 stories of structural steel with a staircase. I should get a few photos this weekend.
 
West Oak has pulled a $900K permit for its rehab project near the former GM assembly plant. Interesting building.

captures-752x512.png
 
Does anyone know if the City actually issued the RFP to develop the Yards?

A city employee called me this week to say it went out in January, and when I questioned them on it, they could not give me a concrete answer.
 