[Burnaby] Concord Metrotown | 230.1m | 65,45,33 fl | U/C


Another:

54960992729_5956896d57_b.jpg
[/url]20251202_114512 by globalbusinesscentre105 H, on Flickr[/IMG]

20251202_153220 by globalbusinesscentre105 H, on Flickr

20251202_153736 by globalbusinesscentre105 H, on Flickr

20251202_153208 by globalbusinesscentre105 H, on Flickr
 
Instagram post including inside.

Major milestones have been reached: the West and Central Towers have officially topped out,
and the Grand Tower has reached Level 40.

You can see that the glass screens are not airtight.

https://www.instagram.com/p/DTtWx_oiq21/?hl=en

QpNhvYo.jpeg

https://www.instagram.com/p/DTtWx_oiq21/?hl=en

I am surprised how short especially the West Tower ended up being, but it is still a massive complex and only a start for the area.

The towers look fine from outside but that indoors view is pretty brutal and looks like one would be living in a dark cave. :sly:
 
Around 20 more stories for Grand Tower

Momentum is building on site. Interior finishes are well underway, with kitchen cabinetry being installed, while railings and sliding panels continue to take shape throughout the towers.

Major milestones have been reached: the West and Central Towers have officially topped out, and the Grand Tower has reached Level 40—a significant step forward for this landmark development.

The project remains on schedule, with completion anticipated for late 2026 to early 2027. The vision is coming to life, floor by floor.

https://www.instagram.com/reel/DTtWx_oiq21/
 
Thanks gaviscon for the pictures :yeahthat::goodpost:
I've been driving by the site lately and was noticing that steel structure taking shape.
 