Page has been updated again, now reads that the single lane will open tomorrow on the 24th.
https://www.pattullobridgereplacement.ca/construction/bridge-opening/
Edit: Also confirmed on the projects’s Twitter.
Why open a single lane? :shrug:
It's not one specific word, this process is apparently a continuous one. Do you truly tell yourself that you off the top of your head you're ready to pronounce:
Ch’iyáḵmesh
Sts’áḵ’ay̓s
Spú7ets’
Stamsh
Swá7elt
Ch’iyáḵmesh
Sḵwx̱wú7mesh
Mámxwem
Saẁá7elt
Kwtsá7tsutsin
Kwékwetxwm
Txwn7us
Shisháyu7ay̓
Xwehúy̓shn
Yiyḵ’m
Ch’ax̱áy̓
Énwilh Spálhx̱n
Wéḵw’weḵw’m
Xwáẁchayay
Lhḵ’etksn
Stl’álḵem Staḵw
Nínich Ḵw’litḵm
Ḵw’pel
Ch’ích’iyúy Elx̱wíḵn
K’él’etstn
P’ap’ḵ’
Temlh
Those are just the signs up the Sea to Sky and at least they have English names beside them. We're also now supposed to know these place names in Vancouver:
Xpey̓
wək̓ʷan̓əs tə syaqʷəm
təməsew̓txʷ
ƛ̓éxətəm
təmtəmíxʷtən
sθәqәlxenәm ts'exwts'áxwi7
stal̕əw̓asəm
šxʷməθkʷəy̓əmasəm
Oh, but it's just one one specific name, "just learn it".
Did anyone else notice how irregular the asphalt surface was in the open lane? It hardly feels like new pavement that we were driving on when we crossed it. I noticed lots of small undulations driving on it.
It makes you wonder how rushed they were ahead of the lane opening. Recent weather isn't exactly ideal for paving and concrete work.
Why open a single lane? :shrug:
I went over it a second time and the traffic light at the end was functioning properly. The lane has a dedicated light over it now.
And because they've met their politician-approved "opening" before the end of 2025, they've closed that lane down today with no indication on when it'll re-open. https://www.pattullobridgereplaceme...lane-on-the-stal̕əw̓asəm-Riverview-Bridge.pdf
And because they've met their politician-approved "opening" before the end of 2025, they've closed that lane down today with no indication on when it'll re-open. https://www.pattullobridgereplaceme...lane-on-the-stal̕əw̓asəm-Riverview-Bridge.pdf
Traffic is being switched to the stal̕əw̓asəm (Riverview) Bridge in phases to allow for completion of the tie-ins to existing
roadways on either side.
At approximately 5 a.m. on Monday, January 5, the one northbound lane on the stal̕əw̓asəm (Riverview) Bridge will
temporarily close. All traffic will continue to use the Pattullo Bridge.
Subsequent traffic phases will take place in January and involve various lane configurations, including a one-week
closure of both bridges anticipated in mid to late January. This work is weather dependent, and specific dates will be
communicated when they are confirmed.