SFUVancouver
Active member
Happy birthday, SkyTrain!
Hands down, the best regional rapid transit system in the country.
Hands down, the best regional rapid transit system in the country.
I wonder if the city and Whitecaps do get an agreement on a stadium / entertainment district at Hastings Park, does that speed up a Skytrain line in that area? North Shore or spur off another line?
I wonder if the city and Whitecaps do get an agreement on a stadium / entertainment district at Hastings Park, does that speed up a Skytrain line in that area? North Shore or spur off another line?
Signal priority means very little: the opening target time is apparently 46 minutes end-to-end, or 13km/h average.
Most RapidBuses manage 20km/h+. Finch West with signal priority will be fighting to keep up with a RapidBus without it. And the RapidBus doesn't cost billions.
Glad we avoided that turd sandwich here.
And yet there are still people on this board who think it is a good idea to have a streetcar running through Downtown/South False Creek/Arbutus. The selection of LRTs in North America is an entirely vibe-based decision to look European, ignoring that the primary goal of transit users is to get from A to B quickly and reliably. LRTs and streetcars fail to achieve that. If you want transit that is not grade separated and is slow, we have that; they're called buses.
"Oh but LRTs have higher capacity than buses." Capacity is not ridership, and if your system is slow, ridership will suffer.
"Oh but this city has LRTs that have average speeds up to 30 km/h +." Yes and that's only because it's mostly grade-separated. If only that had fully committed to grade separation, the trains could be automated and even faster for about the same money.
LRT: All the billions of a Subway with the speed and reliability of a bus!
LRT is billions but not the billions of a subway. The Ontario line's latest cost estimate is about $27 billion for a route that is 15.6km meaning - assuming the cost doesn't increase further - it will be just over $1.7 billion per km. Meanwhile, the final cost of the Finch line is estimated to be just over $3.5 billion for a 10.3km route meaning it costs less than 20% as much per km. More than it should have which is the case for all major transit projects in Ontario (and much of the western world) lately. But calling it, "All the billions of a Subway" is factually incorrect.
And the ridership on the Finch corridor was already very high before the LRT, back when it was served by slow buses. So clearly that slowness didn't drive ridership down enough to avoid the need for a capacity upgrade. And the speed, once running at full design speeds, will be slower than some express bus routes because it will have more stops which is something the community requested during the public consultation phase. For comparison, the R1 King George Blvd rapid bus route is almost exactly the same length as Finch but has 12 stops compared to Finch's 18. In other word, Finch is a local route upgraded to improve capacity, comfort, and efficiency. It is not an express route. That's a characteristic of the design of that specific line and not of LRT as a technology. If it had 1/3 fewer stops then obviously it would be a lot faster.
LRT is billions but not the billions of a subway. The Ontario line's latest cost estimate is about $27 billion for a route that is 15.6km meaning - assuming the cost doesn't increase further - it will be just over $1.7 billion per km.
Maybe not quite, but it's sure more billions than a bus route that can provide competitive service.LRT is billions but not the billions of a subway.
Whereas a subway here is $518m/km, so you're basically just confirming what everybody already knows: that Metrolinx is good at throwing money down a hole.
- snip -
You can't throw around the word "efficiency" when the route is practically the same as a bus route that costs billions more.
On the ridership comparison, even the the project's own projections say this is a failure. They project about 51,000 daily riders by 2031 compared to the bus's 42,600 riders, which is really bad ridership growth for rail. Usually when a rail line goes in, the rail has ridership that doubles or triples the old bus routes (for example the Canada Line and Evergreen extensions). And no, there isn't a saturated transit ridership market, as evidenced by Toronto's heavy car traffic. There is a lot of room for growth and projects like these do nothing to boost ridership.
So we have the same ridership as the bus, the same speeds of a bus, slightly tighter stop spacing, at the cost of a Skytrain.
Whereas a subway here is $518m/km, so you're basically just confirming what everybody already knows: that Metrolinx is good at throwing money down a hole.
$3.5 billion over 10km = $350M/km, which is about the same as the fully elevated Surrey-Langley Skytrain on a per kilometre basis ($375M/km), and is a better comparison than the Ontario Line since both SLS and Finch are on suburban stroads, whereas the Ontario Line is through downtown..
Maybe not quite, but it's sure more billions than a bus route that can provide competitive service.
If you're going to sink a lot of money into a transit route that has grown beyond the capacity of buses (and that's a lot of capacity, just look at the 99 B-Line), then you should at least get a decent service upgrade for your dollars.
My response was to someone who seemed to write off LRT as a technology by claiming that it it was as expensive as a subway but no better than a bus.
In Vancouver, the above statement is almost entirely correct. Both the Broadway and Surrey-Langley tram proposals offered the same service as the B-Line express buses they aimed to replace, in exchange for capital costs that were closer to the alternative SkyTrain options.
Your argument seems to be more light metro (which Eglinton is close to but isn't) over heavy metro; street-running trains do fine as a rich man's bus, but often fail as a poor man's rapid transit without proper separation.
My argument is that providing additional capacity and reduced operating costs is an upgrade that can be worthwhile as long as it has a better cost-benefit ratio than the alternatives. Even when it's more expensive than it should be...
FWIW, I've always wished Eglinton had been light metro. Unlike with Finch, I do think the wrong technology was chosen in that case, mainly due to so much of it being underground. I don't think light metro would have been much more - or maybe even any more - expensive since the extra cost to elevate what are now street-running sections may have been offset by not needing such large stations. The trains could have been shorter with light metro due to the high service frequency it enables, while not needing drivers would have greatly reduced the long term operating expenses.
That's EXACTLY my point. There was no need to throw money out the door on an intermediate capacity transit system like LRT (which would itself have to be replaced) because Vancouver was able to provide enough capacity with buses to bridge the gap until the ridership justified the construction of a grade separated solution....I'm not sure the 99 B-line is the best example of how a bus route can successfully handle higher capacity when the busiest part of the route is currently being upgraded to a higher capacity mode.
An underground BRT would be substantially cheaper to build than a conventional underground subway (heavy rail metro) system, with some estimates suggesting it can be an order of magnitude less expensive in terms of capital costs.
The primary reason for the cost difference lies in the infrastructure requirements and the nature of the vehicles:
Underground BRT:
-Underground BRT Tunneling Requires a simpler, potentially smaller tunnel diameter to accommodate single buses or articulated buses.
-Can use standard diesel/electric buses or hybrid buses, often without complex overhead catenary or third rails in the tunnel.
-Stations are simpler and less expensive to construct and maintain.
-Paved roadbed (asphalt or concrete) for rubber tires. Uses standard buses, potentially utilizing existing depots.
Subway (Heavy Rail):
-Requires a larger, more robust tunnel structure to accommodate heavier, longer trains with electrified third rails or catenary systems.
-Requires installation of rails, specialized roadbeds, and switches.
-Requires expensive electric power systems (third rail or overhead lines) for continuous operation.
-Stations are complex, often larger, and more expensive to build, light, secure, and clean.
-Requires specialized, more expensive rail vehicles and dedicated maintenance depots with rail connections.