Regina | 1222 15th Ave | 6 Stories | 20 M | Rental Housing


IMG-0554.jpg

Arwell Living
 
It looks like good progress has been made recently. They could conceivably be done for next fall.

Our current goal is Occupancy Q2 of 2026. We will update that based on the structure completion this summer. This build will be out of insulated concrete forms once out of the parkade level.
 
A Good Life Corp, is this project still active? There hasn't been much visible activity recently.

Hi PrairiePrince.

Yes the project has been moving along. While our Social Media has been a bit quiet lately, action on site has continued, including the 2nd floor suspended slab pour along with most exterior ICF Walls being erected with a pour of those walls slated right before Christmas. Two floors of interior walls have been pre-fabricated off site as well!
 
Hi PrairiePrince.

Yes the project has been moving along. While our Social Media has been a bit quiet lately, action on site has continued, including the 2nd floor suspended slab pour along with most exterior ICF Walls being erected with a pour of those walls slated right before Christmas. Two floors of interior walls have been pre-fabricated off site as well!

Thanks for the update. I am happy to hear that it is moving along and look forward to it taking shape.
 
Slowly but surely. Glad to see it still moving along as it is great for the area along with the College and Broad build. Curious to see if the Chuka project ever gets off the ground.

I was going to comment that I had seen building supplies stored in a nearby lot, when I noticed there are an awful lot of supplies up on the 4th floor now. Maybe they cleared out that lot to stop paying to store stuff there. The construction fence at the Chuka site was gone when I was past there last week.
 