Quote:
Originally Posted by AccordTR
Opens 2027. Ground work shortly.
|
Considering the utilities work for West Winnipeg Costco does back many years, I want to say five or more, there was a lot done before "construction started". I recall there was a discussion, likely here, how the sewer pipes put in the ground for the site may have been too small. That lead to Shindico (site owner) and Costco having a standoff with talk for a while the whole project was "cancelled".