Quote:
Originally Posted by officedweller
The metal trim on the path is wider than the concrete abutting the joint on the roadway.
So it's not screwed into the new joint's concrete as is - they had to carve out asphalt and then maybe widen the concrete base to screw into.
|
I think the worse bumps were the ones going over those interlocking metal joint covers.
There's a Google Maps streetview update with some guy on a bike from August in the bike lane. And the May 2021 update shows what it looked like when they were making those joint repairs.