Winnipeg Construction XI


Great news about the city archives. I visited them a couple times at their interim location and they are super knowledgable and helpful. They have an amazing giant map of Winnipeg from 120 or so years ago up on the wall.

The frees article got me thinking about Carnegie building all those thousand libraries for untold thousands of dollars a century ago and wondering what it would look like if the ultra rich of our day and age made a contribution to society of that level. When we adjust for inflation, how large a gift would it be?

What was it about society in those days that saw Carnegie decide he wanted to undertake that level of philanthropy? What is different today?
 
Great news about the city archives. I visited them a couple times at their interim location and they are super knowledgable and helpful. They have an amazing giant map of Winnipeg from 120 or so years ago up on the wall.

The frees article got me thinking about Carnegie building all those thousand libraries for untold thousands of dollars a century ago and wondering what it would look like if the ultra rich of our day and age made a contribution to society of that level. When we adjust for inflation, how large a gift would it be?

What was it about society in those days that saw Carnegie decide he wanted to undertake that level of philanthropy? What is different today?

It was probably the thought of wanting people to read more. Just like today, a lot of people in society have really, really, really bad takes on all things, because they're either uninformed, or don't read. So much oppression is intertwined with the ability to read. Very similar to the fall of many other ancient societies; they started to fall when people stopped reading. Amazing man to see to it that he wanted to make books and knowledge as accessible as possible to their fellow man.
 
Somebody here posted something about another high-rise in downtown not too long ago. Either in the works or a rumor, something to that effect.
 
There is fencing between Erin and Clifton near Notre Dame behind that Juvians restaurant. I also see Ernst Construction banners.

Does anyone have info on this?
 
I think it might be more strip mall. That was what was planned years ago but never got built. It could have changed though.
 
It looks like a 99-unit multi-family building was approved internally (without a public hearing) at 2750 King Edward St.

https://legacy.winnipeg.ca/PPD/Documents/CityPlanning/Reports/25-210580-VC.pdf

Does anyone know why a large building like this can be approved internally but the slightly-smaller building at 685 Westminster (Sherbrooke Inn parking lot) required a public hearing? Is this the new Malls & Corridors changes in action?

https://clkapps.winnipeg.ca/DMIS/ViewDoc.asp?DocId=27130&SectionId=&InitUrl=
 
Saw some more workers in the Boyd Building today. Looked up building permits and found the following permits issued recently:

25-229279 EC 388 Portage AVE New Multi-family Dwelling. Related Building Permit: 25-199452 MU. wiring for new multi family building Issued 2025-09-26
25-227415 MC 388 Portage AVE M1 - HVAC. Location of work within building - room number, floor, etc.: full building, all floors. Related Building Permit: 25 199452 000 00 MU. complete install Issued 2025-09-17
25-199452 MU 388 Portage Avenue Interior and Exterior Alterations. Concurrent Building Permit Submission Apartments: Change of Major Occupancy D-C Change of Use, Interior, and Exterior Alterations Landlord Work - 10 storey, Multi-tenant, Apartment Building. Scope of Work Includes: Convert Previous Office Building into a 108 Dwelling Unit Residential Building with 2 Main Floor CRUs. Structural Alterations: Reinforcement to roof system to accommodate new rooftop MUA. New window lentils. Exterior Alterations: New windows, man and overhead door(s) and new makeup air unit. Electrical and Mechanical Work being done. Issued 2025-09-26
25-196874 PC 388 Portage AVE New Multi-family Dwelling. Related Building Permit: 25-199452 MU. Location of work within building - room number, floor, etc.: 10 floors. new multi family Issued 2025-10-03
25-196283 DP 388 Portage AVE Permit. Development permit for a proposed change of use to an existing building to establish 99 dwelling units and two CRU units on main floor and mezzanine. Issued 2025-09-26

Hard to believe but I think the renovations in this building are actually going to happen.
 
Saw some more workers in the Boyd Building today. Looked up building permits and found the following permits issued recently:

25-229279 EC 388 Portage AVE New Multi-family Dwelling. Related Building Permit: 25-199452 MU. wiring for new multi family building Issued 2025-09-26
25-227415 MC 388 Portage AVE M1 - HVAC. Location of work within building - room number, floor, etc.: full building, all floors. Related Building Permit: 25 199452 000 00 MU. complete install Issued 2025-09-17
25-199452 MU 388 Portage Avenue Interior and Exterior Alterations. Concurrent Building Permit Submission Apartments: Change of Major Occupancy D-C Change of Use, Interior, and Exterior Alterations Landlord Work - 10 storey, Multi-tenant, Apartment Building. Scope of Work Includes: Convert Previous Office Building into a 108 Dwelling Unit Residential Building with 2 Main Floor CRUs. Structural Alterations: Reinforcement to roof system to accommodate new rooftop MUA. New window lentils. Exterior Alterations: New windows, man and overhead door(s) and new makeup air unit. Electrical and Mechanical Work being done. Issued 2025-09-26
25-196874 PC 388 Portage AVE New Multi-family Dwelling. Related Building Permit: 25-199452 MU. Location of work within building - room number, floor, etc.: 10 floors. new multi family Issued 2025-10-03
25-196283 DP 388 Portage AVE Permit. Development permit for a proposed change of use to an existing building to establish 99 dwelling units and two CRU units on main floor and mezzanine. Issued 2025-09-26

Hard to believe but I think the renovations in this building are actually going to happen.

Thank fuck public pressure worked. Such a beautiful building seemed at risk of demolition by neglect.
 
Discount gas is coming to Elmwood.

I noticed that there is work going on where the former McDonalds on Nairn was was located.

Checking the City of Winnipeg permit site there are a number of permits open for construction of a 204 Fuel station on that lot.
 
It looks like a 99-unit multi-family building was approved internally (without a public hearing) at 2750 King Edward St.

https://legacy.winnipeg.ca/PPD/Documents/CityPlanning/Reports/25-210580-VC.pdf

Does anyone know why a large building like this can be approved internally but the slightly-smaller building at 685 Westminster (Sherbrooke Inn parking lot) required a public hearing? Is this the new Malls & Corridors changes in action?

https://clkapps.winnipeg.ca/DMIS/ViewDoc.asp?DocId=27130&SectionId=&InitUrl=

I think it depends on whether any variances are required or if a subdivision is involved. I would guess the Sherbrook Inn development may have involved variances for parking or something.
 
Saw some more workers in the Boyd Building today. Looked up building permits and found the following permits issued recently:

25-229279 EC 388 Portage AVE New Multi-family Dwelling. Related Building Permit: 25-199452 MU. wiring for new multi family building Issued 2025-09-26
25-227415 MC 388 Portage AVE M1 - HVAC. Location of work within building - room number, floor, etc.: full building, all floors. Related Building Permit: 25 199452 000 00 MU. complete install Issued 2025-09-17
25-199452 MU 388 Portage Avenue Interior and Exterior Alterations. Concurrent Building Permit Submission Apartments: Change of Major Occupancy D-C Change of Use, Interior, and Exterior Alterations Landlord Work - 10 storey, Multi-tenant, Apartment Building. Scope of Work Includes: Convert Previous Office Building into a 108 Dwelling Unit Residential Building with 2 Main Floor CRUs. Structural Alterations: Reinforcement to roof system to accommodate new rooftop MUA. New window lentils. Exterior Alterations: New windows, man and overhead door(s) and new makeup air unit. Electrical and Mechanical Work being done. Issued 2025-09-26
25-196874 PC 388 Portage AVE New Multi-family Dwelling. Related Building Permit: 25-199452 MU. Location of work within building - room number, floor, etc.: 10 floors. new multi family Issued 2025-10-03
25-196283 DP 388 Portage AVE Permit. Development permit for a proposed change of use to an existing building to establish 99 dwelling units and two CRU units on main floor and mezzanine. Issued 2025-09-26

Hard to believe but I think the renovations in this building are actually going to happen.

So with The Boyd, restoration & conversion, is it 108 or 99 Residential units?
Both are listed?
Now to save The former Marlborough Hotel.
 
So I recently got news that the apartment building I live in sold.

The listing is still up, but it includes two buildings and two parking lots.

I am not sure the new owners intentions or plans, but the listing does mention that the parking lots are noted as having redevelopment potential.

Here is the brochure: Brochure
 
So I recently got news that the apartment building I live in sold.

The listing is still up, but it includes two buildings and two parking lots.

I am not sure the new owners intentions or plans, but the listing does mention that the parking lots are noted as having redevelopment potential.

Here is the brochure: Brochure


"• Rents are significantly below submarket averages.
• Suites can be repositioned to a higher rental standard"

this really feels like "renoviction" as a marketing feature
 
Yes... the brochure is definitely marketing to a certain kind of investor... :hell:

I am very much hoping they don't renovict me... been here 8 years. These buildings have a lot of people from different incomes so it would suck to loose a bunch of these affordable units to some slightly renovated BS.
 
Last edited:
pict0326ui0.jpg
 


Back
Top