I’m not sure where to put this observation so I’ll drop it here. I saw some thing this morning that I’ve never seen before.

I had to go through downtown and went over the Granville Bridge around 9:30. The left hand curb lane of Seymour from Davie all the way to Georgia was almost all taxis! I can only assume they were waiting to pick up cruise passengers at Canada Place! As anyone else ever witnessed that?

Cruise ship passengers flood Vancouver during busiest weekend of season

https://globalnews.ca/news/11266256/vancouver-busy-cruise-weekend/
 
This seems false. Perhaps in nominal dollar terms, but in every other metric I would imagine it is not.




"Municipal" might be doing a lot of the work in qualifying that statement. I still doubt the claim, but, if it's only against strictly municipal projects, it might be possible. You know, ruling out road projects with any provincial, regional/metro/translink, or federal planning/funding/work, the bar gets a lot lower.



Like, compared to any other road project carried out solely by the City of Surrey with no outside involvement, I can't think of anything else. 96 Avenue's big do around the Golden Ears construction probably wouldn't count, building King George way way back wouldn't count.


I'd buy that it's Surrey's biggest. BC's biggest... even BC's biggest municipal*, that's a real lofty claim.


You're probably right with that "nominal dollar terms" bit.
 
The Hwy 1 WB Kensington off-ramp which is currently being completely rebuilt is being done in concrete. Hopefully this project solves the seemingly endless ground settlement issues.
 
Pavement repairs are planned for the Highway 1-Kensington Avenue interchange, as the Ministry of Transportation and Transit completes crucial safety improvements along this busy route.

Starting Wednesday, July 2, 2025, the westbound offramp from Highway 1 to Kensington Avenue and one northbound lane on Kensington Avenue will remain closed, 24 hours a day, seven days a week until the end of August while repair work is underway.

The ministry is undertaking this work to address pavement settlement issues that have resulted in bumpy conditions for motorists along the Kensington Avenue interchange. Full closure is necessary to allow crews to safely complete the repairs.

https://news.gov.bc.ca/releases/2025TT0064-000588

Here's the PDF of the Kensington Off-Ramp Settlement Remediation plans from the contractor:

https://web.archive.org/web/2025052...-1_-_h1_kensington_suggested_cons_staging.pdf
 
And we can start a new day counter on when the new company hits an overpass.

A new trucking firm in B.C. has links to Chohan Freight Forwarders Ltd., a company the province shut down after it was involved in multiple overpass crashes, a Postmedia News examination has found.

It’s unclear whether Legacy Pathways Ltd.’s links to the former company violate B.C. Motor Vehicle Act regulations, but the Transportation Ministry said its commercial vehicle safety enforcement branch “is aware of concerns regarding Legacy Pathways Ltd. and is investigating.”

https://vancouversun.com/business/n...d-overpass-crashes-chohan?itm_source=trending
 
This is just my little corner of the world but I though I'd post it anyways. I will post the final product.

Upcoming new one-way out of Maxine Lane on to Drake St. at Burrard St.
Dug a big hole for updating drainage and other matters ?
New traffic and bike path signals.


https://makeagif.com/i/WPNjSS

One-way going East will stop these accidents from happening.

https://youtu.be/rL1wROiV4PE?si=IKXCbfZryx6Vhon5
https://youtu.be/bdhCZEzasgk?si=GPFdlFPhcqm3wt9E
https://youtu.be/yFKyEXAmCC8?si=yN436MRqPCukWV4l
Car hits cyclist on bike path Burrard at Drake
https://youtu.be/0-6B8TluaYo?si=l11uv6RZLt3maYfE

But the East left turn accidents will continue.

https://youtu.be/MGIuwZ7eerE?si=7CDF3OfJ_qWeM9bB
https://youtu.be/_bV9MZzWrCo?si=-i7sxEn9r0EOrzxr
 
This is just my little corner of the world but I though I'd post it anyways. I will post the final product.

Upcoming new one-way out of Maxine Lane on to Drake St. at Burrard St.
Dug a big hole for updating drainage and other matters ?
New traffic and bike path signals.


https://makeagif.com/i/WPNjSS

One-way going East will stop these accidents from happening.

https://youtu.be/rL1wROiV4PE?si=IKXCbfZryx6Vhon5
https://youtu.be/bdhCZEzasgk?si=GPFdlFPhcqm3wt9E
https://youtu.be/yFKyEXAmCC8?si=yN436MRqPCukWV4l
Car hits cyclist on bike path Burrard at Drake
https://youtu.be/0-6B8TluaYo?si=l11uv6RZLt3maYfE

But the East left turn accidents will continue.

https://youtu.be/MGIuwZ7eerE?si=7CDF3OfJ_qWeM9bB
https://youtu.be/_bV9MZzWrCo?si=-i7sxEn9r0EOrzxr

OMG. One of those is the accident I was in! Wild seeing this on video.
 
OMG. One of those is the accident I was in! Wild seeing this on video.
Cool! I mean not cool that you were in an accident but that I captured it :)
Please tell me you were not the motorcyclist, if so I would have many question,
first are you ok and why wasn't your helmet (chin strap) straped on, the helmet went flying 10 meters down the road.
(I came to this thread after noticing a jump of views in my accident videos)

EDIT: And work continues at that intersection, tore up more sidewalk and redesigning.

Yesterday... I will post a timelapse when completed.

WPGY7Nt.jpeg
 
Last edited:
Nah, I was in the November 2015 crash. Before they added the bike lane and made changes to the lighting. Other than a sore face from the airbag for a day or two, no medical issues. But it was a stressful time for sure dealing with ICBC and everything.
 
Nah, I was in the November 2015 crash. Before they added the bike lane and made changes to the lighting. Other than a sore face from the airbag for a day or two, no medical issues. But it was a stressful time for sure dealing with ICBC and everything.
"no medical issues" good to hear. Yeah, stress can be more damaging to the body than broken bones. Nice to hear from you, hopefully next time under better circumstances :cheers:
 
Meanwhile the Port Mann Bridge has been a complete cluster**** the entire week. Driving into Surrey, especially North Surrey is a total gongshow these days. No surprise that this is happening...tons of new developments and return to office mandates with zero infrastructure improvements or lane expansions.
 
Meanwhile the Port Mann Bridge has been a complete cluster**** the entire week. Driving into Surrey, especially North Surrey is a total gongshow these days. No surprise that this is happening...tons of new developments and return to office mandates with zero infrastructure improvements or lane expansions.

Huh, isn't this the exact demonstration of "just one more lane will fix things" being false? After all, the Port Mann went from five lanes to ten lanes, surely that should have fixed it?

Maybe we should instead build infrastructure that encourages mode switching for people who are able to do so so there's not as much congestion for vehicles that can't switch?
 
Huh, isn't this the exact demonstration of "just one more lane will fix things" being false? After all, the Port Mann went from five lanes to ten lanes, surely that should have fixed it?

Maybe we should instead build infrastructure that encourages mode switching for people who are able to do so so there's not as much congestion for vehicles that can't switch?

No. The old port Mann bridge had crazy backups all day long. The difference is night and day
 
huh, isn't this the exact demonstration of "just one more lane will fix things" being false? After all, the port mann went from five lanes to ten lanes, surely that should have fixed it?

Maybe we should instead build infrastructure that encourages mode switching for people who are able to do so so there's not as much congestion for vehicles that can't switch?

100%
 


Back