Testing around Place d'Orleans Station yesterday.
• Video Link
EDIT: testing on Sunday.
• Video Link
EDIT: testing on Sunday.
Last edited:
What's Next for the O-Train: Line 3 to Kanata Explained
Ottawa's Stage 2 LRT is expanding O-Train service further West from Tunney's Pasture to Moodie Station. However, this still falls short of directly servicing the growing community of Kanata. With plenty of questions surrounding what's next for the O-Train, we take a look at the proposed Stage 3 Extension into Kanata. From the planned routing, to the stations and locations, this is your full look at the currently proposed Line 3 expansion.
It is important to note that this plan is neither approved or funded, but has had extensive planning work done. Through review of the environmental assessments and project studies, we distill the most key information you need to know.
If this project is of interest to you and you would like to see it become a reality, reach out to your local councillor, MPP and MP to ask for their support to fund the O-Train Line 3 extension into Kanata.
• Video Link
The point is providing fast, reliable service... to people. As many people as possible, hence why ridership potential is important since there are countless routes that could be upgraded while funds are limited. In other words, it isn't about whether or not it's a good thing; it's about whether or not the funds could be used to upgraded any other route to improve service for more people.
But if they weren't being honest about that stretch having low ridership then it's good the route is being extended. But they'd have to have been very dishonest indeed for a tunnel to make sense.
19 Years ago, our Mayor announced Transit City, which would have seen a network of LRT's criss-crossing the outside of the core along with Eglington. It was fully funded by the city, province, and feds, and then along came Rob Ford, who cancelled it in favour of subways.
Now, 11 years after Rob Ford cancelled Transit City, built no subways, and two mayors later, we are still waiting for the Eglington Line to open.
.
Point of clarification - it was never fully funded. The Feds never committed and while there was notional Provincial funding it was scaled back / deferred by the McGuinty government in 2010 to an initial phase including Eglinton, the SRT replacement and Sheppard East LRT. And on a significantly longer timeline than originally proposed. Notably the Jane LRT was pushed back as it was purely conceptual at that point and likely couldn't have been constructed as a purely above-ground system due to constraints along much of the corridor. Ditto Don Mills (which is now being done as part of the Ontario line). This was prior to Rob being elected as mayor who tried to cancel the rest. While he was in office the Sheppard East line was officially cancelled, then resurrected and eventually deferred for instance. Eglinton went along as planned and eventually Finch.
There's a lot of discussion about Transit City over the years and while I was quite angry at the time in retrospect it maybe for the best. The centrepiece line (also the lions share of costs) will be online in several months and IMO a lot of the other lines weren't particularly well thought out. The SRT replacement is probably the biggest loss, though as a whole Scarborough voted for that as a subway. As much as I can't stand the Fords the inclusion of the Ontario line as an expanded DRL will be more impactful than the entirety of Transit City sans Eglinton.
Alas? What's wrong with the extension?
It's not of any use to me, but it seems like it ties the rest of the valley in with Whalley and the rest of Central Surrey.
What's Next for the O-Train: Line 1 to Barrhaven Explained
Ottawa's Stage 2 LRT is expanding O-Train service further West from Tunney's Pasture to Algonquin Station (Baseline). However, this still falls short of directly servicing the growing community of Barrhaven. With plenty of questions surrounding what's next for the O-Train, we take a look at the proposed Stage 3 Extension into Barrhaven. From the planned routing, to the stations and locations, this is your full look at the currently proposed Line 1 expansion.
• Video Link
In a press conference about the unrelated Yonge North Subway Extension on Wednesday, Metrolinx interim CEO Michael Lindsay was, naturally, asked about the more pressing transit initiative on all of our minds: the Crosstown.
"We're in the middle of serious trial-running of the system right now," he told reporters, adding that "these vehicles are 10 years old and they're only just now beginning to run the kilometres intended for revenue service. As we do that, we find out what their maintenance profile is and we get a picture of how to keep them in service."
Yes, you read that right: the reason for the new delays on the line is the countless past setbacks that have left our once-new LRT vehicles unused, unridden and aging.
Lindsay identified "vehicle reliability and availability" as the key problems found during this current "deliberate period of stress testing," saying that he's hoping teams are only "a few weeks away" from being able to declare these problems as resolbed.
Following that, there will be a 30-day revenue service test "to demonstrate the system is safe and reliable when it opens," which, if it proceeds hiccup-free, will enable Metrolinx to declare the line substantially completed.
Michael thinks this time may come, based on the latest data, "toward the end of September," but reiterated that it's all contingent upon what other bugs make themselves known in the coming weeks.
Eglinton Crosstown LRT vehicles now so old due to delays that they're adding more delays
https://www.blogto.com/city/2025/08/eglinton-crosstown-lrt-vehicles-delays/
.
Eglinton Crosstown LRT vehicles now so old due to delays that they're adding more delays
https://www.blogto.com/city/2025/08/eglinton-crosstown-lrt-vehicles-delays/
This is just fucking embarrassing at this point.
Wow, what a joke.
Has anyone pointed out the main cause of the massive Crosstown delays by now? Or is it a collective of a bunch of small issues?
Great to see.First Light Rail Vehicle for Valley Line West arrives in Edmonton
August 6, 2025
The first Light Rail Vehicle (LRV) for the Valley Line West LRT has arrived in Edmonton, marking a major milestone for the project.
Shipped in two sections from Hyundai Rotem Company’s facility in Changwon, South Korea, the vehicle underwent extensive testing before being loaded on July 1 onto a roll-on/roll-off ship designed to carry wheeled vehicles. The ship crossed the Pacific Ocean and arrived at the Port of Tacoma, Washington, on July 20. The LRV was then transported by truck to the Gerry Wright Operations and Maintenance Facility in southeast Edmonton.
“The arrival of the first LRV is more than just a milestone; it’s a sign of momentum for the Valley Line West. Watching this train roll into Edmonton is a proud moment for our team and for the city,” said Brian Latte, Director, Valley Line West, City of Edmonton. “This LRV is a part of where we’re headed as a city. As Edmonton grows towards two million people, Valley Line West will change how we move, how we build, and how we connect with one another.”
Hyundai Rotem will supply 46 Valley Line West LRVs. Currently, there are 16 LRVs at various stages of manufacturing in South Korea. Delivery to Edmonton will continue into 2027. The 46 new vehicles will complement the current fleet of 26 LRVs operating on Valley Line Southeast. Both vehicles are designed to be fully compatible with the infrastructure of the entire 27-kilometre Valley Line.
“We’re proud to see the first LRV arrive safely in Edmonton. From initial design, to manufacturing and testing in Korea, to final delivery, this vehicle represents years of collaboration and a shared commitment to delivering a high-quality transit vehicle,” said Chiseung Kim, Project Manager, Valley Line West, Hyundai Rotem Company. “As the LRV manufacturer, Hyundai Rotem hopes that the LRVs we deliver will operate well in Edmonton and be helpful to Edmontonians in their daily lives.”
In 2023, Edmontonians were invited to participate in user testing and interact with a full-scale mock-up of the vehicle. Participants' feedback directly shaped the final design, helping ensure these vehicles are accessible, comfortable and inclusive for all riders.
Upon arrival in Edmonton, the vehicle was offloaded and will undergo final assembly. Testing and commissioning will occur on the Valley Line Southeast tracks at a later time, with measures in place to ensure this does not impact existing passenger service.
For more information:
edmonton.ca/ValleyLineWest
Photos available upon request
Media contact: