Downtown Vancouver Updates II


I guess LED is possible. Imperial Signs is doing the work and they replaced the Lonsdale Quay Q with LED

https://www.nsnews.com/local-news/n...ld and in with the Q,Quay opened 32 years ago.

But seems like they also work with neon still like the Granville Island sign.

https://www.imperialsign.com/solutions/fascia/

Pic by me just now (west facing side).
I also forgot that Scotiabank updated its logo in 2019.
The globe is now a big dot.

fduGuSE.jpeg


Scotiabank-Emblem-700x394.png

https://logos-world.net/scotiabank-logo/
 
301 E Hastings - Salvation Army Temple - Demo Approved


https://council.vancouver.ca/20190612/documents/pspc1a.pdf


https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=264801252


https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=264661343

The demolition of the 75 year-old Salvation Army Temple at 301 E Hastings has been approved, despite its appearance on Heritage Vancouver’s Top 10 Watch List in 2016, & 2024. However, this site won’t sit empty for long.

A Navigation Hub could soon open here to provide an opportunity for individuals experiencing chronic homelessness to be “intensely supported” until at least 2027, while Vancouver Coastal Health’s long discussed redevelopment plans for this site are finalized.

https://x.com/City_Duo/status/1947403156507234586
 
Damn. I really like that building. I held out hope that they'd be able to rehabilitate it.

Another one bites the dust.
 
Reconfiguration of the office lobby at 1200 Burrard (TD Bank) at Denman/Burrard.

- Enlarging the main lobby of the building combined with an opportunity to include a coffee kiosk within the lobby
- Tenant improvement to update the interior finishes combined with the addition of a new contemporary exterior façade design complete with steel and glass canopies.
- Redesign the current plaza design to provide more opportunity for the public to sit, enjoy and inhabit
- Provide a new universal washroom in the main lobby to replace two existing accessible washrooms
- Reconfigured mail boxes and mail service room
- Upgrade of the lobby's electrical, HVAC and fire suppression system
- Reinstallation of plaza membrane, replacing plaza finishes and removing / replacing the existing plaza trees
- New accessible main entry combined with vestibule with additional convenience entrees/exits and a separate TD bank entry
- Upgrades to provide a new accessible / universal washroom, a reconfigured mail room and a service spaces

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=268296531
 
Davie & Burrard? I guess that means the older office building full of medical tenants isn't going anywhere for a while, despite St Paul's moving.

Hopefully enlarging means totally filling in the pointless plaza. It is just a magnet for a litter. They already had to gate off the "rock garden".
 
I have to admit that the steel columns and bolts are smaller than I would have anticipated for a building of this scale. Clearly, the structural engineers have signed off, but it's not quite what I was expecting.

I guess because there's so many steel columns the load is spread and they can use smaller hardware. I agree though, my (non-qualified) brain looks at it and thinks they should be bigger.

I'm excited to see this going up quickly!
 
Anyone have an Update on the 1210-seymour-st Building? They demolished the old Building in the last couple of months. But left the original concrete slab but then work has stopped. Nothing over the last Month.

Thanks for your time

Just noticed driving by that they now have an Excavator on site. I assume they are getting ready to remove the concrete Slab. Not sure how far down they will go or if there will be any parking or not.
 
Just noticed driving by that they now have an Excavator on site. I assume they are getting ready to remove the concrete Slab. Not sure how far down they will go or if there will be any parking or not.

They got another new street occupancy permit

Permission to close and occupy the sidewalk and curb lane to store 8'x14'6" ESC tank, and after hours pedestrian provision on the 500 block of Davie St as per accepted TMP.

(erosion and sediment control)

https://plposweb.vancouver.ca/Public/Default.aspx?PossePresentation=Guest&PosseObjectId=270230855

Power shack will be in the alley off of Seymour.
 
VAHA Burrard - Mass Timber Passive House

Easy one floor per week, a little more practice and maybe two floors per week.

This morning, pics by me - July 25, 2025

mQH5oX3.jpeg


U0Ky5VP.jpeg
 