Wonder if the new Ford bill will affect this rebuild.
Losing bus lanes not car lanes, so should be fine.
Wonder if the new Ford bill will affect this rebuild.
It's the same project. It started 3 years ago, been going ever since.I don’t think that it was too many years ago that the bridge was completely re-water-proofed. (The Google satellite view still shows the work in progress.) Why is that work being redone so soon? That seems like a waste of money. Or was that part of this project?
I do think that the ‘art’ that the rendering shows embedded into the sidewalk widening is better than just concrete. Adding benches might be nice if it doesn’t take up too much of the walking room. The rendering seems to show the benches on the widened portion of the sidewalks.
The timing on that page states “Construction: summer 2022” and “Final completion: end of 2026”. Does that mean that all of those times are shifted by three years? If the road will be shut down for an extended period, would it be possible to advance the Nicholas Overpass, or to delay this project (or its next phase), so that they can be done at the same time, instead of sequentially?
I don’t think that it was too many years ago that the bridge was completely re-water-proofed. (The Google satellite view still shows the work in progress.) Why is that work being redone so soon? That seems like a waste of money. Or was that part of this project?
I do think that the ‘art’ that the rendering shows embedded into the sidewalk widening is better than just concrete. Adding benches might be nice if it doesn’t take up too much of the walking room. The rendering seems to show the benches on the widened portion of the sidewalks.
The timing on that page states “Construction: summer 2022” and “Final completion: end of 2026”. Does that mean that all of those times are shifted by three years? If the road will be shut down for an extended period, would it be possible to advance the Nicholas Overpass, or to delay this project (or its next phase), so that they can be done at the same time, instead of sequentially?
> Be the city of Ottawa
...
> Reduce the Bank Street bridge to one lane in each direction with no ability for buses to go around an obstruction...
Bank Street bridge - over the Canal? It's three lanes total - two northbound and one lane southbound. North and south of the bridge it's still four lanes - and there's plenty of space for buses to pass in those areas.
Bank Street bridge - over the Canal? It's three lanes total - two northbound and one lane southbound. North and south of the bridge it's still four lanes - and there's plenty of space for buses to pass in those areas.
For me - the bridge has been vastly improved with bike lanes - it feels much safer and more pleasant to cross for pedestrians and cyclists.
Part of Mackenzie King Bridge in 'advanced state of deterioration'
CBC News - Arthur White-Crummey
Part of Mackenzie King Bridge in 'advanced state of deterioration,' city learns
Major components of the Nicholas Street overpass on the east side of the Mackenzie King Bridge are in an "advanced state of deterioration," according to a recent condition assessment.
Ottawa's Mackenzie King Bridge is in worse shape than expected, as the city learns that major components of the section over Nicholas Street are in an "advanced state of deterioration."
That's forcing the city to launch another rehabilitation project, over and above ongoing renewal work that has faced repeated delays.
The city is budgeting $5.4 million for the extra work over Nicholas Street, just east of the Rideau Centre, with the project schedule putting the completion date in the summer of 2027.
—snip—
https://www.cbc.ca/news/canada/otta...-in-advanced-state-of-deterioration-1.7578680
Sounds like the Nicholas span is going to have to be entirely rebuilt.
I hope that it bothers the Councillors that they can suddenly find out that a major structure is in an "advanced state of deterioration" and in need of emergency treatment. The condition of structures should be better monitored by staff and the conditions put forward for rehabilitation once a structure falls below the Good threshold.
Like Lansdowne and MANY other City assets, this should not be happening. One of the base requirements of the City is to maintain ALL of its assets in a Good State of Repair.
Agreed. The constant efforts to keep taxes artificially low results in important infrastructure not getting the maintenance needed, hence requiring early replacement, which is far more expensive in the long run.
I hope that it bothers the Councillors that they can suddenly find out that a major structure is in an "advanced state of deterioration" and in need of emergency treatment. The condition of structures should be better monitored by staff and the conditions put forward for rehabilitation once a structure falls below the Good threshold.
Like Lansdowne and MANY other City assets, this should not be happening. One of the base requirements of the City is to maintain ALL of its assets in a Good State of Repair.
And I may be wrong, but it sounds as if staff had the bridge listed as Good up until staff called in consultants who found the span to be in terrible condition. That is, staff had it wrong.
Why do we have city staff that can't do the job properly? Why do we always need to go out to consultants to get any answers? In my opinion, there needs to be a total house-cleaning at City Hall - starting with the Mayor. Maybe the Province can assign a group to come in and do that - like they did for the school board. Watching this city (not) work is so frustrating.
Yup, and it is also possible that the Good estimate was done 15 years ago.
My point is that the City should have competant staff to be able to do a proper job of running the city without the need to always go out to consultants.
I realize that some believe that simply paying consultants for everything reduces the City's long-term obligation to employees (no pension, etc.), but for me, the City needs to have a competant staff that can do the job.
There would, of course, be exceptions for one-offs. There is little benefit in keeping a staff member for a task that will only happen very occasionally. But for things like evaluating the City's assets, which should be done continually, there needs to be competent staff on-site.