Regina Construction IV


This site has lots of info about the original concept:

https://queencityib.com/blog/2022/8/5/the-sales-pitch-part-1



100K sf of commercial is never happening. there is zero demand for retail or office. Maybe a convenience store.

Taylor+Field+Anim+1.png

Agreed on the commercial. Maybe if Regina hits 450,000 and there is significant improvement in the area.
 
The commercial buildings were supposed to go along the tracks where residential is undesirable or prohibited. I would suggest the park should go there now and free up the central space for more housing.

This will also start establishing a green belt along the tracks. Is the practice field still there?
 
Some more photos: https://www.flickr.com/photos/reginaconstruction/albums/72177720325409071/

No start of work on either the 2nd Harbour Landing School or Long Term Care facility. School road work is continuing, haven't started building road for the LTC yet. Argle school is getting 2 more classrooms.

On the subject of schools, the North joint use school is getting a lot of stone (actually brick) work on the ground floor when I was past there earlier in the week. Such a huge building it is taking a long time to do the exterior. I'll have to stop by there Monday when the wind is lower.
 
Last edited:
Some pictures of the north joint use school. The rain conveniently stopped just before I got there. I saw mention on a website earlier in the week that the new school is just 12 feet from the old one at its closest point, and it is indeed tight in one spot. Also stopped by the north Albert bridge but not much change since last time I was there.

https://www.flickr.com/photos/reginaconstruction/albums/72177720325409071/

Arwel has been posting progress pictures every day or two of their project on 15th / Toronto. https://www.instagram.com/arwelliving/ (instagram requires you have an account to browse)
 
Last edited:
Again, $400K+ per door for apartments is not affordable housing. What a fiasco.

Would have been far cheaper to buy an outdated apartment complex, refurbish with new insulation, energy efficient windows and heating. Something like that seems to be going on in Regent Park (not necessarily as affordable housing). The townhouses behind the Safeway have been getting updated in phases over the past few years with groups of them being fenced off.
 
Would have been far cheaper to buy an outdated apartment complex, refurbish with new insulation, energy efficient windows and heating. Something like that seems to be going on in Regent Park (not necessarily as affordable housing). The townhouses behind the Safeway have been getting updated in phases over the past few years with groups of them being fenced off.

Agreed but that does not increase the net housing supply. They just need to be practical. No bells and whistles or do-gooders utopian concepts for amenities.

If they just build simple apartments and townhouses on the cheapest land, they will get the most housing in the end.
 
Agreed but that does not increase the net housing supply. They just need to be practical. No bells and whistles or do-gooders utopian concepts for amenities.

If they just build simple apartments and townhouses on the cheapest land, they will get the most housing in the end.

It's not that simple anymore, especially now that the cost of materials has skyrocketed.
 
A few pics from GTH. Just need to install a railway switch and bit more rail to connect the Cargill Plant to the CN line. https://www.flickr.com/photos/reginaconstruction/albums/72177720325409071/

My 2025 Tour du Regina is progressing well, I can usually cover most of the city before the spring winds end. East of the Ring Road is slower going since its about a 15 km ride to get that far.



The most thorough biking of the city was back in 2019. Its safe to say I'll never get to that level of detail ever again, which included some 4am rides of the entire Ring Road and Lewvan.

 
Last edited:
The tender mentioned a lettered parcel, so I did a search and came up with this parcel map https://thegth.com/footprint-map/. No lettering, but the plot beside GTEC is CAM Transport. There are a few other sold but empty plots including Amazon directly south of GTEC. The 40 acres beside Amazon says HOOPP, first search for that name is Healthcare of Ontario Pension Plan.

HOOPP's real estate investment arm has owned land at the GTH since 2013.
 


Back
Top